Loading...
HomeMy WebLinkAboutUP 01-150 PROJECT SUMMARY SHEET FILE -#,: UP 01-15 PROJECT TYPE: Use Permit APPLICANT: Paradise Evangelical Free Church ADDRESS: 5095 Pentz Road, Paradise, CA 95969 OWNER: same REPRESENTATIVE: None PROJECT DESCRIPTION: Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a E,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms PROPERTY ZONED: AR -1 (Agricultural Residential - 1. acre parcels) LOCATED: 'on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane; at 5095 Pentz Road, Paradise. AP#: 055-g90-083 TOWN/AREA: Paradise GENERAL PLAN DESIGNATION: Low Density Residential 1. Application complete: February 13, 2001 Amount: $ 1064.00 Receipt #: 19203 2. Comments sent to: . DDS, Public Works, Env. Health, Assessor, Building Manager, LAFCo, Air Quality Mgmt., Town of Paradise, Del Oro Water Co., CDF, Central Reg. Water Quality Control, Dept. of Fish and Game 3. Comments received from: 4. Rezone Petition Signatures Checked: 5. Mailing List/Lead-in Sheet: 6. Assigned To: Stephen Betts Environmental Determination: State Clearinghouse No: No Categorical Exemption-CEQA# Negative Declaration _:Y Mitigation Negative Declaration Subject to Fish & Game: No Environmental Impact Report Gen. Rule Ex. -CEQA # 15061.(bx3) Other 8. Staff Report: Project Video: S 9. Clearinghouse circulation required: Yes No Date Sent to SCH: 10. Publication Notice Written: 'S� o Display Ad Prepared: 11. Notices Mailed: Number of Notices: 12. Newspaper Publication Date: l S— D n C Cl B 13. Planning Commission Hearing(s): Action taken: Special Conditions: Commission Resolution No. 14. Board of Supervisors' Hearing(s): Action taken: Board Resolution No.: Ordinance No: Adopted: 15. Type Use Permit/Send for signature: 16. 17. 18. 19 N.O.E. / N.O.D. / APPENDIX Send validated Use Permit:_ Assessor's Memo: Copy of Use Permit / Variance to Planning Technician: ■ BUTTE COUNTY PLANNING COMMISSION ■ AGENDA REPORT 0., -AGE 15 ■ ii/6%3 Public Hearings and Timed Items 01-161 Public Hearing - Paradise Evangelical Free Church - Use Permit Appeal - consideration of two appeals: (1) an appeal of the Planning Commission's approval of a Use Permit to. allow an athletic field (baseball, soccer, etc.) and restrooms, and a.6,000 square -foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday School rooms; and (2) an appeal of a condition of approval (Condition No. 9) requiring a left turn pocket on Pentz Road. This is a project on which notice of intent to adopt a negative declaration with mitigation measures regarding environmental impacts has been given. The project is proposed to be developed in three phases: Phase 1 - Construction of the athletic field upon approval of the Use Permit; Phase 2 - Restrooms (one to two years after approval of the Use Permit); and Phase 3 - Gymnasium (two to five years after approval of the Use Permit). The athletic field will be used for games held by members of the church and for church league games. The applicant does not propose to allow non -church leagues (such as Paradise Recreation and Park District) or thegeneral public to use the field. The applicant anticipates that the field will be used for organized games three to four times per week. The property is zoned AR -1 (Agricultural Residential - 1 acre parcels), and located on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5097 Pentz Road, and identified as APN 055-590-083 (SB [File No. UP 01-15]) - action requested - STAFF RECOMMENDS THE BOARD DENY THE APPEALS AND APPROVE THE PROJECT, AND HAS PROVIDED TWO ALTERNATIVE ACTIONS FOR THE BOARD'S CONSIDERATION: 1. SHOULD THE BOARD CHOOSE TO DENY BOTH APPEALS THE FOLLOWING ACTIONS SHOULD BE TAKEN: A.• SUBJECT TO FINDING I(A) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, DENY THE APPEAL OF THE NEARBY LANDOWNER; 01-161 1. B. SUBJECT TO FINDING II(A) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, DENY THE APPEAL OF THE PROJECT APPLICANT; C. SUBJECT TO FINDINGS III(A-D) AS DETAILED IN THE STAFF REPORT'DATED MAY 22, 2001, ADOPT A MITIGATED NEGATIVE DECLARATION REGARDING ENVIRONMENTAL IMPACTS WITH THE FOUR MITIGATION MEASURES DETAILED IN THE STAFF REPORT DATED MAY 22,2001; BUTTE COUNTY BOARD OF SUPERVISORS - MINUTES - May 22,206-1 D. FIND THAT THE DESIGN OF THE PROPOSED PROJECT IMPROVEMENTS WILL NOT CAUSE ENVIRONMENTAL DAMAGE TO FISH AND/OR WILDLIFE OR THEIR HABITAT AND APPROVE A "DE MINIMUS" EXEMPTION TO THE COLLECTION OF FEES PURSUANT TO FISH AND GAME CODE SECTION 711.4(d)(3) AND 14 CCR 753.5, AS THE AREA SUBJECT TO DEVELOPMENT DOES NOT CONTAIN ANY SIGNIFICANT AMOUNT OF WILDLIFE HABITAT, AND THE UNDEVELOPED AREA ON THE PROJECT SITE THAT CONTAINS EXTENSIVE WILDLIFE HABITAT WILL NOT BE DISTURBED BY THE PROJECT; AND E. SUBJECT TO FINDINGS V(A-C) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, AND THE CONDITIONS OF APPROVAL AS DETAILED IN "EXHIBIT A" OF THE STAFF REPORT DATED MAY 22, 2001, APPROVE USE PERMIT 01-15 FOR THE PARADISE EVANGELICAL FREE CHURCH AND AUTHORIZE THE CHAIR TO SIGN. 2. SHOULD THE BOARD CHOOSE TO UPHOLD THE APPEAL BY THE PROJECT APPLICANT, THE FOLLOWING ACTIONS SHOULD BE TAKEN: A. SUBJECT TO FINDING I(A) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, DENY THE APPEAL OF THE NEARBY LANDOWNER AND. UPHOLD THE APPEAL BY THE PROJECT APPLICANT; B. SUBJECT TO FINDINGS II(A-D) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, ADOPT A MITIGATED NEGATIVE DECLARATION REGARDING ENVIRONMENTAL IMPACTS, WITH THE. FOUR MITIGATION MEASURES DETAILED IN THE STAFF REPORT DATED MAY 22; 2001; C. FIND THAT THE DESIGN OF THE PROPOSED PROJECT IMPROVEMENTS WILL NOT CAUSE ENVIRONMENTAL DAMAGE TO FISH AND/OR WILDLIFE OR THEIR HABITAT AND APPROVE A "DE MINIMUS" EXEMPTION TO THE COLLECTION OF FEES PURSUANT TO FISH AND GAME CODE SECTION 711.4(d)(3) AND 14 CCR 753.5, AS THE AREA SUBJECT TO DEVELOPMENT DOES NOT CONTAIN ANY BUTTE COUNTY BOARD OF SUPERVISORS - MINUTES - May 22, 2001 M SIGNIFICANT AMOUNT OF WILDLIFE HABITAT, AND THE UNDEVELOPED AREA ON THE PROJECT SITE THAT CONTAINS EXTENSIVE WILDLIFE HABITAT WILL NOT BE DISTURBED BY THE PROJECT; AND 01-161 2. D. SUBJECT TO FINDINGS IV(A-C) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, AND THE CONDITIONS OF APPROVAL AS DETAILED IN EXHIBIT "A" OF THE STAFF REPORT DATED MAY 22, 2001, WITH THE DELETION OF CONDITION NO. 9, APPROVE USE PERMIT 01-15 FOR THE PARADISE EVANGELICAL FREE CHURCH AND AUTHORIZE THE CHAIR TO SIGN. (3267)(**00) MOTION: SUBJECT TO FINDING I(A) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, I MOVE TO DENY THE APPEAL OF THE NEARBY LANDOWNER; SUBJECT TO FINDING II(A) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, I MOVE TO DENY THE APPEAL OF THE PROJECT APPLICANT; SUBJECT TO FINDINGS III(A-D) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, I MOVE TO ADOPT A MITIGATED NEGATIVE DECLARATION REGARDING ENVIRONMENTAL IMPACTS WITH THE FOUR MITIGATION MEASURES DETAILED IN THE STAFF REPORT DATED MAY 22, 2001; FIND THAT THE DESIGN OF THE PROPOSED PROJECT IMPROVEMENTS WILL NOT CAUSE ENVIRONMENTAL DAMAGE TO FISH AND/OR WILDLIFE OR THEIR HABITAT AND APPROVE A "DE MINIMUS" EXEMPTION TO THE COLLECTION OF FEES PURSUANT TO FISH AND GAME CODE SECTION 711.4(d)(3) AND 14 CCR 753.5, AS THE AREA SUBJECT TO DEVELOPMENT DOES NOT CONTAIN ANY SIGNIFICANT AMOUNT OF WILDLIFE HABITAT, AND THE UNDEVELOPED AREA ON THE PROJECT SITE THAT CONTAINS EXTENSIVE WILDLIFE HABITAT WILL NOT BE DISTURBED BY THE PROJECT; AND SUBJECT TO FINDINGS V(A-C) AS DETAILED IN THE STAFF REPORT DATED MAY 22, 2001, AND THE CONDITIONS OF APPROVAL AS DETAILED IN "EXHIBIT A" OF THE STAFF REPORT DATED MAY 22, 2001, FURTHER MOVE TO APPROVE USE PERMIT 01-15 FOR THE PARADISE EVANGELICAL FREE CHURCH AND AUTHORIZE THE CHAIR TO SIGN. S M VOTE: 1 Y 2 Y 3 Y 4 Y 5 Y (Unanimously Carried) CHAIR JOSIASSEN OFFERED TO HOST A MEETING FOR PROPERTY OWNERS AND THE CHURCH TO HELP FACILITATE COMMUNICATIONS ABOUT POSSIBLE MITIGATIONS OF IMPACTS TO THE SURROUNDING NEIGHBORS. SUPERVISOR YAMAGUCHI OFFERED TO ASSIST WITH THIS MEETING. —BUTTE COUNTY BOARD OF SUPERVISORS - MINUTES May 22, 2001 Paradise Evangelical Free Church, (Item on which a notice of intent to adopt a Negative Declaration with mitigation measures regarding environmental impacts has been given) Use Permit to allow an athletic field (baseball, soccer, etc.) and restrooms, and for a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project is proposed to be developed in three phases: Phase 1 - Construction of the athletic field upon approval of the Use Permit Phase 2 - Restrooms (one to two years after approval of the Use Permit) Phase 3 - Gymnasium (two to five years after approval of the Use Permit) The athletic field will be used for games held by members of the church and for church league games. The applicant does not propose to allow non -church leagues (i.e. Paradise Recreation District) to use the field. The applicant anticipates that the field will be used for organized games two to three t=mes per week. The property is zoned AR -1 (Agricultural Residential - 1 acre parcels). The property is located on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. APN 055-290-083 (SB) (UP 01-15) (VIDEO) A video of the site was shown. Mr. Betts gave a brief summary of the project. He said the construction will cause noise and staff is asking that the hours of construction be limited. He said the nearest neighbor is .100 feet from the property. 'He said the applicant does not intend to have night lighting which is a condition of the permit. The hearing was opened to the public. Imar Jacobson said the aim of this request is to better serve the community and to help the youth in the area. Commissioner Lambert questioned the restrooms being installed two years after the athletic field is put in. Mr. Jacobson said the church facilities will be available until then. Commissioner Marin said he has studied having a traffic light verses a left turn lane. He said the traffic needs to be slowed down for people coming to the facility. - Mr. Jacobson said'the present speed laws need to be enforced. Commissioner Marin said this property will be annexed into the Town of Paradise in the future. He said th--y should go to the Town and see what the Town wants, either a traffic signal or a left turn lane. Mr. Betts said staff requested comments from the Town of Paradise. He said the Town did not submit any recommended conditions for this project. He said the Town asked staff to check with other agencies, which they did. Mr. Jacobson said' Condition 9 for a left turn pocket on Pentz Road or provide an estimate and analyses, prepared by a registered engineer, of traffic generation and turning movements to the Public Works Department for review and comment, was agreeable. Mr. Betts said this condition was on the original church Use Permit. ■ BUTTE COUNTY PLANNING COMMISSION 0 MINUTES ■ APRIL 26, 2001 ■ PAGE 5■ Charles Kaza said this is a nice neighborhood. He said it is a residential area. He said 10 feet for a buffer between the field and the subdivision is not enough. He said when children on the base ball field lose balls they will go over the fence into the subdivision. Joann Knappenberger submitted fetters in opposition. She said she was led to believe this addition would be a small playground for small children. She said this project will impact up to Pearson Road. She said she is concerned the field area might be rented for soccer games and she objects to that. She said soccer games would not be in the interest of the immediate community. She said she is concerned that this field will become too busy and too active. She said the field would have to be kept green and this would impact the water in the area. She said residents are asked to conserve water. She said she would like this application tabled so more people can be contacted. She said this will ruin the neighborhood. Dick Dunkal said he owns the Golden Eagle Nest. He said he has been there for.30 years. He said he is concerned that his beer and alcohol license could be in jeopardy because of the proximity to children playing next door. He said there could be problems with vandalism. He said he would like this permit put on hold until they have more information. Beth Knappenberger said this field will impact the wildlife in the area. She said the field area has been cleared and she is concerned that more clearing will need to be done. Mr. Dunkal said the property between him and the church is abundant with wildlife and he would like- the area to remain as it is. Mr. Jacobson said the property is posted for no skateboarding or bicycles. Chairman Nelson asked Mr. Jacobson if he is working with the neighbors. Mr. Jacobson said he is surprised in his neighbors' change of attitude. He said he is willing to work with the neighbors. He said he wants an athletic field and not just a sandbox. Ted Biggs said that Pastor Jacobson is planning to leave the area, but the church is not totally run by the Pastor. Dick Hamilton, Director of the Church, said they have sought to keep activities under control. He said the church has actively posted signs and has talked to the children. He said vandalism has dropped in the area. Joann Knappenberger asked that there be no bleachers. She asked about changing the direction of the fi-ld if this permit is approved. Commissioner Leland said there is three hundred feet from the field to the neighbors.. He asked how far can children hit a soft ball. He did not see this as' a problem. The hearing was closed. Commissioner Marin said he thought this was a good project and that the people need to work together.. Commissioner Lambert asked about the wildlife in the area. ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES ■ APRIL 26, 2001 ■ PAGE 60 Mr. Betts said there are some resident deer, but this is not in a winter deer herd corridor. He said most of the area for the field has already been cleared. Chairman Nelson said if there is a small set of bleachers, they should be located as close to the middle of the field as possible. Commissioner Lambert asked about fencing the athletic field. Mr. Betts said that no fencing is proposed. Commissioner Leland said this is a good proposal. He said he did not see church activities for children bringing in crime to the area. He said the children will be supervised. He said the property is zoned AR -1 and he feels that this use would have less of an impact than one acre homesites would as far, as noise and interrupting wildlife. He said he thought this was a good project, good for the community. It was moved by Commissioner Leland, seconded by Commissioner Lambert, and unanimously carried to approve the Use Permit for the Paradise Evangelical Free Church subject to the findings and conditions listed below, adding a condition that no public outdoor address system will be allowed, -and limit the hours on the field to daylight hours modifying Condition 6. On Condition 6 add the sentence that states "No activity ;hall be allowed after dark and no public address system shall be allowed." Mr. Wilson explained that there is a 10 day appeal period. I. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act, that said study identified potential significant environmental effects and incicdes mitigation measures that would mitigate such effects below significant levels, and thit a Mitigated Negative Declaration'is proposed. B. Find that the Planning Commission has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process. C. Find, on the basis of the whole record before the Planning Commission, including the Initial Study and any comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will have a significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the County, which is the lead agency. II. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain any significant amounts of wildlife habitat. Therefore, a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made. The collection of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES ■ APRIL 26, 2001 0 PAGE 78 III. Approve Use Permit 01-15 for the Paradise Evangelical Free Church, subject to the condition,, found in Exhibit A, with the following findings: A. The proposed use of the property will not impair the integrity and character of ,the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfa-e and safety of the County because: 1. The athletic field will not be lighted. 2. Measures are required to be taken during construction activities to prevent fugitive dust emissions. 3. The times of construction activities are limited to prevent significant noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. 7. The applicant is required to submit to the Public Works Department an estimate .end analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that a left turn lane or other road improvements are needed, the applicant is required to construct the improvements prior to issuance of the Use Permit B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Plan land use designation allows quasi -public uses as Secondary Uses. Conditions of Approval: Planning Division 1. Measures shall be taken to control fugitive dust emissions from all civil construction associated wir"h development of the site. Standard Mitigation Measures to prevent or reduce fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES 0 APRIL 26, 2001 ■ PAGE 8■ 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. . 5. Use of the athletic field and the gymnasium shall .be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. No activity shall be allowed after dark and no public address system shall be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is date-stamped February 13, 2001, and is incorporated herein by this reference. Public Works Department 8.. Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S-18 road approaches and construct them to County standards, as specified in County Improvement Standards. 9. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct a left turn pocket on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works Department for review and comment. Any road improvements identified in the analysis as being required shall be installed by the applicant prior to issuance of the Use Permit. 10. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be *submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES ■ APRIL 26, 2001 ■ PAGE 9■ the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) Fire Department 11. Prior to the issuance of a building permit for the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire h-drant. Building Division 12. Building permits required. Prepare 4 sets of construction plans and make an application for permit. Construction shall comply with federal, state, and local regulations. Plans shall be prepared, lsealed and signed by a California Licensed Architect or Registered Engineer for non-residential bu=ldings and certain residential buildings. 13. All structures shall be made accessible to the disabled. Disabled accessible parking and an acc-,ssible path of travel shall be provided. 14. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. 15. Proposed improvements shall comply with Use Permit conditions applicable to construction. 16. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 17. ' Development fees for.the proposed residential or non-residential improvements shall be pai.1 prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. Environmental Health Division 18. Under County permit, upgrade the existing septic systems to accommodate increased develo::)ment. 19. Prior to issuance of the Use Permit, obtain approval fro the Del Oro Water Company that they are able and willing to provide the necessary flows to service the entire project. ' Other Conditions 20. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES ■ APRIL 26, 2001 ■ PAGE 10■ :17- 11/21/2003 8:38 AM Butte County Department of Development Services Pre -bill Worksheet Page 1 Selection Criteria Applicant (hand sel Include: UP 01-15 Nickname UP 01-15 11611 Full Name Paradise Evangelical Free Church Address 5095 Pentz Road Paradise CA 95969 Phone 1 Phone 2 Phone 3 Phone 4 In Ref To UP 01-15 Fees Arrg. By billing value on each slip Expense Arrg. By billing value on each slip Tax Profile Exempt Last bill Last charge 4/28/2001 Last payment 11/18/2003 Amount $84.75 Date Employee Rate Hours Amount Toaal ID Task Markup % DNB Time DNB Amt 2/5/2001 Steve B. 59.00 0.50 29.50 Billable 33861 P Processing 2/19/2001 Larry P. 59.00 1.25 73.75 Billable 34254 P Processing 3/5/2001 Steve B. 59.00 6.50 383.50 Billable 34326 P Processing 3/19/2001 Steve B. 59.00 2.00 118.00 Billabl'-- 34546 P Processing 4/2/2001 Lynn R. 45.00 1.00 45.00 Billable 34671 C Clerical 4/16/2001 Lynn R. 45.00 1.50 67.50 Billable 34995 C Clerical 4/28/2001 Lynn R. 45.00 1.50. 67.50 Billable 35111 C Clerical 11/21/2003 Butte County Department of Development Services 8:38 AM Pre -bill Worksheet UP 01-15:Paradise Evangelical Free Church (continued) TOTAL Billable Fees Total of billable expense slips Calculation of Fees and Costs Fees Bill Arrangement: Slips By billing value on each slip. Total of billable time slips Total of Fees (Time Charges) Total of Costs (Expense Charges) Total new charges Accounts Receivables DatellD Type Description 2/13/2001 CRED Deposit - Receipt #19203 1664 . 11/18/2003 PAY Payment 2550 Receipt #391328. Check No. 4388 Total Accounts Receivable New Balance Current Unapplied Total New Balance 14.25 Page 2 Amount Total $784.75 $0.00 Amount Total $784.75 $784.75 ($700.00) ($84.75) $784.75 ($784.75) $000 $784:75 ($784.75) Tuesday, November 18, 2003 Development Services PLANNING DIVISION ver. 1.0 Counter Person Diane (General Fund) Payment Date '11/17/2003 Receipt Number :391328 Received From :Paradise Evangelical Free .Church Applicant same Application Number UP 01-15 or In Reference To Parcel Number "055-290-083 Check Number/ Cash °4388 - Total Received $84.75 Total Fees $84.75 T! DDS Planning $84.75 (General Fund) Public Works $0.00 $0.00 Environmental Health CDF (Fire Department) $0.00 $0.00 NOD / NOE (Recording Fee) Aunt Minnie $0.00 $1, 500 or $2,000 Planning Review $0.00 Fish/Game $0.00 $0.00 ALUC $0.00 Non Sufficient Funds ($25.00 Fee) Cell Tower $0.00 $0.00 Public Sales /Copies $0.00 . Other: ----------------- COUNTY OF BUTTE 391328 "} OFFICIAL RECEIPT ^ OFFICE OR D�OTMENT ISSUING RECEIPT / l Received from Ref A-11-1-nom , &)a n ae c,,�/2w C� c-4 1%e Sum of jrL , Je, A t-CrQ S For O 5J Received: u p Received By �L)`� CASH ❑ Title CHECK Ef By DAVCO BUSINESS FORMS • (530) 743-6511 Form 75702 COUNTY OF BUTTE 391328 ^, OFFICIAL RECEIPT OFFICE OR DEP60TMENT ISSUING RECEIPT (�J Received from 7 S The Sum of tot) For - Received: /5" Received By CASH Title CHECK Ef By DAVCO BUSINESS FORMS • (530) 743-8511 Forth 75702 .. v COUNTY OF BUTTE AUDITORS CER i FICATE AND TREASURER'S RECEIPT OROVILLE, CA RECEIVED FROM PLANNING BAG 0 330 ATR NO 69049 DATE 1111812603 DE SSCRIPTI631oi FUND FUND DEPT TITTLE: CODE CODE ACCT CASH CODE CODE: AMOUNT DEPOSIT DATE:: 11-153 RECEIPTS: 391323-391331 ,'PLANNING APPL PEES OE NL W110 4.4001 4210900 loiool 785.13 Project Number Amount of Pee #055-290-083 Paradise Evngol ch UP 01-15 #040-2$0-106,107 lB Colby Co TSM 02-02 $670.38 AUNT MIB NIE: DEPOSITS PLAN -PERF TR 1001 280 1011W5 2,000.00 (11 19 ) Project Number Amount of Fee #0397370-092 S Holland ADM 04-08 $2,000 TOTAL $ 2§785.13 APPROVED BY: RECEIVED BY: AUDITOR -CONTROLLER TREASURER By: white=treasumr piny --auditor canary --depositor golden rad= ale 1 • Butte County Department ofDevelopment Services Administration - AR 7 County Center Drive Oroville, CA 95965 (530) 538-7601 Telephone Use Permit File: UP 01-15 APN: 055-290-083 Applicant: Paradise EvangelicalFree Church Date: November 5, 2003 '5095 Pentz Road Paradise,: CA, 95969 INVOICE UP 01.15 Planning charges are captured in arrears. At the date of this invoice, the following charges had been recorded and entered into our billin program. There may be additional charges in the processing of your application that have not yet been entered into the billing program, and ar not reflected on this invoice. Charges entered after this invoice date will be reflected on subsequent billings. At the time all charges are entere and billed, you will receive a FINAL INVOICE. The following payments have been applied to your application: Deposit Disbursement: Deposit Date: February 13, 2001 Environmental Health' $171.00 Receipt: 19203 CDF/Fire Department $43.00 Total Payment $1064.00, check 5200 Land Development $150.00 DEVELOPMENT SERVICES - PLANNING DEPOSIT $700.00 Receipt 19744, Check 3300 $25.00 NOD/NOE filing fee The following charges have been applied to the processing of your application: Professional Planner $531.00 Mapping 73.75 Clerical 180.00 TOTAL CHARGES: $ 784.75 The costs thus far in processing your application have exceeded the deposited/paid amount by: $ 84.75 I Butte County Code 3-44 Hourly fees; deposits; billing procedures. County code requires when the initial deposited funds are depleted to an amount equal to 25% of the original deposit, no processing of the application will occur until the applicant deposits sufficient funds to restore J balance equal to the amount of the initial deposit, or a lesser amount as determined by the Director of Development Services. In the event the applicant does not provide sufficient funds to continue processing an application, the application will be denied. Make checks payable to: Butte County Treasurer and send it to us at the above address. Should you have any questions, please call Accounts Receivable from 8:00 a.m. to 4 p.m., Monday through Friday. AMOUNT DUE AND PAYABLE .November 20-2003 � $4.75 L K:\FISCAL ADMIN\BILLINGS & REFUNDS\SENT BILLINGS\Para Evang Free Church Up 01-15 110503 � F 11/5/2003 Butte County Department of Development Services 1:18 PM Pre -bill Worksheet �1�►,�`�L.Q,UI., k Selection Criteria Applicant (handsel Include: UP 01-15 Nickname UP 01-15 11611 Full Name Paradise Evangelical Free Church Address 5095 Pentz Road Rate Paradise CA 95969 Phone 1 Phone 2 Phone 3 Phone 4 In Ref To UP 01-15 Fees Arrg. By billing value on each slip Expense Arrg. By billing value on each slip Tax Profile Exempt Last bill Last charge 4/28/2001 Page 1 n, .-7,3 f T?Oaf5:� Last payment Amount $0.00 K �—, /,- Date Employee Rate Hours Amount Total ID Task Markup % DNB Time DNB Amt 2/5/2001 Steve B. 59.00 0.50 29.50 Blllcble 33861 P Processing 2/19/2001 Larry P. 59.00 1.2573.75 Billable 34254 P Processing 3/5/2001 Steve B. 59.00 6.50 383.50 Billable 34326 P Processing 3/19/2001 Steve B. 59.00 2.00 118.00 Billable 34546 P Processing 4/2/2001 Lynn R. 45.00 1.00 45.00 Billaole 34671 C Clerical 4/16/2001 Lynn R. 45.00 1.50 67.50 Billa:)le 34995 C Clerical 4/28/2001 Lynn R. 45.00 1.50 67.50 Billa)le 35111 C Clerical 7� 11/5/2003 Butte County Department of Development Services 1:19 PM Pre -bill Worksheet UP 01-15:Paradise Evangelical Free Church (continued) TOTAL Billable Fees Total of billable expense slips 14.25 Amount Page 2 Total $784.75 $0.00 Calculation of Fees and Costs Amount Total Fees Bill Arrangement: Slips By billing value on each slip. Total of billable time slips $784.75 Total of Fees (Time Charges) $784.75 Total of Costs (Expense Charges) $0.00 Total new charges - $782.75 Accounts Receivables DatelID Type Description 2/13/2001 CRED Deposit - Receipt #19203 ($700.00) 1664 Total Accounts Receivable ($70C.00) New Balance Current $784.75 Unapplied ($700.00) Total New Balance $84.75 R-' DEPARTMENT OF DEVELOPMENT SERVICES BUTT:... OUNTY UNIFORM APWCATION ►PPLICANT: Anent information to be provtt]e(I is On other stae: APPLICANT'S NAME ( If applicant is different from owner an affidavit is required) ASSESSOR'S PARCEL NUMBER: Darpdise ua,M .I to F e -c thauh 0153 ADDRESS: r /� CITY,, STATE &(ZIP CODE: ROLE NUMBER: (FOR O CE USE) 1A99' f//�77 i_r�F7 IQ d pat�f�te ra 957kQ - 01 —l7 NAME OF PROPOSED PROJECT (If any)'\ pp TELEPHONE c ie�cQ I-ev•tla LOCATION OF PROJECT ( Major cross streets and Address, if any ) e a�Y i 4H GENERAL INFORMATION REQUIRED OWNER'S NAME TELEPHONE t4-" FVQh ` .1 e- FYQt Ch WY Ci ("a) &%%- yIti/ ADDRESS: CITY, STATE & ZIP CODE: .61 G 9� Pe ONE GENERAL PLAN EXISTING LAND USE SITE SIZE ( in Square Feet or Accts ) 0 - EXISTING STRUCTURES (in Square Feet) PROPOSED STRUCTURES (in Square Feet) 05a° 3I (Check One) �� (Check One) 0 PROPERTY IS OR PROPOSED TO BE SEWERED PROPERTY IS OR PROPOSED TO BE ON PUBLIC WATER R PROPERTY IS OR PROPOSED TO BE ON SEPTIC O PROPERTY IS OR PROPOSED TO BE ON WELL WATER APPLICATION REQUESTED '4 k 0 GENERAL PLAN AMENDMENT 0 TENTATIVE SUBDIVISION MAP 0 REZONE 0 TENTATIVE PARCEL MAP 1 USE PERMIT D 0 WAIVER OF PARCEL MAP 0 MINOR USE PERMTT Re t I of O BOUNDARY LINE MODIFICATION 0 VARIANCE 6U t t ` v DIVISION 0 MINOR VARIANCE p�ANNING 0 ADMINISTRATIVE PEAMTf 0 DEVELOPMENT AGREEMENT 0 LEGAL LOT DETERMINATION 0 CERTIFICATE OF MERGER 0 MINING AND RECLAMATION PLAN 0 OTHER PROJECT DESCRIPTION t FULL DESCRIPTION OF PROPOSED PROJECT (Attach necessary sheets. If this application is for a land division , describe the number and size of parcels.) Sec ct.'�i�e.�t.oC OWNER CERTIFICATION :•:;;: I CERTIFY THAT I AM PRESENTLY THE LEGAL OWNER OR THE AUTHORIZED AGENT OF THE OWNER OF THE ABOVE DESCRIBED PROPERTY. FURTHER, I ACKNOWLEDGE THE FILING OF THIS APPLICATION AND CERTIFY THAT ALL OF THE ABOVE INFORMATION IS TRUE AND ACCURATE. (If an agent is to be authorized, execute an affidavit of authorization and include the affidavit with this application.) DATE: /\ , at SIGNATURE: AGENT AUTHORIZATIA To Butte County, Department of Development Services; INg mg r, Se,.1 g�7-Y7-yl Print Name of Agent and Phone Number o Z.6 12e.K 47, r?aox/ Pa ro-CtI'S a c/1 ? C(& is hereby authorized to process this application for US Q_ %9e r A4 r � on my property, identified as Butte County Assessor Parcel Number APN &S5" :19 a B k S . This authorization allows representation for all applications, hearings, appeals, etc. and to sign all documents necessary for said vrocessing, but not including do r interest. Owner(s) of Record: (sign and print name) Print Name C, rKa a� l3 Signature Architect and/or Engineer: Print Name of Architect/Engineer and Phone Number Mailing Address FOR OFFICE USE. ONLY Verify: Date Received: V AP Number(s) Owners Authorization Project Description _. Taken by� " _Receipt No.�� D FEB 13 2N BUTTE COUNTY PLANNING DIVISION as rd &I D, re e t xame P 4' Fc Signature Total Amount Received: " I/ Legal Description Zoning Requirements Copies of plot plan E.H. .. LD IS"0 Plan FD Payment of the currently required Application Fee and/or Deposit (Any unused portion of a deposit) will be returned upon final action. ...Current fee for this application is $ h as of a Make check payable to "Butte County Treasurer". � 4 PARADISE EVANGELICAL FREE. CHURCH . TEACHING THE WORD OF TRUTH 2 Tim. 3:16,17 INGMAR JACOBSEN, Pastor February 6, 2001 To Whom it May Concern; Re: Paradise Evangelical Free Church Use Permit (916) 87-4241 It is our desire to enhance the over all ministry of the church by utilizing the potential of our property at this location. In the short term, we would like to improve our facilities for recreation. The area to the North of our building is impractical in its present form. It is too rough and has too much slope for a good playing area. We propose: --Leveling an area about 300 feet square. This could serve as a ball diamond, a soccer field and other athletic activities. --This would be primarily for church use. We believe an athletic program would serve our congregation well. It might on occasion be used for,Church League games. --We are not presently planning lighting nor bleachers. It would be for daytime use. only. --It would not significantly increase traffic flow. Any increase we experience would be due to normal Church growth. We do have adequate parking. --There would be little or no environmental impact as it is not in the path of any migratory. wildlife. --There are four dwellings within 300 feet if the proposed project, -and we have spoken with three of them. Two of them are very supportive of the idea, and the third showed little interest. In the Long Term we would like to build a larger sanctuary, a gymnasium, a classroom complex, offices, tennis court, and an amphitheater. Rev. Ingmar Jacobsen, Senior Pastor 5095 PENTZ ROAD • PARADISE, CALIFORNIA. 95969 WE CARE, BECAUSE HE CARES ... 0 COUNTY OF BUTT ENVIRONMENTAL INFORMATION FORM (To be Completed By Project Applicant) General Information: 1. 2. 3. 4. Date Filed ' `J- 13 - O 1 Name and address of owner, and/or developer, and/or project sponsor: Address of protect b oq4 P'eZt a. /'[a• Assessor's Parcel Number. G S �� 1 Q 0 concerning this project List and describe any other related permits and other public approvals required for this project, incl iding those required by city, regional, state and federal agencies: 5.1 Existing general plan designation: L Q R 6. Existing zoning district: A If - 7. How is land currently used? C h u rc, h cz Z3 I c S 8. Proposed use of site (Project for which this form is filed): a rA vi Project Description: S 9. Site sizer t D (Acres/Sq. Feet) 10. Off-street parking spaces: Full size: mpact: Total: 11. Plans attached Yes No _ 1E pN $10N 12. Proposed development schedule PANNING 13. Associated projects 14. Anticipated incremental or phased development `3 ph ase s Attach description of project containing the following information: 15. If residential, include the number of units, schedule of unit sizes, range of sale prices or rents, and type of household size expected. 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage o` sates area and loading facilities. �) /�. 17. If industrial, indicate type, estimated employment per shift, and loading facilities. 18. If institutional, indicate the major function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project. re(A..( Q IA i v 1 i t e S . rpt c A, : 0t Sc�c As -rt a y 3 /'f . t-f-'a(I ( 4A., S � 4 of 3e- PA44 t'm -C- C Butte County Department of Development Services 0 Planning Division 0 1 facilities, and community benefits to be derived from the project. 19. If the project involves a variance, conditional use, rezoning application, or any development permits, state this and indicate clearly wt the application is required. If permits have (readbeen iss ed, please at:ach as Exhibit t'4 �Ib ��..;� _ P ./n,AA.. +n,,,_r��. �i_ Are the following items applicable to the project or its effects? Discuss below all items checked yes (attach additional sheets as necessary). Adti(��L� to ax ro..0-ms -4- J'ii��,�:K� a—s y�s �y,�hQs�u►� ❑ Butte County Department of Development Services ❑ Planning Division ❑ 2 YES NO 20. Change in existing features of any hills, buttes, canyons or substantial alteration of ground contours. 21. Change in scenic views or vistas from existing residential areas or public lands or roads. 22. Change in pattern or character of general area of project. 23. Significant amounts of solid waste or litter. 24. Change in dust, ash, smoke, fumes or odors in vicinity. X 25. Change in bay, lake, river, stream or ground water quality or quantity, or alteration of existing drainage patterns. _ 1( 26. Substantial change in existing noise or vibration levels in the vicinity. 27. Site on filled land or on slopes of 10 percent or more. 28. Use of, or disposal of potentially hazardous materials, such as toxic substances, flammable or explosives. _ 29. Substantial change in demand for municipal services (police, fire, water, sewage, etc. including special districts). _ X 30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, etc.). 31. Relationship to a larger project or series of projects. re la � S�(tr{ fv�q I.�LIIrG Adti(��L� to ax ro..0-ms -4- J'ii��,�:K� a—s y�s �y,�hQs�u►� ❑ Butte County Department of Development Services ❑ Planning Division ❑ 2 } NIr Environmental Setting! (Attach brief description) 32. Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical, or scenic aspects. Describe any existing structures on the site and the use of the structures. Attach photo raphs of the site. Snapshots or Polaroid photos will be accepted. 1-1 is Cin oan � ce aCtb e l,aa<lad: `rhes is pres" 4L� yi a- 6h trjA b uddt-t j sat �Fh,- St+e. 33. Describe the surrounding properties, inclu5ing information on plants and animals and any cultural - historical, or scenic aspects: Indicate the type of land use (residential, commercial, etc.), intensity of land use (one -family, apartment houses, shops, department stores, etc.), and scale of development (h_eight, frontage, set -back, rear yard, etc.). Attach photographs of the vicinity. Snapshots or Polaroid photos will be accepted. G.rcq n44,tt -4 be G �e�r.ed a P aci o-vt oa A -- no ett.vr r" m am/4-4/( Certification I M P a. e t I hereby certify that the statements furnished above and in the attached exhibits present the data' and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and AAcorrect to the best of my knowledge and belief. Date Signature for d2 -13-a1 �mrs..ot'�s•e �yange(tee,( (=r.�a CI(u.rch K:\FORMS\SUBMITTAL\ENV-INFO \ C� FE 0 Butte County Department of Development Services 0 Planning Division 0 11 USE PERMI] APPLICATION PACKET This checklist is designed to assist applicants in making sure all application packet. Please include this checklist along with your su in their Applicant Planner I. A completed, signed, Uni orm ApplJ icationn7and Environmental_Information form. If the application is signed by an agent for the property owner, an agent-authori Mio`n form :Bust be submitted along with the Uniform Application. The application shall not be accepted unless signed by the owner or authorized agent. 2. 13/Payment of the currently required Application Fee and/or Deposit (Any unused portion of the deposit will be returned upon final action, if any remains.) (Planner advises applicant) 3.U Thifty-five(35) copies of plans which shall include a detailed site plan drawn to scale. All plans shall be drawn on uniform size sheets no greater than 24" x 36". The finished plans shall be folded to 8 '/2" x I V. The detailed site plan must include: a. ® Name and address of Applicant, Engineer and/or person who prepared the plan b. Q9 c. d. e. f. Pro erh' lines and lot dimensions P ,vpg/`ta�`k" Assessor Parcel Number(s) and the street address. Proposed use and/or uses of the property. C�/Proposed landscaping plan, if applicable. Dimensioned locations of existing and proposed improvements on the property (including, but not limited to, buildings, driveways, parking areas, wells, septic tanks and leach fields). g. ® Distances from anysignificant natural and constructed features of the property, sLch as streets, access roads, streams, rock outcroppings, major tree stands, storm drai.ls, bodies of water, railroads, to the property lines. IF INSUFFICIENT INFORMATION IS SUBMITTED, THE APPLICATION WILL BE DEEMED INCOMPLETE. 1 Ca/ h. V3 Location of all slope banks, ponds, creeks, buttes, sloughs, rock outcroppings, natural drainage courses, irrigation canals and existing vegetation worthy of consideration for preservation, such as oak trees. A I. —El"— Any existing faults or fractures and geologic hazards. j. El 0 // North arrow and scale'of drawing. All plans shall be drawn to an engineering scale with the preferred scale of V = 20', with a north arrow preferably oriented to the top of sheet. . k ® All plans must be clear and legible. . g 4. ® ET/One copy of 8 '/2" x I V transparency reduction of the detailed site plan. 5. —EJ__A vicinity map showing closest major cross streets, zoning and existing land use. After a meeting with a Butte Countv Planner the following checked items will be reauired to be submitted at the time of application: (optional) ¢. ❑ O (1) set of colored plans mou foam boards, WN-65F94all include anyiliu)trative site plan, ill stra ' e ilding vations, d any ne ssary cros requirement may b ived by the Planni anager. Portions size revro&wdhl. via for each shit in the ra'ved ❑ YE�❑ _VO' of t>4 d ed sit r�00 Ef"Detailed site plan including the following: O Buildin setbacks from the ultimate road ri t-of-wa front rear, sides). g 8h Y ( ) 0/ Proposed and existing on-site driveways and/or roads. Location, height, and mater.ials of walls and fences (sections may be required). gh, q ) IF INSUFFICIENT INFORMATION IS SUBMITTED, THE APPLICATION WELL BE DEEMED INCOMPLETE. 2 x a 0 All drivewa s drawn to scale on within Y> > 100 feet of the subject site. e.� El—lixisting curbs, gutters, sidewalks and existing paving widths on-site or within 100 feet of the site, on adjacent and across the street properties. f. `-0---- Typical street section(s). g. ® El/ Nearest cross streets on both sides with plus or minus distances from subject site. h. Approximate location of all buildings within 100 feet, on ad�acent properties. I. f —0i Pro osed method of sewer and water connection or alternative method of e sewa P g disposal and potable water supply. j. Existing and nearest fire hydrants. k. ® Access, bothP edestrian and vehicular, showing service areas and points of ingress and egress. 1. Unternalcirculation pattern. M. W Elevation contours, at a minimum per USGS maps.. The plan should include a graphic scale and north arrow, all proposed and existing improvements, landscape concepts such as earth mounding and meandering walkways, walls, ground cover, trees, shrubs, shadows, pw/ing and other elements as may be necessary to illustrate the site,plan. (Dimensions may be excluded from this pltn.) 11. LI —El'Conceptual Grading Plan Items to be shown include: a. M - /Natural areas to beP reserved. IF INSUFFICIENT INFORMATION IS SUBMITTED, THE APPLICATION- WILL BE DEEMED INCOMPLETE.. 3 • • C. ® Existing and proposed contours within 100 feet of project boundaries. d. Proposed drainage and flood control facilities. e. ® Erosion control measures (e.g. - slope landscaping). f. LTJ Natural drainage. g. U —E3—Elevations and finished contours. h. Location of retaining walls, drainage channels and existing structures. I. Location, elevation and size of proposed building pads. 12. ustrative Building Elevations Illustrative building elevations showing all sides of existing and proposed buildings and structures. Illustrative building elevations means architectural elevations showing typical materials to be used, trees, landscaping and shadows to give the elevations graphic dimension. Additional information may be required in order to clarify, amplify, correct or otherwise supplement the above submittal information or to complete any required environmental review documents, as deemed necessary by the Department of Development Services, Public Works, Environmental Health Division, Butte County Fire Department, or Agriculture Commissioner. Signature: Date 6 I Applicant/Re resentativ Signature:Date: _ e n lication E _-- --ll D C� �'8 � KAP ORMS\SUBIXTALTHECKLIS\U E .FRM F E 3 FEB 1 S W c�i TTF cvo;,.IT. BUTTE COUNTY PLANNING DIVISION P/ IF INSUFFICIENT INFORMATION IS SUBMITTED, THE APPLICATION WILL BE DEEMED INCOMPLETE. 4 I + 1' �..Q r WN I y et 4o a 33 ao FEB 1 3 2001 BUTTE COUNN _ PLANNING DIVISION I o s. aP� 4A � J I 00 v .Y p rtV* Ct1�\f ci GI 4L S ��YS pT,P Yj Sho dl �,soY s4ao�ti"" qq Polio d &V , it 9 r► ( 0. r V Q C o S s yt 1 Q ESTI - Y1.Y( p 16 SAFARI SAFARI LAM =I 2. M m c w LAM L)Y y c' -aa k :-,t,�. �?�;� t:.�v,•^°d's:a ��3�".!tj; ri +f tir�ia.=-`��`.wer 3'.-.I."•r£3.,'p;,�.' 2 . e .. INGMAR JACOBSEN CDL N0564118 SZOO i 497,9 MALIBU DR 872-4806 RADISE,CA 95969 Date/� ! I135n210 — o_..._,_......._ ^^IIS Pa It he Jot Order of,. F•:^i Ell Tr 6 Dollars 8 ,.. 1 �Bankof`AnlertCl C'ustomersinte ?_yQro Clam Brench #[ 189 r�k.7-3 j*1820 Oro Dem Boulevard g t n 7�fOroviIIa CAj96888 ,p (530)5394950St ;•f i ati w' "' dna L 'Kt aub�'i" E r f `_ -- .L 2 111• t 111 L000 3 58 .5;200 L L69•L 0'L4 �.59u , -'r,.-pax-l•� OFFICIAL RECEIPT COUNTY OF BUTTE STATE OF CALIFORNIA OFFICE OF PLANNING RECEIPT 19203 ISSUED B C-1 1 DATE RECEIPT TOTAL NO. RECEIVED PUBLIC WORKS LAFCO PLANNING PUBLIC SALES ENV. HEALTH FIRE NOEMOD F/G FEE OTHER APPLICANT RECEIVED FROM OFFICIAL RECEIPT COUNTY OF BUTTE STATE OF CALIFORNIA OFFICE OF PLANNING RECEIPT 19203 ISSUED B C-1 1 055290083000 PARADISE EVANGELICAL FREE CHURCH 5095 PENTZ RD PARADISE CA 95969 055240013000 FALLON MARK & CATHERINE 5050 EDGEWOOD LN PARADISE CA 95969 055290075000 DODGE RANDALL P & PAULA S P0BOX 281 PARADISE CA 95967 i 055240011000 SCOTT JOHN ROBERT & LORI LOU 5020 EDGEWOOD LANE PARADISE CA 95%9 055290039000 GUARDINO GARY M TRUSTEE 5084 PENTZ RD PARADISE CA 95969 055290076000 DUNN TERRY 5150 PENTZ RD PARADISE CA 95969 055240012000 PARKER JONATHAN EDWARD 5036 S EDGEWOOD DR PARADISE CA -95969 055290059000 LILLARD JOSEPH E & KATHARINE V 4824 SALMON DR PARADISE CA 95969 055290077000 VEGA JUDITH M 5005 ARDEN WAY PARADISE CA 95969 055290078000 055290084000. 055290088000 -GEORGE CLERMON H & BETTY J JT DUNKEL RICHARD WM A & SHIRLEY ASE BARNETT FLORIENE S 5019 ARDEN WAY 5157 PENTZ RD 5037 PENTZ RD PARADISE CA 95969 PARADISE CA 95969 PARADISE CA 95969-6628 055290089000 055440120000 055530001000 LUTTENBACHER RALPH & NANCY TURNER AUSTIN WAYNE & ALYCE KASZA ELIZABETH 4955 SAFARI LN TERESE 5011 CLUB DR PARADISE CA 95969 4980 MALIBU DR _COUNTRY PARADISE CA 95969 PARADISE CA 95969 055530002000 KNAPPENBERGER ALBERT JR & JO ANN P O BOX 1975 PARADISE CA 95967 055530008000 MOORES ROBERT D & IRIS M 4918 MALIBU DR PARADISE CA 95969 055530004000 COOLIDGE KEITH KIMBALL 4948 MALIBU DR PARADISE CA -95%9 055530009000 LANG GREGORY S & MARCIA R 1954 DEAN ROAD PARADISE CA 95969 055530040000 SCOTT KENNETH J & MARIANNE T J:\projects\Larrys\Euhibits\UP0115.doc 4965 MALIBU DR PARADISE CA 95969 055530005000 SIMPSON DALE L & JUDY 4940 MALIBU DR PARADISE CA -95969-7100 055530020000 UREN DAVID & JEAN 5084 PENTZ RD #11 PARADISE CA 95969 O USE PERMIT BUTTE COUNTY BOARD OF SUPERVISORS AUG 27 W DATE: (Certified Mail Rec.) UP 01-15 PERMIT NO. 055-290-083 ASSESSOR'S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the'Cou6ty of Butte and the special conditions set forth below, the Paradise Evangelical Free Church is hereby granted a Use Permit in accordance with the application filed for an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square`foot.gymnasium with, restroom,and'shower facilities. The gymnasium will also serve as Sunday school rooms. The project will involve the grading of approximately 2.2 acres of land. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit, constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65. 2. Unless otherwise provided for in a special condition to this use permit, all conditions must be completed prior to or concurrently with the establishment of the granted use. The use granted by this permit must be established within 24 months of the delivery of the countersigned permit to the Permittee. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works, or their respective designee, upon receipt of a substantiated written request by the applicant. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination, as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If any use for which a use permit has been granted is not established within two years of the date of receipt of the countersigned permit by the Permittee, the permit shall become null and void and reapplication and a new permit shall be required to establish the use. 5. The terms and conditions of this permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. Conditions of Approval: Planning Division Measures shall be taken to control fugitive dust emissions from all civil construction associated with development of the site. Standard Mitigation Measures to prevent or reduce fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, -Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. 5. Use of the athletic field and the gymnasium shall be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. No activity shall be allowed after dark and no public address systems shall be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on. file in the Planning Division, is date- stamped February 13, 2001; and is incorporated herein by this reference. Public Works Department 8. Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S- 18 road approaches and construct them to County standards, as specified in County Improvement Standards. 9. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct left turn pockets on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works Department for review and comment. Any road improvements identified in the analysis as being required shall be installed by the applicant prior to issuance of the Use Permit. (Note: This condition to be deleted if the Board of Supervisors upholds the appeal by the project applicant) S 10. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) Fire Department 11. Prior to the issuance of a building permit for the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire hydrant. Building Division 12. Building permits required. Prepare four (4) sets of construction plans and make an application for permit. Construction shall comply with federal, state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. 13. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 14. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. 15. Proposed improvements shall comply with Use Permit conditions applicable to construction. 16. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 17. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and• shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. Environmental Health Division 18. Under County permit, upgrade the existing septic systems to accommodate increased development. 19. Prior to issuance of the Use Permit, obtain approval from the Del Oro Water Company that they are able and willing to provide the necessary flows to service the entire project. Other Conditions . 20. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. I hereby declare under penalty of perjury that I have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. Dated: NOTE: Issuance of this Use Permit does not waive requirement of obtaining Building and Health Division permits before starting construction,_pSx_does it waive any other requirements. Board of Supervisors CC: Land Development Division Building Division Environmental Health Department Butte County Fire Department/CDF Assessor's Office MAY 2.2 2009 • USE PERMIT BUTTE COUNTY BOARD OF SUPERVISORS AUG 2 7 p DATE:'. (Certified Mail Rec.) {..tis : L'�... r K� yr � . :.C', *UP 01-15 } PERMIT NO. 055-290-083 ASSESSOR'S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the County of Butte and the special conditions set forth below, the Paradise Evangelical Free Church is hereby granted a Use Permit in accordance with the application filed for an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project will involve the grading of approximately 2.2 acres of land. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit, constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65. 2. Unless otherwise provided for in a special condition to this use permit, all conditions must be completed prior to or concurrently with the establishment of the granted use. The use granted by this permit must be established within 24 months of the delivery of the countersigned permit to the Permittee. 3. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works, or their respective designee, upon receipt of a substantiated written request by the applicant. Prior to such approval, verification shall be made by each Department or. Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If any use for which a use permit has been granted is not established within two years of the date of receipt of the countersigned permit by the Permittee, the permit shall become null and void and reapplication and a new permit shall be required to establish the use. 5. The terms and conditions of this permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. Conditions of Approval: Planning Division 1. Measures shall be taken to control fugitive dust emissions from all civil construction associated with development of the site. Standard Mitigation Measures to prevent or reduce 0 9 fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The. erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Planta the Planning Division and the Building Division. No clearing or land disturbance shall take.place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. 5. Use of the athletic field and the gymnasium shall be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. No activity shall be allowed after dark and no public address systems shall be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is date- stamped February 13, 2001, and is incorporated herein by this reference.. Public Works Department Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S- 18 road approaches and construct them to County standards, as specified in County Improvement Standards. 9. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct left turn pockets on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works Department for review and comment. Any road improvements identified in the analysis as being required shall be installed by the applicant prior to issuance of the Use Permit. (Note: This condition to be deleted if the Board of Supervisors upholds the appeal by the project applicant) 10. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) Fire Department 11. Prior to the issuance of a building permit for the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire hydrant. Building? Division 12. Building permits required. Prepare four (4) sets of construction plans and make an application for permit. Construction shall comply with federal, state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. 13. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 14. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. 15. Proposed improvements shall comply with Use Permit conditions applicable to construction. 16. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 17. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. Environmental Health Division 18. Under County permit, upgrade the existing septic systems to accommodate increased development. 19. Prior to issuance of the Use Permit, obtain approval from the Del Oro Water Company that they are able and willing to provide the necessary flows to service the entire project. Other Conditions • 20. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. I hereby declare under penalty of perjury that I have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. NOTE: Issuance of this Use Permit does not waive requirement of obtaining Building and Health Division permits before starting constructiop,-aor does it waive any other requirements. Board of Supervisors CC: Land Development Division Building Division Environmental Health Department Butte County Fire Department/CDF Assessor's Office - MAY 22 2 2001 RAA N z o ON O Z o M O n n n U W z m W ~ Z m � LL- d nnnnnn l.J n 3 oao'y ZIiV:�,y -A t•. \ + e f � .� E e r = •2 N _ �L r } n 4- C��16 ( . `'O w N } lJ q LAR 0 �O r� Dry Cy-QQ )1 V C. TO: FROM: x NOTICE OF DETERMINATI Office of Plan.& Research Dept. 1400 Tenth Street Sacramento, CA 95814 X Butte County Clerk SUBJECT: Butte County Planning 7 County Center Dr., Oroville 95965 Filing of Notice of Determination.in compliance with Section 21108 or 21152 of the Public Resources Code. Project Title: UP 01-15, Use Permit AP Number: 055-290-083 Applicant: Paradise Evangelical Free Church, 5095 Pentz Road, Paradise, CA 95969 State Clearinghouse Number (If submitted to clearinghouse): Contact Person: Stephen Betts Telephone Number: 538-7601 Project Location: On the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. Project Description: Use Permit to allow an athletic field (baseball, soccer, etc:) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. This is to advise that the Butte County Board of Supervisors has approved the above-described project on May 22, 2001, and has made the following determinations regarding the above-described project. 1. The project will, X will not, have a significant effect on the environment. 2. An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA. A Negative Declaration was prepared for this project pursuant to the provisions of CEQA. 3.t Mitigation measures X were, were not, made a condition of the approval of the project. 4. A statement of overriding considerations was, X was not, adopted for this project. This is to certify that the final EIR with comments and responses and record of project approval is available to the general public at: Date. received for filing and posting at OPR Butte County Department of Development Services 7 County C#ter Drive Or9yille, 95965 M. A. Mel-',- Principal anner Mitigation Measures: Measures shall be taken to control fugitive dust emissions from all civil construction associated with development of the site. Standard Mitigation Measures to prevent or reduce fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a:m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. (Mitigation Measure) 10. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) DECLARATION OF FEES Do (California Fish and Game Code Section 711.4) NAME AND ADDRESS OF APPLICANT Paradise Evangelical Free Church 5095 Pentz Road Paradise, CA 95969 FILING NO. Project Title/file number: CLASSIFICATION OF ENVIRONMENTAL DOCUMENT: 1. NOTICE OF EXEMPTION/STATEMENT OF EXEMPTION O A. Statutorily or Categorically Exempt $25.00 Clerk's Documentary Handling Fee (X) B. De Minimus Impact - Certificate of Fee Exemption $25.00 Clerk's Documentary Handling Fee 2. NOTICE OF DETERMINATION - FEE REQUIRED () A. Negative Declaration $1,250 State Filing Fee $25.00 Clerk's Documentary Handling Fee () B. Environmental Impact Report $850 State Filing Fee - $25.00 Clerk's Documentary Handling Fee 3. () OTHER (Specify) $25.00 Clerk's Documentary Handling Fee PAYMENT / NON-PAYMENT OF FEES: 1. (X) PAYMENT: The above fees have been paid. See attached receipt(s). 19744 2. () NON-PAYMENT: The above fees are required. Not paid. Chief Planning Official By: M. A. Meleka Title: Principal Planner Lead Agency: Butte County Department of Development Services Date: August 7. 2001 TWO COPIES OF THIS FORM MUST BE COMPLETED AND SUBMITTED WITH ALL ENVIRONMENTAL DOCUMENTS FILED WITH THE BUTTE COUNTY CLERK'S OFFICE. THREE COPIES OF ALL NECESSARY DOCUMENTATION ARE REQUIRED FOR FILING. ALL APPLICABLE FEES ARE DUE AND PAYABLE PRIOR TO THE FILING OF ANY ENVIRONMENTAL DOCUMENT WITH THE BUTTE COUNTY CLERK'S OFFICE. MAKE CHECKS PAYABLE TO THE COUNTY OF BUTTE. CALIFORNIA DEPARTMENT OF FISH AND GAME CERTIFICATE OF FILING FEE EXEMPTION De Minimis Impact Finding (Fish and Game Code Sec. 711.4; Section 753.5c, Title 14, California Code of Regulations) Project Title / Butte County Location: UP 01-15, on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. Project Description: Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms Findings of Exemption (attach as necessary): 1. The County of Butte has conducted an initial study and prepared a Negative Declaration so as to evaluate the potential of this project for adverse environmental impact: 2. When considering the record as a whole, there is no evidence before the County that the project will have potential for an adverse impact on wildlife resources or the habitat upon which the wildlife depends. 3. The County of Butte has, on the basis of substantial evidence, rebutted the presumption of adverse effect contained in Section 753.5 (d), of Title 14, California Code of Regulations, if applicable. 4. The project is hereby found to be de minimis in its effect on wildlife and exempt from the State Fish and Game filing fees required by Section 711.4 of the Fish and Game Code. Certification: I hereby certify that the County of Butte has made the above findings of fact and that based upon the initial study and hearing record the project will not individually or cumulatively have an adverse effect on wildlife resources, as defined in Section 711.2 of the Fish and Game Code. By: M. A. Meleka Principal Planner Lead Agency: County of Butte Date: August 7. 2001 July 17, 2001 Richard Hamilton 6146 Coral Avenue Paradise, CA 95969 Re: Use Permit, AP 055-290-083 Dear Mr. Hamilton: a -� . tte Count LAND OF NATURAL WEALTH AND EEAUTY PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 FAX: (530) 538-7785 At the regular meeting of the Butte County Board of Supervisors held May 22, 2001 the appeal of the Planning Commission's approval of a Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom -and shower -facilities. The gymnasium will also serve as Sunday school rooms was denied and the' -Use Permit approved. A Notice of Determination (NOD) should be filed for purpose of completing the California environmental quality Act requirements. The fee for filing the NOD is a $25.00 document handling fee. A check made payable to the Butte County Treasurer in the amount of $25.00 should be submitted to the Planning Division in order to complete the process. Enclosed are two copies of your Use Permit. Please sign both copies of the Use Permit and return them to this Division. You must sign the Use Permit within thirty (30) days of the expiration of the appeal period. Both signed copies must be received, by this Division, within forty (40) days from the date of this letter. The Use Permit is deemed granted when the enclosures have been signed by the applicant, with the counter signature of the Chairman of the Board of Supervisors, and said permit is received by the applicant by certified mail. Pursuant to Section 66020 (d) (2) of the Government Code you are hereby notified that you have 90 days to register a protest challenging any fees, dedications, reservations, or exactions imposed as conditions of approval for this project. Should you have any question's regarding this matter, please contact Stephen Betts at this office between 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely, Z W4;0_cr--- ) Lynn Richardson Administrative Support Service Assistant /lr BUTTE COUNTY _ CLERK OF THE BOARD USE ONLY BOARD OF SUPERVISORS MEETING DATE: AGENDA TRANSMITTAL - - �-ENDA "Ad � . ,x :� ITEM` AGENDATITLE: Applicant/Appellant %' Paradise Evangelical" Free' 'ChuicWw"also*•= •; 14 DEPARTMENT: pps Plannin DATE: 5/3/01 MEETING DATE REQUESTED: 54/22 % O1 . Ste hen Betts' CONTACT: P PHONE: 7601 . REGULAR ,CONSENT DEPARTMENT SUMMARY AND REQUESTED BOARD ACTION .3;• Appellant Beth and Jo Anii Rriappenberger= See attached for summary and -action. - AGENDA ITEM SUBMITTAL REQUIRES THE ORIGINAL AND NINE (9) COPIES ATTACH EXPLANATORY MEMORANDUM AND OTHER BACKGROUND INFORMATION AS NECESSARY Budgetary Impact: Yes No X CAO OFFICE USE ONLY If yes, complete Budgetary Impact Worksheet on back Budget Transfer Requested: Yes Nom Administrative Office Review If yes, complete Budget Transfer Request Worksheet on back. Administrative Office Staff Contact (Deadline is one business day prior to normal agenda deadline) Will Proposal Require an Agreement: Yes No X 4/5's Vote Required: Yes: No: Auditor -Controller's Number (if required): County Counsel's Approval: Yes No X Date Received by Clerk of Board: Will Proposal Require Additional Personnel: Yes No X Number of Permanent: Temp Extra Help Previous Sorg t( igr&te: Additional Information Attached: Yes X No Describe: Rev. 1198 SPECOL INSTRUCTIONS TO CLERO Number of originals required to be returned to Department: "Please Note" Department is responsible for returning contract to contractor. Clerk of the Board returns completed Auditor's copy ONLY. Requested Board Action: Ordinance Required Resolution Required Minute Order Requlied'-'``•• For Information Onty` ' ' • • �� BUDGETARY IMPACT. WORKSHEET Current Year Estimated CostfFunding Source Estimated Cost $ Amount Budgeted $ (Budget Unit Number: ) (Fund Name: ) (Fund Number: ) Additional Requested $ Source of Additional Funds Requested Contingencies $ (Fund Name: ) (Fund, Number: ) Unanticipated Revenue $ (Source: ) (Rev. Code: ) Other Transfer(s) $ 1. Complete worksheet below 2. Deadline is one business day prior to normal agenda deadline Total Source of Funds $ Annualized cost $ if also planned for next year. Budget Transfer Authorized By Administrative Office Authorized Signature Transfer Request: Board Action Required for B -Transfer? Yes No Date BUDGET TRANSFER REQUEST WORKSHEET AMOUNT LINE ITEM' LINE ITEM Transfer S (No Cents) From To Transfer = (No Cents) From To Transfer S (No Cents) From To Transfer S (No Cents) From To SUMMARY: Appellant # 1 - Beth and Jo Ann Knappenberger; Appellant # 2 - Paradise Evangelical Free Church (Pastor Igmar Jacobsen), appeal of a Planning Commission decision to approve a Use Permit for the Paradise Evangelical Free Church to allow an athletic field (baseball, soccer, etc.), restrooms, and a 6,000 square foot gymnasium with restroom and shower facilities. The athletic field will be used for games held by members of the church and for church league games. The property is zoned AR -1 (Agricultural Residential - 1 acre minimum parcel size). The property is located on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. APN 055-290-083 (SB) (UP 01-15) ACTION FOR CONSIDERATION - Staff recommends that the Board of Supervisors deny the appeal sought by both appellants, and approve the project, based upon the findings and conditions as approved by the Planning Commission. Staff has also prepared findings for upholding the appeal by the project applicant and approving the project without the requirement to install left turn pockets on Pentz Road. I. Deny the appeal by the nearby landowner based upon the following finding: a. Conditions of project approval will ensure that the project does not create any significant impacts to the neighborhood. II. Deny the appeal by the project applicant based upon the following finding: a. A condition of project approval requires the applicant to submit to the Public Works Department an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that the project will create significant impacts to the. intersection of Pentz Road and Safari Lane, left turn pockets or' other road improvements as determined by the analysis are required to be constructed by the applicant. This condition will ensure that any significant impacts to the intersection of Pentz Road and Safari Lane caused by the project are mitigated. III. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act, that said study identified potential significant environmental effects and includes mitigation measures that would mitigate such effects below significant levels, and that a Mitigated Negative Declaration is proposed.. B. Find that the Board of Supervisors has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process. C. Find, on the basis of the whole record before the Board of Supervisors,'including the Initial Study and any. comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will. have a significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the County, which is the lead agency. IV. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain any significant amounts of wildlife habitat. The undeveloped area on the project site that contains extensive wildlife habitat will not be disturbed by the project. Therefore, a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made. The collection of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. V. Approve Use Permit 01-15 for the Paradise Evangelical Free Church, subject to .the conditions found in Exhibit A, with the following findings: A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: 1. The athletic field will not be lighted and public address systems will not be allowed. 2. Measures are required to be taken during construction activities to prevent fugitive dust emissions. 3. The times of construction activities are limited to prevent significant noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. 7. The applicant is required to submit to the Public Works Department an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that left turn pockets or other road, improvements are needed, the applicant is required to construct the ; improvements prior to issuance of the Use Permit. B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Plan land use designation allows quasi -public uses as Secondary Uses. or I. Uphold the appeal by the project applicant based upon the following finding: a. Left turn pockets on Pentz Road at Safari Lane are not necessary because most traffic generated by the project will come from the north of the site and make a right turn onto Safari Lane. Vehicles exiting the site will do so north of the intersection of Pentz Road and Safari Lane, turning left onto Pentz Road. II. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act, that said study identified potential significant environmental effects and includes mitigation measures that would mitigate such effects below significant levels, and that a Mitigated Negative Declaration is proposed. B. Find that the Board of Supervisors has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process. C. Find, on the basis of the whole record before the Board of Supervisors, including the Initial Study and any comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will have a significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the County, which is the lead agency. III. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain V any significant amounts of wildlife habitat. The undeveloped area on the project site that " contains extensive wildlife habitat will not be disturbed by the project. Therefore, .a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made: The collection. of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. ` IV. Approve Use Permit 01-15 for the Paradise Evangelical Free Church, subject to the conditions found in Exhibit A, with the exception of Condition # 9, which is deleted, with the following findings: A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and thatthe use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: 1. The athletic field will not be lighted and public address systems will not be allowed. 2. Measures are required to be taken during construction` activities to prevent fugitive dust emissions. 3. The times of construction activities are limited to prevent significant noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Plan land use designation allows quasi -public uses as Secondary Uses. 0 Conditions of Approval Measures shall be taken to control fugitive dust emissions from all civil construction associated with development of the site. Standard Mitigation Measures to prevent or reduce -_ fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management. Plan to address erosion control during site . preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a.m. to 6:00 p.m., Monday through Friday, and 10 a.m. to 6 p.m., Saturday, Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. 5. Use of the athletic field and the gymnasium shall be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. No activity shall be allowed after dark and no public address systems shall be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is date- stamped February 13, 2001, and is incorporated herein by this reference. 8. Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S- 18 road approaches and construct them to County standards, as specified in County Improvement Standards. 9. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct left turn pockets on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works. Department for review and comment. Any road improvements identified in the analysis as being required shall be installed by the applicant prior to issuance of the Use Permit. (Note: This condition to be deleted if the Board of Supervisors upholds the: appeal by. the project applicant) 10. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution _ for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed _ to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) Fire Department 11. Prior to the issuance of a building permit for the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire hydrant. 12. Building permits required. Prepare four (4) sets of construction plans and make an application for permit. Construction shall comply with federal, state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. 13. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 14. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. 15. Proposed improvements shall comply with Use Permit conditions applicable to construction. 16. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 17. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. Environmental Health Division 18. Under Countyy permit, upgrade the existing septic systems to accommodate'. increased. development. 19. Prior to issuance of the Use Permit, obtain approval from the Del Oro Water Company that they are able and willing to provide the necessary flows to service the entire project. Other Conditions 20. Applicant must also comply with, all other applicable State and local statutes, ordinances and regulations. BUTTE COUNTY BOARD OF SUPERVISORS AGENDA REPORT - MAY 229 2001 Appellants: 1. Beth and Jo Ann of Pentz Road and Safari Knappenberger Lane,' at 5095 Pentz Road.- 2. oad;2. Paradise Evangelical Paradise. Free Church (Pastor Igmar Jacobsen) Parcel Size: 19 acres Applicant: Paradise Evangelical Free Church File #: APL 01-09 (UP 01-15) Request: Appeal of a Planning Commission decision . to approve a Use Permit to allow an athletic field (baseball, soccer, etc.), restrooms, and a 6,000 square foot gymnasium with restroom and shower facilities. G.P.: Low Density Residential Zoning: AR -1 (Agricultural - Residential, 1 -acre minimum parcel size) and H -C (Highway Commercial) APN: 055-290-083' Location: On the north side of Safari Lane, on the northwest corner STAFF COMMENT Zone Date: AR -1: April 4, 1998 H -C: February 23, 1,982 Supervisorial District: 4 Project . Planner: Stephen Betts Senior Planner Attachments: A. Zoning/General Plan Map B. Letter of Appeal, dated April 26, 2001, from Beth and Jo Ann Knappenberger and Letter of Appeal, dated April 30, 2001, from Pastor Igmar Jacobsen C. April 26, 2001, Planning Commission Agenda Report and Minutes D. Correspondence E. Public Works Department Memorandum, dated May 8, 2001 F. Initial Study G. Site Plan These appeals are made pursuant to Butte County Code Section 24-45.30 and is a "de novo" hearing. The Board of Supervisors may consider all applications, papers, maps, exhibits, and staff recommendations presented to the Planning Commission in reaching its decision. Ar Butte County Department of Development Services ArAgenda Report a Page 1 Ar 0- i PROJECT DESCRIPTION The project being appealed is a Use Permit to allow an athletic field (baseball, soccer, etc.), a 500.' square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The athletic field will be used for games held by the church congregation and for church league games. The applicant does not propose to allow non -church leagues (i.e., Paradise Recreation District) or the general public to use the athletic field or gymnasium. The applicant anticipates that_ the field will be used for organized games three to four times per week by the church congregation and three to four church league games per year. No lighting of the athletic field is proposed, nor is the sale of food or beverages. Approximately 2.2 acres of the site will be graded to create level areas for the athletic field, restrooms, and gymnasium. The church was constructed in 1986, after a Use Permit was obtained for that use. The final map for the Unique Acres Subdivision, which is located adjacent to and north of the project site, was recorded in 1993. PLANNING COMMISSION ACTION On April 26, 2001, the Planning Commission held a public hearing on the Use Permit for the Paradise Evangelical Free Church. Testimony was received from several landowners in the area in opposition to the project. The primary concerns of the people in opposition to the project were that the proposed athletic field and gymnasium uses would create. more noise, additional vehicle traffic, invite criminal activity, cause baseballs to land in the adjacent properties, and interfere with wildlife movements. In response, several members of the church spoke, stating that the impacts caused by the proposed athletic field and gymnasium uses would be minimal to adjacent residents. After closing the project to public comment, the Commission discussed the project in detail. The Planning Commission took into consideration the concerns of the people opposing the project during their discussion of the project, but concluded that the project will not result in significant impacts to the neighborhood. The Commission voted 5-0 to approve the project. Modifications were made to Condition # 6 to prohibit activity after dark on the athletic field and to prohibit the use of public address systems. The agenda report and the draft minutes for the April 26, 2001, Planning Commission meeting are attached for background information. REASON FOR APPEALS Two appeals have been submitted with regards to this project. Each appeal is addressed separately below. The first appeal is by the owners and residents of a nearby parcel, who state that they have many oppositions/concerns regarding the conditions of approval. This appellant submitted documents at the Planning Commission meeting that listed the reasons for opposing the project. The submitted ArButte County Department of Development Services aAgenda Report ArPage 2 s material is found in Attachment D of this report. In response to the main concerns of this appellant and the other landowners in the area, the. following is offered: Construction noise, especially grading equipment, will create noise during site development activities that has the potential to cause an impact to nearby residents. A condition of the project limits development activity from 7:00 a.m. to 6:00 p.m., Monday through Friday, and 10:00 a.m. to 6:00 p.m., Saturday, Sunday, and holidays. This is.a standard noise condition and is frequently used for projects in residential areas. Participants of the games being played on the athletic field, along with spectators, will generate noise in the form of yelling and cheering. This noise may be heard by the residents to the north of the site. The site plan shows that the baseball diamond is configured to place the infield and the spectators approximately 300 feet from the adjacent residential parcels. Due to the low number of times that the playing field will be utilized noise generated by the players or spectators is not expected to create a significant impact. According to the applicant, approximately three to four games will be played by church members on the athletic field each week. Three to four church league games may be played over the course of a year. The athletic field will never be used when the church is meeting. The project will result in a minor increase in vehicle traffic on Pentz Road, but this is not expected to be significant due to the low number of games that will be played. The Public Works Department requests that left turn pockets be installed on Pentz Road at Safari Lane by the applicant. The Public Works condition allows for the applicant to retain an engineer to analyze the project and determine if left turn pockets are required. The applicant would not be required to install the left turn pockets if the analysis determines that they are not needed. The project will not create any impacts to the roads in the adjacent Unique Acres Subdivision. There is adequate parking on the site to handle the parking for vehicles coming to the proposed athletic field and gymnasium, so no off-site parking will occur. •� �• • :•• •� ,�• • ••• ,•• i- CROP - Concerns were raised about night lighting of the athletic field, noise from public address systems, and sales of food and beverages. Conditions of the project prohibit the use of night time lighting of the athletic field and the. use of public address systems. Food and beverage sales were not requested by the applicant as a part of the project and would not be allowed under the terms of the Use Permit. i Butte County Department of Development Services aAgenda Report rPage 3 jr 4. Use of the Athletic Field and Gymnasium by the General Public Concern was raised that the church would rent the athletic field for soccer games. A condition of the project specifically prohibits the use of the proposed facilities by the general public, which includes any public recreation district or public or private recreation league. •T8u- Several nearby landowners objected to the project because they believed, that the people using the proposed athletic field and gymnasium would cause an increase in crime in the neighborhood. The owner of the adjacent bait and tackle store stated that he could lose his beer and alcohol license due to the presence of numerous children in the area. He also stated that the children will go to his store and create problems, and that drug use would increase in the area. While more people will come to the site due to the project, most if not all of them will be associated either with the Paradise Evangelical Free Church or other churches in the Paradise area. Most of the games will be played by children, but under the supervision of adults. The extensive brush location along the north property line will prevent or discourage people from trespassing on the adjacent residential parcels. Most of the area where the athletic field is proposed to be located was cleared many years ago and currently consists of native and non-native grasses, scattered wild flowers, numerous manzanita shrubs one to two feet tall, and small buckbrush shrubs. Several pine trees may have to be removed for the athletic field and the gymnasium. Approximately 14 acres of the 19 -acre project site consists of oaks, pines, and extensive brush, including manzanita, buckbrush, and poison oak. This 14 -acre area, which is to the west of the existing church and descends into Dry Creek Canyon, may contain large wildlife populations. Additionally, there is a 15 to 20 -foot wide heavily vegetated strip along the north and northeast property lines that could be -habitat for some wildlife species, although at low population levels due to the adjacent residential uses. The vegetated strip along the north property line is a condition of the Unique Acres Subdivision Map. The proposed athletic field and gymnasium will not encroach into the 14 -acre natural area or the vegetated strip. The project site is located within a deer herd area, and the project area has been designated by the California Department of Fish and Game as a Designated Development Zone (DDZ). Parcels within a DDZ are allowed to develop as allowed by the zoning of the parcel and to the density as allowed by the zoning. Resident deer are located in the area and may frequent the site. The project is not expected to have a significant impact to any animal species, including deer, because other than a few pine trees, no significant vegetation will be removed. The grass that will be planted on the athletic field may even attract deer to the site, thus increasing the deer usage of the site. AFButte County Department of Development Services mAgenda Report sPage 4 s 7. Baseballs Falling on Adjacent Parcels The orientation of the baseball field leads to the potential for a baseball to land on a parcel in the adjacent Unique Acres Subdivision. Reconfiguring the baseball field in the opposite direction, so that baseballs will be hit to the south, will limit baseballs from going into the adjacent parcels but will result in the infield and the spectators being close to the property line. Due to the long distance from home base to the property line, which is approximately 310 feet, very few baseballs are expected to fall on the adjacent parcels. Second Anneal The second appeal of the project was by the project applicant, who objects to the Public Work's Condition # 9 requiring the applicant to either install left turn pockets on Pentz Road at Safari Lane, or provide an estimate and analysis, prepared by a registered engineer; of traffic generation and turning movements for vehicle traffic generated by the project. If the analysis showed that the project would not cause an impact to vehicle circulation, installation of the left turn pockets would not be required. Conversely, if the analysis showed that left turn pockets were necessary, the applicant would be required to construct them. The project applicant states in his appeal letter that the Public Works Department had not done any analysis of the impact that the project would have on traffic flow and that they have not submitted any data to show that the left turn pockets are necessary. According to the applicant, 99% of the traffic generated by people using the proposed facilities will come from the north of the site and make a right turn onto Safari Lane. The left turn pockets would not be necessary because vehicle traffic generated by the project would not use them. Due to the appeal, the Public Works Department re -reviewed Condition # 9 and determined that the condition provides the greatest flexibility for the church to either install the left turn pockets or provide an Engineer's report and install the necessary facilities. The Public Works Department noted that because the details of the traffic patterns in the area have not been throughly investigated, the only other alternative they would recommend would be a focused Environmental Impact Report that addresses traffic impacts. A copy of the Public Works memorandum. can be found in Attachment E of this agenda report. ACTIONS FOR CONSIDERATION Staff recommends that the Board of Supervisors deny the appeal sought by both appellants, and approve the project, based upon the findings and conditions as approved by the Planning Commission. Staff has also prepared findings for upholding the appeal by the project applicant and approving the project without the requirement to install left turn pockets on Pentz Road. I. Deny the appeal by the nearby landowner based upon the following finding:. a. Conditions of project approval will ensure that the project does not create any significant impacts to the neighborhood. Ar Butte County Department of Development Services mAgenda Report dr Page 5 dr H. Deny the appeal by the project applicant based upon the following finding: a. A condition of project approval requires the applicant to submit to the Public Works. Department an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that the project will create significant impacts to the intersection of Pentz Road and Safari Lane, left turn pockets or other road improvements'as determined by the analysis are required to be constructed by the applicant. This condition will ensure that any significant impacts to the intersection of Pentz Road and Safari Lane caused by the project are mitigated. III. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act,- that said study identified potential significant environmental effects and includes mitigation measures that would mitigate such effects below significant levels, and that 'a Mitigated Negative Declaration is proposed. B. Find that the Board of Supervisors has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process.- C. rocess: C. Find, on the basis of the whole record before the Board of Supervisors, including the Initial Study and any comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will havea significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the, County; which is the lead agency. IV. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain any significant amounts of wildlife habitat. The undeveloped area on the project site that contains extensive wildlife habitat will not be disturbed by the project. Therefore, a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made. The collection of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. Ar Butte County Department of Development Services sAgenda Report Ar Page 6 Ar V. Approve Use Permit .01-15 for the Paradise Evangelical Free Church, subject to the conditions found in Exhibit A, with the following findings: A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible . with, or injurious to, surrounding property, or detrimental to the'health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: 1. The athletic field will not be lighted and public address systems will not be allowed. 2. Measures are required to be taken during construction activities to. prevent fugitive dust emissions. 3. The times of construction activities are limited to prevent significant noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. 7. The applicant is required to submit to the Public Works Department an estimate and analysis, prepared by a registered engineer, of traffic generation .and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that a left turn lane or other road improvements are needed, the applicant is required to construct the improvements prior to issuance of the Use Permit. B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Planland use designation allows quasi -public uses as Secondary Uses. a Butte County Department of Development Services ArAgenda Report s Page 7 i I. Uphold the appeal by the project applicant based upon the following finding: a. Left turn pockets on Pentz Road at Safari Lane are not necessary because most traffic generated by the project will come from the north of the site and make a right turn onto Safari Lane. Vehicles exiting the site will do so north of the intersection of Pentz Road and Safari Lane, turning left onto Pentz Road. H. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act, that said study identified potential significant environmental effects and includes mitigation measures that would mitigate such effects below significant levels, and that a Mitigated Negative Declaration is proposed. B. Find that the -Board of Supervisors has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process. C. Find, on the basis of the whole record before the Board of Supervisors, including the Initial Study and any comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will have a significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the County, which is the lead agency. III. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain any significant amounts of wildlife habitat. The undeveloped area on the project site that contains extensive wildlife habitat will not be disturbed by the project. Therefore, a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made. The collection of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. IV. Approve Use Permit 01-15 for the Paradise Evangelical Free Church, subject to the conditions found in Exhibit A, with the exception of Condition # 9, which is deleted, with the following findings: Ar Butte County Department of Development Services irAgenda Report o Page 8 ar A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: 1. The athletic field will not be lighted and public address systems will not be allowed. 2. Measures are required to be taken during construction activities to prevent fugitive dust emissions. 3. The times of construction activities are limited to prevent significant noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Plan land use designation allows quasi -public uses as Secondary Uses. K:\PROJECTS\UPC\EVANGEL\BOS:RPT Butte County Department of Development Services &Agenda Report x Page 9 s EXHIBIT A USE PERMIT BUTTE COUNTY BOARD OF SUPERVISORS DATE: (Certified Mail Rec.) UP 01A5 PERMIT NO. 055-290-083 ASSESSOR'S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the County of Butte and the special conditions set forth below, the Paradise Evangelical Free Church is hereby granted a Use Permit in accordance with the application filed for an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project will involve the grading of approximately 2.2 acres of land. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit, constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65. 2. Unless otherwise provided for in a special condition to this use permit, all conditions must be completed prior to or concurrently with the establishment of the granted use. The use granted by this permit must be established within 24 months of the delivery of the countersigned permit to the Permittee: 3. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works, or their respective designee, upon receipt of a substantiated written request by the applicant. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If any use for which a use permit has been granted is not established within two years of the date of receipt of the countersigned permit by the Permittee, the permit shall become null and void and reapplication and a new permit shall be required to establish the use. 5. The terms and conditions of this permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. iButte County Department of Development Services wAgenda Report &Page 10 jr Conditions of Approval: Measures shall be taken to control fugitive, dust emissions from all civil' construction associated with development of the site. Standard Mitigation Measures to prevent or reduce fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. Use of the athletic field and the gymnasium shall be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. No activity shall be allowed after dark and no public address systems shall be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is date- stamped February 13, 2001, and is incorporated herein by this reference. 8. Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S- 18 road approaches and construct them to County standards, as specified in County Improvement Standards. Ar Butte County Department of Development Services oAgenda Report x Page 11 Ar 9. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct left turn pockets on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works. Department for review and comment. Any road improvements identified in the analysis as ' being required shall be installed by the applicant prior to issuance of the Use Permit. (Note: . This condition to be deleted if the Board of Supervisors upholds the appeal by the project applicant) 10. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution_ for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) 11. Prior to the issuance of a building permit for.the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire hydrant. 12. Building permits required. Prepare four (4) sets of construction plans and make an application for permit. Construction shall comply with federal, state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. 13. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 14. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. 15. Proposed improvements shall comply with Use Permit conditions applicable to construction. 16. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 17. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. Butte County Department of Development Services ArAgenda Report sPage 12 Ar Environmental Health Division 18. Under County permit, upgrade the existing septic systems. to accommodate increased .development. 19. Prior to issuance of the Use Permit, obtain approval from the Del Oro Water Company that they are.able and willing to provide the necessary flows to service the entire project. Other Conditions 20. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. I hereby declare under penalty of perjury that I have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. Dated: Applicant NOTE: Issuance of this Use Permit does not waive requirement of obtaining Building and Health Division permits before starting construction, nor does it waive any other requirements. Butte County Board of Supervisors CC: Land Development Division Building Division Environmental Health. Department Butte County Fire Department/CDF . Assessor's Office ArButte County Department of Development Services xAgenda Report ir Page 13 w Board Agenda Form Board Agenda. Report with Action Attachment A: Zoning/General Plan Map Attachment B: Letter of Appeal, dated April 26, 2001, from Beth and Jo Ann Knappenberger . Letter of Appeal, dated April 30, 2001, from Pastor Igmar Jacobsen Attachment C: April 26, 2001, Planning Commission Agenda Report and Minutes Attachment D: Correspondence Attachment E: Public Works Department Memorandum, dated May 8,'2001 Attachment F: Initial Study Attachment G: Site Plan r 4 21 . 33 34 65 BUTTE COUNTY BOARD OF SUPERVISORS AGENDA REPORT - MAY 223, 2001 Appellants: 1. Beth and Jo Ann Knappenberger 2. Paradise Evangelical Free 'Church (Pastor Igmar Jacobsen) Applicant: Paradise Evangelical Free Church File #: APL 01-09 (UP 01-15) Request: Appeal of a Planning Commission decision for a Use Permit to allow an athletic field (baseball, soccer, etc.) and restrooms, and for a 6,000 square foot gymnasium with restroom and shower facilities. G.P.: Low Density Residential Zoning: AR -1 (Agricultural - Residential, 1 -acre minimum parcel size) and H -C (Highway Commercial) c APN: 055-290-083 Location: On the north side of Safari 'Lane, on the northwest corner STAFF COMMENT of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. Parcel Size: 19 acres Zone Date: AR -1: April 4, 1998 H -C: February 23, 1982 Supervisorial District: 4 Project Planner: Stephen Betts Senior Planner Attachments: A. Zoning/General Plan Map B. Letter of Appeal, dated April 26, 2001, from Beth and Jo Ann Knappenberger C. Letter of Appeal, dated April 30, 2001, from Pastor Igmar Jacobsen D. April 26, 2001, Planning Commission Agenda Report and Minutes E. Correspondence F. Initial Study G. Site Plan These appeals are made pursuant to Butte County Code Section 24-45.30 and is a "de novo' hearing. The Board of Supervisors may consider all applications, papers, maps, exhibits, and staff recommendations presented to the Planning Commission in reaching its decision. PROJECT DESCRIPTION The project being appealed is a Use Permit to allow an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The athletic field will be used for games held by the church congregation and for church league games. The applicant does not propose to allow non -church leagues (i.e., Paradise Recreation District) or the general public to use the athletic field or gymnasium. The applicant anticipates that the field will be used for organized games three to four times per week by the church congregation and three to four church league games per year. No lighting of the athletic field is proposed, nor is the sale of food or beverages. Approximately 2.2 acres of the site will be graded to create level areas for the athletic field, restrooms, and gymnasium. The church was constructed in 1986, after a Use Permit was obtained for that use. The final map for the Unique Acres Subdivision, which is located adjacent to and north of the project site, was recorded in 1993. PLANNING COMMISSION ACTION On April 26, 2001, the Planning Commission held a public hearing on the Use Permit for the Paradise Evangelical Free Church. Testimony was received from several landowners in the area in opposition to the project. The primary concerns of the people in opposition to the project were that r J�kC the proposed athletic field and gymnasium uses would create more noise, additional vehicle traffic, e�e criminal activity ' , cause baseballs to land in the adjacent properties, and interfere with wildlife movements. In response, several members of the church spoke, stating that the impacts caused by proposed athletic field and gymnasium uses would be minimal to adjacent residents. After closing the project to public comment, the Commission discussed the project in detail. The Planning Commission took into consideration the concerns of the people opposing the project during their discussion of the project, but concluded that the project will not result in significant impacts to the neighborhood. The Commission voted 5-0 to approve the project. A condition was added to prohibit the use of outdoor public address systems. The agenda report and the draft minutes for the April 26, 2001, Planning Commission meeting are attached for background information. REASON FOR APPEALS Two appeals have been submitted with regards to this project. Each appeal is addressed separately below. First Appeal �S 1'_J The first appeal is by , who state that they have many oppositions/concerns regarding the conditions of approval. J@Adm KttappeHbeTer submitted documents at the' Planning Commission meeting that listed the reasons for opposition t,® the woS lecs Ar Butte County Department of Development Services ir Agenda Report Ar Page 2 w 9 1 • project. The submitted material is found in Attachment E of this report. In response to the main concerns of3ee and the other landowners in the area, the following is offered: 1. Noise lmpacts Construction noise, especially grading equipment, will create noise during site development activities that has the potential to cause an impact to nearby residents. A condition of the project limits development activity from 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10:00 a.m. to 6:00 p.m. Saturday, Sunday, and holidays. This is a standard noise condition and is frequently used for projects in residential areas. Participants of the games being played on the athletic field, along with spectators, will generate noise in the form of yelling and cheering. This noise may be heard by the residents to the north of the site. The site plan shows that the baseball diamond is configured to place the infield and the spectators approximately 300 feet from the adjacent residential parcels. Due to the low number of times that the playing field will be utilized noise generated by the players or spectators is not expected to create a significant impact. According to the applicant, approximately three to four games will be played on the athletic field each week. Three to four church league games may be played over the course of a year. The athletic field will never be used when the church is meeting.rL-,-- �u,bvPh;^am a �+i) The project will result in a minor increase in vehicle traffic on Pentz Road, but this is not expected to be significant due to the low number of games that will be played. The project will not create any impacts to the roads in the adjacent Unique Acres Subdivision. There is adequate parking on the site to handle the parking for vehicles coming to the proposed athletic field and gymnasium, so no off-site parking will occur. VrhN4-- &ffie getter S',�jrii ,icinn hPc`ancP � +,• +L.o ..L.,,rnh ;� �.,•,,., Do,,,+a�-T�[1^►fl, -v^v�6e-c Lighting, Public Address System- and Sales of Food and Beverages QY- Q-- ConcerNvso raised about night lighting of the athletic field, noise from a public address systems, and sales of food and beverages. Conditions of the project prohibit the use of night time lighting of the athletic field and the use of public address systems. Food and beverage sales were not requested by the applicant as a part of the project and tie would not be allowed under the terms of the Use Permit. Ar Butte County Department of Development Services ir Agenda Report Ar Page 3 N • - • 1 : 1M Vn ! :1!/111: 11 a 3,31 1" /. M 19 . • Concern was raised that the church would rent the athletic field for soccer games. A condition of the project specifically prohibits the use of the proposed facilities by the general public, which includes any public recreation district or public or private recreation league. Several nearby landowners objected to the project because they believed that the people using the proposed athletic field and gymnasium would cause an increase in crime in the neighborhood. The owner of the adjacent bait and tackle store stated that he could lose his beer and alcohol license due to the presence of numerous children in the area. He also stated that the children will go to his store and create problems, and that drug use would increase in the area. While more people will come to the site due to the project, most if not all of them will be associated either with the Paradise Evangelical Free Church or other churches in the Paradise area. Most of the games will be played by children, but under the supervision of adults. The extensive brush location along the north property line will prevent or discourage people from trespassing on the adjacent residential parcels. NININIff 11 • . • Most of the area where the athletic field is proposed to be located was cleared many years ago and currently consists of native and non-native grasses, scattered wildflowers, numerous manzanita shrubs one to two feet tall, and small buckbrush shrubs. Several pine trees may have to be removed for the athletic field and the gymnasium. Approximately 14 acres of the 19 -acre project site consists of oaks, pines, and extensive brush, including manzanita, buckbrush, and poison oak. This 14 -acre area, which is to the west of the existing church and descends into the Dry Creek Canyon, may contain large wildlife populations. Additionally, there is a 15 to 20 -foot wide heavily vegetated strip along the north and northeast property lines that could be habitat for some wildlife species, although at low population levels due to the adjacent residential uses. The vegetated strip along the north property line is a condition of the Unique Acres Subdivision Map. The proposed athletic field and gymnasium will not encroach into the 14 -acre natural area or the vegetated strip. The project site is located within a deer herd area, and the area has been designated by the California Department of Fish and Game as a Designated Development Zone (DDZ). Parcels within a DDZ are allowed to develop as allowed by the zoning of the parcel and to the density as allowed by the zoning. Resident deer are located in the area and may frequent the site. The project is not expected to have a significant impact to any animal species, including deer, because other than a few pine trees, no significant vegetation will be removed. The grass that will be planted on the athletic field may even attract deer to the site, thus increasing the deer usage of the site. Ar Butte County Department of Development Services mAgenda Report s Page 4 Ar 0 0 1 7. Baseballs Falling on Ad' it Parcels rot t The orientation of the baseball field leads to the potential for a baseball to land on a parcel in the adjacent Unique Acres Subdivision. Reconfiguring t e baseball field in the opposite direction, so that baseballs will be hit to the south, will w4v �aseballs from going into the adjacent parcels but will result in the infield and the spectators being close to the property line. s. Due to the long distance from home base to the property line, which is approximately 310 feet, very few baseballs are expected to fall on the adjacent parcels. The second appeal of the project was by the applicant. The church's representative, Pastor Igmar Jacobsen, objects to the Public Work's condition requiring the applicant to either install a left turn pocket on Pentz Road at Safari Lane, or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the analysis showed that the project would not cause an impact to vehicle circulation, installation of the left turn pocket would not be required. Conversely, if the analysis showed that, a left turn pocket was necessary, the applicant would be required to construct it. Pastor Jacobsen states in his appeal letter that the Public Works Department had not done any analysis of the impact that the project would have on traffic flow and that they have not submitted any data to show that the left turn pocket is necessary. According to Pastor Jacobsen, 99% of the traffic generated by people using the proposed facilities will come from the north of the site, and make a right turn onto Safari Lane. The left turn pocket would not be necessary b�jcause vehicle traffic generated by the project would not use it. \ `G Wz,r`LS s� 5 U�Z Safari Lane currently provides access to four parcels, one of which is the project parcel and one that £ Q,S also has access onto Pentz Road. ACTIONS FOR CONSIDERATION fO Staff recommends that the Board of Supervisors deny the appeal sought by both appellants, and �—CJ) approve the project, based upon the findings and conditions as approved by the Planning -k Commission. � tw j VdPQ cr.1 N 2V f <53 okX5 I. Deny the appeal byM —1; kNkvA based upon the following finding: II a. Conditions of project approval will ensure that the project does not create any significant impacts to the neighborhood. Deny the appeal by isevofe, d based upon the following findings: a. A condition of project approval requires the applicant to submit to the Public Works Department an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by y the project. If the UJ � L c -- � �S0.�(:;AP v$ v Q 3 00,0/0 QAJ �,!, CY0,4 /ia�� ArButte County Department of Development Services rAgenda Report ArPage 5 Ar 0 traffic estimate/analysis determines that the project will create significant impacts to the intersection of Pentz Road and Safari Lane, a left turn pocket or other road improvements as determined by the analysis are. required to be constructed by the applicant. III. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act, that said study identified potential significant environmental effects -and includes mitigation measures that would mitigate such effects below significant levels, and that a Mitigated Negative Declaration is proposed. B. Find that the Board of Supervisors has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process. C. Find, on the basis of the whole record before the Board of Supervisors, including the Initial Study and any comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will have a significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the County, which is the lead agency. IV. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain any significant amounts of wildlife habitat. Therefore, a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made. The collection of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. V. Approve Use Permit 01-15 for the Paradise Evangelical Free Church, subject to the conditions found in Exhibit A, with the following findings: A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: The athletic field will not be lighted and public address systems will not be allowed. 2. Measures are required to be taken during construction activities to prevent fugitive dust emissions. ArButte County Department of Development Services ArAgenda Report s Page 6 J 3. The times of construction activities are limited to prevent significant noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. 7. The applicant is required to submit to the Public Works Department an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that a left turn lane or other road improvements are needed, the applicant is required to construct the improvements prior to issuance of the Use Permit B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Plan land use designation allows quasi -public uses as Secondary Uses. KAP ROJ ECTSWPOE VANGWBOS. RPT ArButte County Department of Development Services ir Agenda Report wPage 7 Ar EXHIBIT A USE PERMIT BUTTE COUNTY BOARD OF SUPERVISORS DATE: (Certified Mail. Rec.) UP 01-15 PERMIT NO. 055-290-083 ASSESSOR'S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the County of Butte and the special conditions set forth below, the Paradise Evangelical Free Church is hereby granted a Use Permit in accordance with the application filed for an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project will involve the grading of approximately 2.2 acres of land. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit, constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65. 2. Unless otherwise provided for in a special condition to this use permit, all conditions must be completed prior to or concurrently with the establishment of the granted use. The use granted by this permit must be established within 24 months of the delivery of the countersigned permit to the Permittee. 3. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works, or their respective designee, upon receipt of a substantiated written request by the applicant. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If any use for which a use permit has been granted is not established within two years of the date of receipt of the countersigned permit by the Permittee, the permit shall become null and void and reapplication and a new permit shall be required to establish the use. The terms and conditions of this permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. Ar Butte County Department of Development Services ArAgenda Report Ar Page 8 x • 0 Conditions of Approval: 1. Measures shall be taken to control fugitive dust emissions from all civil construction associated with development of the site. Standard Mitigation Measures to prevent or reduce fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. 5. Use of the athletic field and the gymnasium shall be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is date- stamped February 13, 2001, and is incorporated herein by this reference. 8. Outdoor public address systems shall not be used on the property. 9. Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S- 18 road approaches and construct them to County standards, as specified in County Improvement Standards. Ar Butte County Department of Development Services ArAgenda Report Ar Page 9 Ar • 0 10. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct a left turn pocket on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works Department for review and comment. Any road improvements identified in the analysis as being required shall be installed by the applicant prior to issuance of the Use Permit. 11. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) 12. Prior to the issuance of a building permit for the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire hydrant. 13. Building permits required. Prepare 4 sets of construction plans and make an application for permit. Construction shall comply with federal, state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. 14. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 15. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. 16. Proposed improvements shall comply with Use Permit conditions applicable to construction. 17. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 18. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. ArButte County Department of Development Services wAgenda Report ArPage 10 Ar 19. Under County permit, upgrade the existing septic systems to accommodate increased development. 20. Prior to issuance of the Use Permit, obtain approval fro the Del Oro Water Company that they are able and willing to provide the necessary flows to service the entire project. 21. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. . I hereby declare under penalty of perjury that I have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. Dated: Applicant NOTE: Issuance of this Use Permit does not waive requirement of obtaining Building and Health Division permits before starting construction, nor does it waive any other requirements. Butte County Board of Supervisors CC: Land Development Division Building Division Environmental Health Department Butte County Fire Department/CDF Assessor's Office ArButte County Department of Development Services ir Agenda Report ir Page 11 a 1 Project: Paradise Evangelical Free Church, UP 01-15 COUNTY OF BUTTE INITIAL STUDY EVALUATION OF ENVIRONMENTAL IMPACTS I. BACKGROUND: Name of Proponent: Paradise Evangelical Free Church 2. Address: 5095 Pentz Road, Paradise, CA 95969 Phone: (530) 877-4241 3. Name of Proposal: N/A 4. Type of Project: Use Permit 5. Project Description: This is an application for a Use Permit to allow an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project is proposed to be developed in three phases: Phase 1 - Construction of the athletic field upon approval of the Use Permit Phase 2 - Restrooms adjacent to the athletic field (one to two years after approval of the Use Permit Phase 3 - Gymnasium (two to five years after approval of the Use Permit) The athletic field will be used for games held by the church congregation and for church league games. The applicant does not propose to allow non -church leagues (i.e. Paradise Recreation District) to use the athletic field or gymnasium. The applicant anticipates that the field will be used for organized games two to three times per week by the church congregation and three to four church league games per year. No lighting of the athletic field Js proposed. Approximately 2.2 acres of the site will be graded to create a level areas for the athletic field, restroom, and gymnasium. 6. Location of property: On the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. Setting: The 20 -acre project parcel is developed with a 13,000 square foot church, parking lots, and a septic system. The site has a driveway onto Pentz Road and a driveway on Safari Lane. The project site sits on the edge of Dry Creek Canyon and most of the site is undeveloped. Vegetation on the site consists of a mixture of yellow pine and Black Oak with dense brush along the sides of the canyon. The area where the athletic field and gymnasium will be located consists of eight yellow pines and grasses. This area gradually slopes down to the southwest and has a slope of approximately 5%. No drainages are found on the site. A fire hydrant is located on the southeast corner of Pentz Road and Wilderness Way. 0 Butte County Department of Development Services 0 Planning Division ■ • Project: Paradise Evangelical Free Church, UP 01-15 The project site is zoned H -C (Highway Commercial) and AR -1 (Agricultural Residential, 1 -acre minimum parcel size). The H -C zoned is located adjacent to Pentz Road and extends from 60 to 100 feet from the Pentz Road right-of-way. The project site has a General Plan Land Use designation of Low Density Residential. Surrounding parcels are zoned H -C to the east and AR -1 to the south and west. The parcels located on the north side of the site are located in the Town of Paradise and are zoned .for residential uses. Surrounding parcels range in size from .8 acres to 24 acres. Land uses on surrounding parcels include single family dwellings to the south, west, and north; a bait and tackle store to the northeast, and mobile home/recreational vehicle parks to the east (across Pentz Road). 8. Assessor's Parcel Numbers: 055-290-083 9. Date Checklist Submitted: April 4, 2001 10. Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement): Butte County Building Division, Butte County Public Works Department, Butte County Fire Department/CDF, Butte County Environmental Health Division. II. DETERMINATION: On the basis of this initial evaluation: ❑ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared., I find that although the proposed project COULD have a significant effect on the environment, ❑K there will NOT be a significant effect in this case because revisions have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. ❑ I find that the proposed project COULD have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment; but at least one effect 1) has been ❑ adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. ■ Butte County Department of Development Services ■ Planning Division ■ 2 Project: Paradise Evangelical Free Church, UP 01-15 I find that although the proposed project could have a significant effect on the environment, ❑because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Prepared by: Stephen Betts, Senior Planner Date Reviewed by: BAndy Wilson, Principal Planner Date III. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below could be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. ❑ Aesthetics ❑ Biological Resources ❑ Hazards/Hazardous Materials ❑ Mineral Resources ❑ Public Services ❑ Utilities/Service Systems ❑ Agriculture Resources ❑ Cultural Resources ® Hydrology/Water Quality ❑ ® Noise ❑ ❑ Recreation ❑ ❑ Mandatory Findings of Significance EVALUATION OF ENVIRONMENTAL IMPACTS: Air Quality Geology/Soils Land Use/Planning Population VHousing Transportation/Traffic 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project -specific factors as well'as general standards, (e.g., the project will not expose sensitive receptors to pollutants based on a project -specific screening analysis.) 2) All answers must take account of the whole action involved including off-site as well as on- site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 0 Butte County Department of Development Services ■ Planning Division 0 • Project: Paradise Evangelical Free Church, OP 01-15 • Less Than Significant Less Potentially With Than Significant Mitigation Significant No Impact Incorporated Impact Impact 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063 (c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analysis Used: Identify and state where they are available for review. b) . Impacts Adequately Addressed: Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. C) Mitigation Measures: For effects that are "Less Than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site- specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) The explanation of each issue should identify: a) The significance criteria or threshold, if any, used to evaluate each question; and ■ Butte County Department of Development Services ■ Planning Division ■ 4 0 . • Project: Paradise Evangelical Free Church, OP 01-15- b) The mitigation measure identified, if any, to reduce the impact to less than significant. IV. ENVIRONMENTAL IMPACTS: 1. AESTHETICS. Would the project: a) Have a substantial adverse effect on a scenic vista? X b) Substantially damage scenic resources including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or quality of the site and its surroundings? d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? X Response: X X a. - d. This project will allow the construction of an athletic field, a 500 square foot restroom adjacent to the athletic field, and a 6,000 square. foot gymnasium. The proposed athletic field and restroom are located approximately 260 feet from Pentz Road and will be difficult to see due to long distance and intervening trees. The proposed gymnasium will be located on the north side and adjacent to the existing church. The gymnasium will also be difficult to be seen from Pentz Road due to the intervening trees and because the existing church will block a portion of gymnasium. The project site is not located along a County or State designated scenic highway. (the portion of Pentz Road from Highway 70 to a point approximately 1.2 miles south of the project site is a County -designated scenic highway.) Pentz Road along the project site is a Town of Paradise -designated scenic highway, which extends 100 feet from the centerline of Pentz Road, between the southern Sphere of Influence line, which begins 2.25 miles south of the site, and the intersection with Skyway at the northern town limits. The proposed athletic field, restroom, and gymnasium will be located over 200 feet from the centerline_ of Pentz Road. The project will not create an aesthetic impact. ■ Butte County Department of Development Services ■ Planning Division ■ 5 N 9 Project: Paradise Evangelical Free Church, UP 01-15 Less Than Significant Potentially With Significant Mitigation Impact Incorporated Less Than Significant No Impact Impact Nighttime lighting of the athletic field was at first proposed by the applicant. However, the applicant subsequently stated that games are not anticipated to be played at night and has withdrawn the request for night lighting of the athletic field. A condition of the project will prohibit lighting of the athletic field. The church may decide in the future to light the athletic field, but doing so will require another Use Permit application be submitted and approved by the Planning Commission. *Other outdoor lighting, such as security and safety lights located on the gymnasium, are not expected to cause a significant impact due to the distance of the facility away from Pentz Road and from adjacent parcels. Mitigation Measure: None required. 2. AGRICULTURE RESOURCES: In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? �t b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? 1t c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? �t a. - c. No agricultural uses are established on the project site or in the project area. There is no California Land Conservation Agreement ("Williamson Act") contract affecting the property. The soils on the site have a Soil Conservation Service Classification ■ Butte County Department of Development Services ■ Planning Division ■ C. 0 Project: Paradise Evangelical Free Church, UP 0 1- 15 Less Than Significant Potentially . With Significant Mitigation Impact Incorporated Less Than Significant No Impact Impact of IV, which are suitable for cultivation but have some limitations (Butte County Master Environmental Assessment, Table LU -4). The majority of the site consists of steep slopes and is heavily vegetated with brush. The project will not have an impact on agricultural uses. Mitigation Measure: None required. 3. AIR QUALITY. Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non -attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of people? _ Response: X te X X x. a. - c. Butte County, and all northern Sacramento Valley Air Districts, have been designated as "moderate" nonattainment areas for the state standards for ozone (03) and fine particulate matter (PM10). Currently, Butte County is in attainment for all the federal (less stringent) air quality standards. ■ Butte County Department of Development Services ■ Planning Division ■ J 7 • Project: Paradise Evangelical Free Church, UP O1-15 • Less Than Significant Less Potentially with Than Significant Mitigation Significant No Impact Incorporated Impact Impact The project may result in a minor increase in vehicle emissions in the project area due to the vehicle trips generated by people driving to and from the site. The minor increase in vehicle emissions' generated by the proposed use is not expected to be significant. Grading and other soil disturbance activities will be required to create level areas for the proposed athletic field and the gymnasium. Fugitive dust emissions may occur during development activities on the site, such as grading and excavation for foundations, which may create a temporary nuisance to persons residing near the project site. The Butte County Air Quality Management District requests that measures, 'such as site and driveway watering and/or use of other acceptable soil palliatives, be incorporated during development activities on the site. A mitigation measure is recommended that requires measures be taken, to prevent fugitive dust emissions during development activities. d. No sensitive receptors, such as schools or hospitals, are located near the project site. e. The project will not create any odors. Mitigation Measure # 1: Prior -to any soil disturbance and prior to the issuance of a building permit, the applicant shall submit an improvement plan with respect to fugitive dust and air pollution to the Butte County Air Quality Management District for review and determination of approval. Said plan shall include measures to control fugitive dust emissions from all civil construction associated with development of the site. Measures may include site and road watering and/or use of other acceptable soil palliatives. Measures determined to be acceptable by the Air Quality Management District shall be implemented during all development activities on the site. A copy of the approved plan shall be submitted to the Building Division and the Planning Division. 4. BIOLOGICAL RESOURCES. Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional ■ Butte County Department of Development Services ■ . Planning Division ■ E:3 Project: Paradise Evangelical Free Church, UP 01-15 Less Than Significant Less Potentially With Than Significant Mitigation Significant No Impact Incorporated Impact Impact plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? K b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? >� c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? �t d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? x e) Conflict with any local policies or ordinances protecting biological resources such as a tree preservation policy ordinance. �t f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? 1t ■ Butte County Department of Development Services 0 Planning Division 0 i Project: Paradise Evangelical Free Church; UP 01-15 Potentially Significant Impact Response: Less Than Significant Less With Than Mitigation Significant No Incorporated Impact Impact a. - d. Vegetation in the area of the proposed athletic field and gymnasium consists of pines, and grass. The western portion of the site, which drops down into Dry Creek Canyon, is vegetated with pines, oaks, and heavy brush. No riparian vegetation, wetlands, or vernal pools are located in the area proposed for development. The project is not known to be inhabited or provide habitat for any rare, endangered animal or plant species (Butte County Master Environmental Assessment, Figure Bio -2). The project site is not located within deer herd critical or non-critical winter habitat. This project will not have an impact to fish and/or wildlife because the area to be developed does not contain any significant wildlife habitat and the payment of fees under Public Resources Code Section 21089 and as defined by Fish and Game Code Section 711.4 is not required. e. Approximately six pine trees will have to be removed due to construction of the proposed athletic field and gymnasium. The removal of the pines will not have a significant impact on wildlife habitat because the western portion of the site contains extensive amounts of trees and brush, which serves as the primary wildlife habitat on the site. This area will not be disturbed due to the project. f. The proposal will not conflict with the provisions of an adopted Habitat Conservation Plan. Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan. Mitigation Measure: None required. 5. CULTURAL RESOURCES. Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in § 15064.5? K b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? X ■ Butte County Department of Development Services ■ Planning Division ■ 10 • Project: Paradise Evangelical Free Church, UP O1-15� Potentially Significant Impact c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? _ • Less Than Significant with Mitigation Incorporated Less Than Significant No Impact Impact X d) Disturb any human remains, including those interred outside of formal cemeteries? K Response: a. - d. According to Butte County constraints mapping, the project site is located in an area considered to have a low to medium archeological sensitivity. An archaeological field inspection was conducted on the eastern portion of the site, from the edge of the canyon to Pentz Road, for the existing Use Permit (BP Enterprises Archaeology Consultants, James Manning, Archaeology Consultant, June 21, 1985). No materials or features indicative of prehistoric or early historic activity were observed during the field inspection and archaeological clearance was given. This project is not expected to cause an impact to any cultural resources. Mitigation Measure: None required. 6. GEOLOGY AND SOILS. Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: 1) Rupture, of a known earth- quake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other sub- stantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. X ■ Butte County Department of Development Services ■ Planning Division ■ 11 • Project: Paradise Evangelical Free Church; UP 01-15 2) Strong seismic ground shaking? • Less Than Significant Potentially With Significant Mitigation Impact Incorporated 3) Seismic -related ground failure, including liquefaction? 4) Landslides? Less Than Significant No Impact Impact x v FA b) Result in substantial soil erosion. or the loss of topsoil? c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating sub- stantial risks to life or property? _ e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal system where sewers are not available for the disposal or waste water? _ Response: r ' X r a.1. The Seismic Safety Element of the Butte County General Plan indicates that all of Butte County is in Moderate Earthquake Intensity Zone VIII. A possible fault with activity unknown is located approximately .9 miles to the northeast of the site (Butte County GIS seismic constraints mapping). All new structures placed on the site will be constructed to Uniform Building Code standards for seismic safety. No impact is expected to occur. ■ Butte County Department of Development Services ■ . Planning Division ■ 12 Project: Paradise Evangelical Free Church, UP 01-15 • Less Than Significant Less Potentially With Than Significant Mitigation Significant No Impact Incorporated Impact Impact a.2. The intensity of ground shaking at any specific site depends on the characteristics of the earthquake, the distance from the earthquake, and on the local geologic soils and conditions: At present, there is insufficient data to predict accurately the expected ground motions at various locations in Butte County. a.3.• The Butte County Seismic Safety Element's Liquefaction Potential Map indicates that the site has a low potential for liquefaction. No impact is anticipated. a.4. The Subsidence and Landslide Potential Map of the Safety Element of the Butte County General Plan indicates that there is a low to moderate potential for landslides in this area. No impact is anticipated because the site does not contain any slopes. b. The Erosion Potential Map of the Safety Element of the Butte County General Plan indicates that the soil erosion potential of this site is slight. The area where the athletic field will be located has a slope of approximately 5% and extensive grading will be required to create a level area. Additional grading will be required to create a level area for the gymnasium. The project area has a high rainfall rate (45 to 55 inches per year) and exposed soils as a result of grading activities may be subject to significant erosion during rainfall events. Water runoff from the site drains into Dry Creek, and the potential exists that sediments from exposed soils on the site may drain into that water course. In order to prevent significant soil erosion impacts, a Best Management Plan that addresses erosion control during site preparation and building construction is required to be submitted to and approved by the Public Works Department. A grading permit for grading on the site is not required because grading authorized by the terms of a discretionary permit, such as a Use Permit, is exempt from having to obtain a grading permit (Butte County Code section 13.5.(i)). C. No impact is anticipated from instability, landslide, lateral spreading, subsidence, liquefaction or collapse. d. The Conservation Element's Expansive Soils Map indicates that the project site has a moderate expansive soil designation. No impact is anticipated. Sewage disposal for the existing church is handled by on-site septic systems. Sewage disposal for the proposed restrooms and gymnasium will be handled by the on-site septic systems. The Butte County Environmental Health Division does not object to the use of a septic system for the proposed restroom and gymnasium, but requests that the existing septic systems be upgraded to accommodate the proposed facilities. ■ Butte County Department of Development Services ■ Planning Division ■ 13 Project: Paradise Evangelical Free Church; UP 01-15 Potentially Significant Impact Mitigation Measure # 2: • Less Than Significant Less W ith - Than' Mitigation Significant No Incorporated Impact Impact Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. 7. HAZARDS AND HAZARDOUS MATERIALS. Would the project: a) Create a significant hazard to the public or the environment through the routine transport use, or disposal of hazardous materials? X b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? K c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed schools? X d) Be located on a site which is included on a list of hazardous materials sites complied pursuant to Government Code ■ Butte County Department of Development Services ■ Planning Division ■ 14 Project: Paradise Evangelical Free Church, UP 01-15 Less Than Significant Less Potentially With Than Significant Mitigation Significant No Impact Incorporated Impact Impact Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? X e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety.hazard for people residing or working in the project area? X f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? K g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? K h) Expose people or structures to'a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? X Response: a. - d. The project will not create any hazardous materials, and is not located on or near any sources of hazardous materials. e. - g.. The property is not located within the vicinity of an airport, airport land -use plan, or private airstrip. The project will not interfere with an adopted emergency response plan or emergency evacuation plan. No impact is anticipated. h. The project is located within a State Response Area for wildland fires and is within an area that has a very high fire hazard potential (Butte County GIS fire hazard coverage). Water is supplied to the site by the Del Oro Water Company and a fire ■ Butte County Department of Development Services ■ Planning Division ■ 15 Project: Paradise Evangelical Free Church, UP 01-15 • Less Than Significant Potentially with Significant Mitigation Impact Incorporated Less Than Significant No Impact Impact hydrant is located opposite the site at the intersection of Pentz Road and Wilderness Way. The Butte County Fire Department/CDF states that prior to the construction of the gymnasium the applicant must prove adequate fire flow is available to meet the increase in area. This may require that a fire hydrant be placed on the project site. Mitigation Measure: None required. 8. HYDROLOGY AND WATER QUALITY. Would the project: a) Violate any water quality standards or waste discharge requirements? b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on - or off-site? d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? X X ■ Butte County Department of Development Services ■ Planning Division ■ 16 X X Project: Paradise Evangelical Free Church, UP 01-15 0 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Impact Incorporated Impact Impact e) Create or contribute runoff water which would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade water quality? X g) Place housing within a 100 -year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? K h) Place within a 100 -year flood hazard area structures which would impede or redirect flood flows? X i) Expose people or structures to a significant risk or loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? X j) Inundation by seiche, tsunami, or mudflow? X Response a. - f. Approximately 6,500 square feet of impervious surfaces will be created due to the proposed gymnasium and washroom. An increase in surface water runoff can be expected due to the reduced absorption rate created from the impervious surfaces, which may have a significant impact on downstream drainages. The compacted soils of the proposed athletic field will have a lower permeability than soils left in their natural state, but this is not expected to cause a significant increase in stormwater runoff because the grass surface of the athletic field has a low runoff coefficient. In order to prevent any significant impacts to drainages, a plan for a permanent solution for drainage is required to be submitted to and approved by the Department of Public Works prior to issuance of a building permit for the gymnasium. The drainage plans are required to specify how drainage waters will be detained on site and/or conveyed ■ Butte County Department of Development Services ■ Planning Division ■ 17 0 Project: Paradise Evangelical Free Church; UP 01-15 0 Less Than Significant Less Potentially with Than Significant Mitigation Significant No Impact Incorporated Impact Impact to the nearest natural or publicly maintained drainage channel or facility and will provide that there be no increase in the peak flow runoff to said channel or facility. g. - i. The project site is not located within a 100 -year flood zone as shown on Federal Emergency Management Agency Flood Insurance Rate Map 06007C -0575C, dated June 8, 1998. The property is not located in an area prone to seiche, tsunami, or mudflow. No impact will be incurred with respect to these natural hazards. Mitigation Measure # 3: Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. 9. LAND USE AND PLANNING. Would the project? a) Physically divide an established community? K b) Conflict with an applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to, the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? X c) Conflict with any applicable habitat conservation plan or natural community conservation plan? K ■ Butte County Department of Development Services ■ Planning Division ■ 18 E Project: Paradise Evangelical Free Church, UP 01-15 Potentially Significant Impact Response: • Less Than Significant Less with Than Mitigation Significant No Incorporated Impact Impact a. The proposal will not physically divide an established community. b. The project site is zoned H -C (Highway Commercial) and AR -1 (Agricultural - Residential, 1 -acre minimum parcel size).. The H -C zone is located adjacent to Pentz Road and extends from approximately 60 to 100 feet onto the property, encompassing approximately .8 acres of the site. All of the proposed facilities are located in the AR -1 zone. The parcel is designated by the Land Use Element Map of the Butte County General Plan as Low Density Residential. Quasi -public uses, such as churches, are listed as a Secondary Use in the Low Density Residential designation. Quasi -public uses are allowed in the AR -1 and H -C zones with a Use Permit. The church use was permitted by Use Permit 85-60 in 1985. Surrounding parcels are zoned H -C to the east and AR -1 to the south and west. The parcels located on the north side of the site are located in the Town of Paradise and are zoned for residential uses. Surrounding parcels range in size from .8 acres to 24 acres. Land uses on surrounding parcels include single family dwellings to the south, west, and north, a bait and tackle store to the northeast, and two. mobile home/RV parks to the east (across Pentz Road). The project site is within the Town of Paradise's Sphere of Influence, with the Town limits adjacent to the site's north property line. The Town of Paradise does not object to the project but recommended that a detailed initial study of the project's environmental effects be conducted. C. The property is not within a habitat conservation plan or natural community conservation plan. No impact will be incurred. Mitigation Measure: None required. 10. MINERAL RESOURCES. Would theproject: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? ■ Butte County Department of Development Services ■ Planning Division ■ 19 k • Project: Paradise Evangelical Free Church, UP 01-15 • Less Than Significant Less Potentially with Than Significant Mitigation Significant No Impact Incorporated Impact Impact b) Result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? - k Response: a.— b. The proposed project would not use or extract any mineral or energy resources and would not restrict access to known mineral resource areas. The project is located within an area where there are little or no mineral resources. Therefore, the project would have no impact on mineral resources. Mitigation Measure: None required. 11. NOISE. Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or generation of excessive ground borne vibration or ground borne noise levels: _ c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? _ d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? _ X V X e) For a project located within an airport land use plan or, where such a plan has not been adopted; within two miles of X ■ Butte County Department of Development Services ■ Planning Division ■ 9C Project: Paradise Evangelical Free Church, UP 01-15 Potentially Significant Impact a public airport or public use airport; would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? Response: 0 Less Than Significant Less With Than Mitigation Significant No Incorporated Impact Impact K x a. - d. Ambient noise on and around the project area is affected primarily by uses associated with the existing church on the site, vehicle traffic on Pentz Road, and residential uses in the area. Noises generated by the church use consists mainly of vehicles arriving and departing the site. Other noise is generated by outdoor activities held by church members. Temporary and single event noise levels will be created during the construction phase. Grading equipment and construction ofthe gymnasium will generate the most noise. Vehicles containing construction workers, equipment, and material will also generate noise as they arrive and depart the site. The proposed athletic field will be located adjacent to parcels that have residential uses and the residents on these parcels may be significantly impacted by grading activities. Construction of the gymnasium will also generate noise that may cause an impact to nearby residents. In order to limit noise impacts to the nearby residents, a mitigation measure is recommended that limits construction activity from 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. Participants of the games being played on the athletic field, along with spectators, will generate noise in the form of yelling and cheering. This noise may be heard by the residents to the north of the site. According to the applicant, the number of games to be played will be very limited, perhaps two games per week. The games will be played during daylight hours, and then only during good weather. Use of the playing field will be limited to church members and to church league games. The applicant estimates that there will only be three to four church league games played per year. The playing field will not be open to member of the public (i.e., Paradise Recreation District). Due to the low number of times that the playing field will be utilized no significant noise impacts are anticipated. ■ Butte County Department of Development Services ■ Planning Division ■ 21 • Project: Paradise Evangelical Free Church, UP 01-15 • Less Than Significant Potentially with Significant Mitigation Impact Incorporated Less Than Significant No Impact Impact e. - f. The project is not located in the vicinity of an airstrip or within an airport land use plan. No impact will be incurred. Mitigation Measure # 4: All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. 12. POPULATION AND HOUSING. Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure? b) Displace substantial numbers.of existing housing, necessitating the construction of replacement housing elsewhere? c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? Response: X X x a. The project will not induce any population growth nor will it create a need for any new infrastructure which could induce population growth. A water line already extends onto the project site. b. - c. The project will not displace individuals or housing.s No impact will be incurred. Mitigation Measure: Norte required. ■ Butte County Department of Development Services ■ Planning Division ■ 22 Cl Project: Paradise Evangelical Free Church, UP O1-15 13. PUBLIC SERVICES. a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities,. the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services? b) Fire protection? Less Than Police Protection? Significant Less Potentially With Than Significant Mitigation Significant No Impact Incorporated Impact Impact a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities,. the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services? b) Fire protection? c) Police Protection? d) Schools? e) Parks?. f) Other public services? Response: a. The project will not create a need for any new public services. X b. The project will not create an increase in demand for fire protection services. The project will not result in an increase in fire hazard in the area. If a person is injured on the site the Butte County Fire Department, or the Town of Paradise Fire Department through mutual -service aid service, may have to respond to provide first aid. This is not expected to be significant due to the very low number of games that will be played on the field throughout the year. C. The proposal will not cause an increase in demand for police protection services because the proposed uses do not normally require such service. d. The proposal will not result in a demand for school facilities in the area. e. The proposal will not result in a demand to area parks and facilities. ■ Butte County Department of Development Services ■ Planning Division ■ 23 Project: Paradise Evangelical Free Church, UP O1-15 • Less Than Significant Less Potentially With Than Significant Mitigation Significant Impact Incorporated Impact f. The project will not have an impact on any other public services. Mitigation Measure: None required. 14. RECREATION. a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?_ b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? Response: No Impact X x - a. - b. The project will not increase the use of existing parks or other recreational facilities nor will the project create the need for any new parks or recreational facilities. The proposed project will help meet the recreational requirements of the church membership. The proposed playing field and gymnasium will not be open to the public. Mitigation Measure: None required. 15. TRANSPORTATION/TRAFFIC. Would the project: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? X ■ Butte County Department of Development Services ■ Planning Division ■ 24 0 Project: Paradise Evangelical Free Church, UP 01-15 • Less Than Significant Less Potentially with Than Significant Mitigation Significant No Impact Incorporated Impact Impact b) Exceed, either. individually or cumula- tively, a level of service standard established by the county congestion management agency for designated roads or highways? X c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? X d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? K e) Result in inadequate emergency access? X f) Result in inadequate parking capacity? X g) Conflict with accepted policies, plans or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? X Response: a. - e. The project site has a driveway on Pentz Road and on Safari Lane. The site interior road is one-way, with vehicles entering from Safari Lane and exiting onto Pentz Road. Pentz Road at the site is two lanes, with no center turning lane. The vehicle speed on Pentz Road at the site is 35 MPH. There is excellent site vision of Pentz Road in both directions from the site driveway. Pentz Road just south of the project site has an average daily traffic of 4,340 vehicles (Butte County Department of Public Works, 1999 vehicle count). The Level of Service along this portion of Pentz is "C" or better, which indicates that vehicle circulation is acceptable. According to the applicant, most church members live in Paradise, to the north of the site, and make a right turn into Safari Lane to access the site. Most vehicles exiting the site make a left turn onto Pentz Road. ■ Butte County Department of Development Services ■ Planning Division ■ 25 • Project: Paradise Evangelical Free Church, UP 01-15 • Less Than Significant Less Potentially With Than Significant Mitigation Significant No Impact Incorporated Impact Impact The number of vehicle trips that the project will generate is not expected to create any significant impacts on Pentz Road because the proposed gymnasium and athletic field will not be open to the general public. Church members will be the primary users of the proposed facilities, but church league games *may be played on the athletic field. According to the applicant, the number of games to be played will be very limited, perhaps three to four games per week. The applicant estimates that there will only be three to four church league games played per year., Due to the low number of vehicle trips that will be generated by the project, no significant vehicle circulation impacts are anticipated. In order to allow for better traffic circulation, the Public Works Department requests that a left turn pocket be placed on Skyway. This will be added as a condition of project approval. f. There are 97 parking spaces on the site for the existing church use. This number of parking spaces can easily accommodate the parking needs for people using the proposed facilities. g. The project will not conflict with accepted policies, plans or programs supporting alternative transportation. Mitigation Measurer None required. 16. UTILITIES AND SERVICE SYSTEMS. Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? X b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? X c) Require or result in the construction of ) new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? K ■ Butte County Department of Development Services ■ Planning Division ■ 26 • Project: Paradise Evangelical Free Church, UP 01-15 Potentially Significant Impact d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? _ g) Comply with federal, state, and local statutes and regulations related to solid waste? Response: • Less Than Significant Less With Than Mitigation Significant No Incorporated Impact Impact X X X a. - e. The Del Oro Water Company already provides domestic water to the church on the site. Additional water will be needed for the restroom, the gymnasium, and to water the athletic field. The Del Oro Water Company indicated that they can supply the additional water needed by the proposed facilities (phone conversation with John O'Farrel, 3/27/01). The project will not have an impact on any water or wastewater treatment facilities. No additional off-site storm water facilities will be necessary as a result of this project. f. The project will cause a very minor increase in the stream of waste being deposited in the Neal Road Landfill. g. No impact will be incurred to federal, state, and local statutes and regulations related to solid waste. Mitigation Measure: None required. ■ Butte County Department of Development Services ■ Planning Division ■ 27 Project: Paradise Evangelical Free Church, UP O1-15 Potentially Significant Impact 17. MANDATORY FINDINGS OF SIGNIFICANCE. a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop"below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively consider- able" means that the incremental effects . of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental effects which will cause substantial . adverse effects on human beings, either directly or indirectly? _ Response: • Less Than Significant Less With Than Mitigation Significant Incorporated Impact Y x No Impact X, The project has the potential to contribute impacts that are individually limited but cumulatively considerable with respect to cumulative impact to Initial Study Checklist Items 2.b. Air Quality, 6.b. Geology and Soils, 8.d. Hydrology and Water Quality, and l l .d. Noise. Cumulative impact to these areas will be mitigated due to the inclusion of Mitigation Measures # 1 4 as itemized under Section V. -Mitigation Measures and Monitoring Requirements. ■ Butte County Department of Development Services ■ Planning Division ■ 28 U Project: Paradise Evangelical Free Church, UP 01-15 • V. MITIGATION MEASURES AND MONITORING REQUIREMENTS: Prior to any soil disturbance and prior to the issuance of a building permit, the applicant shall submit an improvement plan with respect to fugitive dust and air pollution to the Butte County Air Quality Management District for review and determination of approval. Said plan shall include measures to control fugitive dust emissions from all civil construction associated with development of the site. Measures may include site and road watering and/or use of other acceptable soil palliatives. Measures determined to be acceptable by the Air Quality Management District shall be implemented during all development activities on the site. A copy of the approved plan shall, be submitted to the Building Division and the Planning Division. 2. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the. Planning Division and the Building Division have received a copy of the Best Management Plan., 3. Prior to the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. 4. All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. DATA SHEET A. Project Description 1. Type of Project: Use Permit for an athletic field, 500 square foot restroom, and a 6,000 square foot gymnasium. 2. Proposed Density of Development: N/A. 3. Amount of Impervious Surfacing: Approximately 6,500 square feet. 0 Butte County Department of Development Services 0 Planning Division 0 Project: Paradise Evangelical Free Church, UP 01-15 r 4. Access and Nearest Public Road(s): Driveways on Safari Lane and on Pentz Road. 5. Method of Sewage Disposal: On-site septic system. 6. Source of Water Supply: Del Oro Water Company. 7. Proximity of Power Lines: To property. 8. Potential for further land divisions and development: AR -1 zoning allows for 1 -acre parcels, but steep slopes may preclude land divisions on west portion of the site. B. Environmental Setting 1. Terrain a General Topographic Character: Ridgetop, sloping steeply down Dry Creek Canyon. b. Slopes: Average of 0 to 40%. C. Elevation: 1,620 feet above sea level. d. Limiting Factors: None. 2. Soils a. Types and Characteristics: Aiken, very deep (60" to 140" thick) soils, dark brown, load, clay, moderately slow permeability, moderate runoff potential. SCS Class IV soils, which are suitable for cultivation but have some limitations. b. Limiting Factors: Unknown. 3. Natural Hazards of the Land a. Earthquake Zone: Moderate Earthquake Intensity Zone VIII. b. Erosion Potential: Slight on eastern portion of site, high in western portion. C. Landslide Potential::. Low to moderate. d. Fire Hazard: Very high. e. Expansive Soil Potential: Unknown. 4. Hydrology a. Surface Water: None. b. Ground Water: Unknown, potentially limited. C. Drainage Characteristics: Property drains generally to the southeast. d. Annual Rainfall (normal): 45 to 55 inches per year. e. Limiting Factors: None. 5. Visual/Scenic Quality: Good. 6. Acoustic Quality: Adequate - noise from vehicles on Pentz Road. 7. Air Quality: Good. 8. Vegetation: Grasses, ceanothus, manzanita, poison oak, ponderosa pine, California black oak, scrub oak. 9. Wildlife Habitat: Small birds and animals common to lower mountains. Not within a deer herd area. 10. Archaeological and Historical Resources in the area: Low archaeological sensitivity area. 11. Butte County General Plan designation: Low Density Residential. 12. Existing Zoning: AR -1 (Agricultural -Residential, 1 -acre minimum parcel size) and H -C (Highway Commercial). ■ Butte County Department of Development Services ■ Planning Division ■ 0C is Project: Paradise Evangelical Free Church, UP 01-15. 13. Existing Land Use on-site: Church. 14. Surrounding Area: a. Land Uses: Commercial businesses, vacant lots, suburban residential, mobile home/RV parks. b. Zoning: H -C, AR -1, Town of Paradise (R -R). C. Gen. Plan Designation: Commercial, Low Density Residential. d. Parcel Sizes: .8 to 24 acres. 15. Character of Site and Area: Commercial and suburban residential. 16. Nearest Urban Area: Town of Paradise. 17. Relevant Spheres of Influence: Town of Paradise, Butte County Mosquito Control, Paradise Park and Recreation District, Butte College, Paradise Cemetery, CSA 164 (Animal Control). 18. Improvement Standards Urban Area: None. 19. Fire Protection Service: a. Nearest County (State) Fire Station: Station 34, approximately 6 miles to the north of the site on Skyway. b. Water Availability: Fire hydrants. 20. Schools: Union School District: Paradise Unified School District. ENVIRONMENTAL REFERENCE MATERIAL 1. Butte County Planning Department. Earthquake and Fault Activity Map 11-1, Seismic Safety Element, Oroville, CA: CH2M Hill 1977. 2. Butte County Planning Department. Liquefaction Potential Map 11-2, Seismic Safety Element. Oroville, CA: CH2M Hill, 1977. 3. Butte County Planning Department. Subsidence and Landslide Potential Map 111-1, Safety Element. Oroville, CA CH2M Hill, 1977. 4. Butte County Planning Department. Erosion Potential Map 111-2, Safety Element. Oroville, CA: CH2M Hill, 1977. 5. Butte County Planning Department. Expansive Soils Map 111-3, Safety Element. Oroville, CA: CH2M Hill, 1977. 6. Butte County Planning Department. Noise Element Map IV -1, Scenic Highway Element. Oroville, CA: CH2M Hill, 1977. 7. Butte County Planning Department. Scenic Highways Map V-1, Scenic Highway Element. Oroville, CA: C142M Hill, 1977. 8. Butte County Planning Department. Natural Fire Hazard Classes Map 111-4, Safety Element. Oroville, CA: CH2M Hill, 1977. 9. Butte County Planning Department. Archaeological Sensitivity Map. Oroville, CA: James P. Manning, 1983. 10. Butte County Planning Department. School District Map. Oroville, CA. 11. Butte County Board of Supervisors. Agricultural Preserves Map, established by Resolution No. 67-178. Oroville, CA: Butte County Planning Department, 1987. 11. National Flood Insurance Program. Flood Insurance Rate Maps. Federal Emergency Management Agency. 1989. ■ Butte County Department of Development Services ■ Planning Division ■ 31 Project: Paradise Evangelical Free Church, UP 01-15 13. USGS Quad Maps. 14. Soil Map, Chico (1925)/Oroville 1926) Area. United States Department of Agriculture. 15. Soil Survey of Chico G925)/Oroville 0926) Area. United States Department of Agriculture. 16. Butte County Planning Department. Butte County Fire Protection Jurisdictions and Facilities Map. Butte County Fire Department and California Department of Forestry, 1989.. . lu K:\PROJECTS\UPC\EVANGEL\EVANGEL.IS ■ Butte County Department of Development Services ■ Planning Division ■ 32 VP 't�"1'0 o It was moved by Commissioner Vercruae, seconded by Commissioner Lambert and unanimously carried as'followe: A. Find that the requirements of CEQA have been completed and considered and adopt a Negative Declarations and B. Find that the project complies with Butte County Code Sections 24-35, -43, -94 and -113, specifically that the proposed church will not impair the integrity and character of the AR -MH -1 and H -C zones and that the use would not be unreasonably incompatible with or injurious to surrounding properties or detrimental to the health and general welfare of (.he persons residing or working in the neighborhood or to the general health, welfare and safety of the County; and C. Approve the proposed Use Permit to allow a 7250 sq. ft. church on AP 55-29-21 (Paradise Evangelical Free Church) subject to the following conditions: 1. Obtain encroachment permits from Public Works. 2. Install a standard 5-18 public road approach at each access point to the property. 3. Submit estimate of traffic generation and turning movements prepared by registered engineer to Public Works for review and comments. 4. Provide a permanent solution for drainage. Submit construction and drainage plans to Department of Public Works for approval and install the required facilities. 5. Prior to issuance of building permits, the BLM on AP 55-29-21 approved 11/24/80 shall be finalized as conditioned. 6. Meet the requirements of CDF, including but not limited to Installation of one fire hydrant. 7. Provide sewage disposal under permit and inspection by Butte County Environmental 11f.-alth. 8. All excavated soils to be deposited as noted on the site plan, terraced and planted with ground cover to minimize erosion. 9. Submit grading plan to Public Works for approval. 10. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. ay. 0. HE Al min- ,.qr";-, i�_+ISTA. t / ��}„ r'�r. �� \! `9w 5 \ X, h • � y '..I'.'.• r :/.h I )f.it.: j � .i'.\5 ir. `. ,y' r 1� ���'!�� � L I s .rl ��, '�?�, ��.ri `�+.�,Tj, r7�,{Y it 1?:y ' xi <, •�I 5C` rT "59 ,�,�a it rs f J �✓' �i r�i;��♦ ,� ri r �`I ��Ai ��c. 15 wk - I :f ? t, {N t t 1 • i r i :.err `er Butte County Depart Ant of Public Worksoo�U�177 7 County Center Drive, Oro, CA 95965 (530)538-7681 0 O o Y DETERMINATION OF GRADING PERMIT EXEMPTION ��' :y' According to Sec. 13-5.1 of the Butte County Code, any person who has not obtained a grading permit pursuant to Article I Chapter 13 - Grading, of the Butte County Code but is proposing to perform grading of any of the following types shall first obtain a determination of exemption . 1) PLEASE COMPLETE THE FOLLOWING INFORMATION 2) ATTACH LOCATION MAP AND PLOT PLAN DETAILING PROPOSED GRADING ACTIVITY Property Owner: Home Address: Address of Grading: Phone Number: Maximum depth of excavations and fills: Maximum slope of area to be graded: Volume of excavations and fills: Purpose of the grading: Nature of land use proposed in connection with the grading: AP# of Grading Property: Type of exemption claimed pursuant to Sec. 13-5 "Exemptions": (Please check box that applies) ❑ Excavation and grading authorized by a valid building permit as provided for under chapter 70 of the appendix of the Uniform Building Code, as adopted by section 26-1 of chapter 26 of the Butte County Code. ❑ An excavation that does not exceed (10) feet in vertical depth at its deepest point, measured from the original ground surface, or one thousand (1,000) cubic yards on any one (1) lot or parcel or real property. ❑ Fill on a slope of twenty (20) percent or flatter that does not exceed ten (10) feet in vertical height at its highest point, measurers from the original ground surface, or one thousand (1,000) cubic yards on any one (1.) lot or parcel of real property. - ❑ Exploratory excavations which do not exceed one thousand (1,000) cubic yards at any one (1) site. ❑ Construction of roads for forestry or fire protection purposes, as required by a governmental fire protection agency. ❑ Excavations for: Cemetery graves, tunnels, wells, mining, quarrying, under grounding of utilities, public works projects, archaeological sites, or dams and public refuse disposal sites, controlled by other regulatory agencies. ❑ Emergency projects due to landslides, road and bridge washouts, flooding or other natural disasters. ❑ Routine maintenance of roads or manmade or engineered flood control channels and levees. ❑ Grading, specifically authorized by the terms of any discretionary permit or approval granted by the County of Butte. ❑ Other — explain on additional sheet of paper I certify the above information to be true and correct ❑ APPROVED ❑ DENIED Property Owner Signature FOR OFFICE USE ONLY (Date) (Authorizing Signature -Director of Public Works; 0 CHAPTER 13 GRADING AND MINING• Art. I. Grading, §§ 13-1-13.100 Art. II. Surface Mining and Reclamation, §$ 13.101-13-116 ARTICLE I. GRADING Sec. 13-1. Purpose. The Grading Zone is an area including unique resources. It is noted for its scenic natural beauty, for its streams, creeks, and vernal pools, for. its diversity of vegetation including rare and endangered plant species, for its fish and other wildlife, and for its sources of water. All of the said resources are subject to serious damage by improper and uncontrolled grading, including, but not limited to, erosion and siltation jeopardizing or destroying fish and other .wildlife and the disruption or contamination of sources of water being used for domestic and other purposes. The purpose ' of this article is the control of erosion and silt- ation, the enhancement of slope stability, the protection of said resources and the prevention of related environmental damage by establishing standards and requiring permits for grading. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) *Editor's note—Ord. No. 1827, § 1, enacted May 24, 1977, repealed former ch. 13, §§ 13-1-13-17, and enacted a new ch. 13 to read as herein set out in art. II, §§ 13-101=13-116. Prior to enactment of Ord. No. 1827, former ch. 13, H 13.1-13-17, pertained to similar subject matter and was derived from Code 1952, § 99. Subsequently, § 1 of Ord. No. 2680, adopted Apr. 26, 1988, changed the title of the chapter from "Mining and Dredging" to "Grading and Mining." Cross references—Groundwater conservation, ch. 33; implementation of this chapter, § 41-1. 155 1Supp. No. 9.93 • • § 13-2 BUTTE COUNTY CODE § 13.4 Sec. 13-2. Definitions. For the purpose of this article, the following words and phrases shall have the meanings respectively ascribed to them by this section: Channel• A natural stream that conveys water; a ditch or chan- nel excavated for the flow of water. Director: The director of the department of public works or his duly authorized designee. Drainage: The removal of excess surface water or groundwater from land by means of surface or subsurface drains. . . Erosion: The wearing away of the land surface by water or wind. Grading: Any earth movement, including excavation and fill- ing, or any combination thereof. = Grading Zone: That area *of the, County of Butte which lies east of Highway 70 from the southern boundary of the county north to the intersection of Highway 70 and Highway 149, east of High- wad+ 149 from said intersection north to the intersection of High- way 149 and Highway 99, and east of Highway 99 from said intersection north to the northern boundary of the county, and which is at an elevation of three hundred (300) or more feet above mean sea level. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-3. Permit required. Except as otherwise provided herein, it shall be unlawful for any person to commence or perform any grading in the Grading Zone without first having obtained and complied with the condi- tions and requirements of a grading permit. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Cross reference—Penalty for violation of this section, § 1.7(b). Sec. 13-4. Effect of pending project application. A grading permit shall not be approved for a project which requires a zoning change, subdivision, parcel map or use permit prior to the final approval of said zoning change, subdivision, 156 Supp. No. 9-93 1 13.5 GRADING AND MINING § 13.6 parcel map or use permit. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-5. Exemptions. A grading permit shall not be required if the work meets any of the conditions specified below: (a) Excavation and grading authorized by a valid building _permit as provided for under chapter 70 of the appendix of the Uniform Building Code, as adopted by section 26-1 of chapter 26 of this Code. (b) An excavation that does not exceed ten (10) feet in vertical depth at its deepest point, measured from the ori ginal ,,.. ground surface, or one thousand (1,000) cubic yards on any' one (1) lot or parcel of real property. ' (c) Fill on a slope of twenty (20) percent or flatter that does not exceed ten (10) feet in vertical height at it highest point, measured from the original ground surface, or ane thousand (1,000) cubic yards on any one (1) lot or parcel of real property. (d) Exploratory excavations which do not exceed one thousand (1,000) cubic yards at any one (1) site. (e) Construction of roads for forestry or fire protection pur- poses, as required by a governmental fire protection agency. (f) Excavations for: cemetery graves, tunnels, wells, mining, quarrying, undergrounding of utilities, public works pro- jects, archaeological sites, or dams and public refuse dis- posal sites, controlled by other regulatory agencies. (g) Emergency projects due to landslides, road and bridge wash- outs, flooding or other natural disasters. (h) Routine maintenance of roads or manmade or engineered flood control channels and levees. (i) Grading, specifically authorized by the terms of any dis- cretionary permit or approval granted by the County of Butte. (Ord. No. 2680, § 2, 4.26-88; Ord. No. 2738, § 1, 3-7-89; Ord. No. 2954, § 1, 9-24-91) 156.1 Supp. No. 9-91 • § 13-5.1 BUTTE COUNTY CODE $ 13-5.1 Sec. 13.5.1. Determination of exemption. (a) Any person who has not obtained a grading permit pur- suant to this article but is proposing to perform grading of any of the following types shall first obtain a determination of exemp- tion as specked in subsection (b) below: (1) An excavation exceeding ten (10) feet in- vertical depth at its deepest point, measured from the original ground sur- face, or exceeding one thousand (1;000) cubic yards on any one (1) lot or parcel of real property (2) Fill on a slope exceeding twenty (20) percent and exceeding ten (10) feet in vertical height at its highest point, mea- sured from the original ground surface, or one thousand (1,000) cubic yards on any one (1) lot or parcel of real prop- erty. (b) Any person proposing to do grading of a type described in Subsection (a) above shall apply to the director for a determiiia- tion whether such work is exempt pursuant to section 13-5 or whether a grading permit is required pursuant to this article. The application for determination of exemption shall describe the grading which is proposed in the following information: Maximum depth of excavations and fills, maximum slope. of area . to be graded, volume of excavations and fills, purpose of the grading, nature of land use proposed in connection with the grading and type of exemption claimed pursuant to section 13-5. The application for determination. shall be made on a form ap- proved by the director, shall identify the property by assessor parcel number and street address, and shall be accompanied by a location map and plot plan. Upon receipt of the completed appli- cation the director shall review it and may make a site inspection and request any additional information necessary to determine whether or not the proposed grading is exempt. The director shall, within ten (10) days from his receipt of all information reasonably necessary, make his determination and mail notification thereof to the applicant stating whether the proposed grading is exempt or a grading permit is required. (c) It shall be unlawful for any person to commence grading of a type described in subsection (a) unless and until he or she has 156.2 Supp. No. 9-91 • § 13-6 GRADING AND MINING 113-6 obtained a notification of exemption from the director or a grading permit, pursuant to this article. (Ord. No. 2954, $ �2, 9-24-91) Sec. 13-6. Permit application. (a) Application for Permit: Each application for a permit that is. required by this article shall be made by the property owner or his authorized agent` to the director on a form furnished for that purpose and shall be accompanied by,a permit application fee of two hundred thirty-three dollars ($233.00). Provided howeve` that if a detailed engineering plan and specifications, soils engi- neering report and erosion and sediment control plan are re-' quired pursuant to subsection W10) below, the application fee shall be six hundred thirty-three dollars ($633.00). The application shall also be accompanied by an application for environmental review and the fees which are required by the Butte County Environmental Review Guidelines. (b) Application Content An application for a permit shall in- clude the following information: (1) An accurate location map showing the relation of the project to the nearby community. (2) An accurate plot plan showing the exterior boundaries of the area affected, the location of any buildings. (3) A description of the work to be done together with the materials to be used thereon, including depth of fills, height of cuts, proposed spoils location for any excess excavation, and estimated volumes in cubic yards of excavation and fill. (4) The location of all drainage to and from the site and the location of culverts and natural watercourses. (5) A relocation plan for existing waterway or drainage facili- ties proposed to be altered. (6) Details of proposed drainage structures. (7) A description of the methods to be used to control erosion. (8) The locations of anticipated stockpile areas. II 156.2.1 Supp. No. 9.91 4 13-7 GRADING AND MINING 13.8 (9) Other pertinent information, as requested by the director. (10) When the total excavation plus the total fill exceeds ten thousand (10,000) cubic yards, a detailed engineering plan and specifications, soils engineering report, and erosion and sediment control plan, prepared and signed by a li- censed civil engineer, will be submitted pertaining to ap- plications involving one (1) or more of the following: (i) Cuts or fills exceeding. (15) feet in height. (ii) Existing average slopes exceeding twenty (20) percent. (iii) . Mean annual rainfall exceeding fifty (50) inches, as determined .by the National Weather Service. (Ord. :4 No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-7. Environmental review. Permit applications shall be referred to the planning depart- ment for review pursuant to the Butte County Environmental Review Guidelines and the California Environmental Quality Act. 1 (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-8. Engineering plans and specifications. Engineering plans and specifications, when required pursuant to section 13-6(bX10), shall be drawn to scale upon reproducible paper or mylar and shall be of sufficient clarity to indicate the nature and extent of the work proposed and show in detail that it will conform to the provisions of this article and all relevant laws, ordinances, rules and regulations. The first sheet of each set of plans shall give the location of the work and the name and address of the owner and the person by whom they were pre- pared. The plans shall include the following information: (1) General vicinity of the proposed site. (2) Property limits and accurate contours of existing ground and details of terrain and area drainage. (3) Limiting dimensions, elevations or finish contours to be achieved by the grading, and proposed drainage channels and related construction. (4) Detailed plans and/or specifications of all surface and sub- surface drainage devices, walls, cribbing, dams and other 156.3 Supp. No. 3-89 r § 13-9 BUTTE COUNTY CODE 113-10 protective devices to be constructed with, or as a part of, the proposed work, together with a map showing the drain- age area and the calculated runoff of the area served by any drains. . (5) Location of buildings or structures on the property where the work is to be performed and the location of buildings or structures on land of adjacent owners which are within fifteen (15) feet of the property and which may be affected by the proposed grading. (6) A detailed list of the materials to be incorporated in the work and quantities of each item, including, but not lim- ited to, earth work, pipe lengths and concrete. (7) Other pertinent information as requested by the director. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-9. Soils engineering report. The soils engineering report, when required pursuant to sec- tion 13-6(bX10), shall include data regarding the nature, distribu- tion and strength of existing soils, conclusions and recommenda- tions for grading procedures and design criteria for corrective mea- sures, when necessary, and recommendations covering adequacy of sites to be developed by the proposed grading. Recommenda- tions included in the report shall be incorporated in the grading plans or specifications, which shall be subject to review and ap- proval by the director. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-10. Erosion and sediment control plan. The erosion and sediment. control plan, when required pursu- ant to section 13-6(bX10), shall conform to the standards of this article and shall contain measures to be incorporated into the proposed work. The plan shall contain a description of temporary and permanent measures for: (1) Protection of native and naturalized vegetation. (2) Minimizing disturbance or removal of vegetation. (3) Revegetation of disturbed areas. 156.4 Supp. No. 3-89 IRS 0 $ 13-11 GRADING AND MINING 013- . 11 (4) Drainageway protection. (5) Sediment detention. (6) Fill slope protection. (7) Cut slope protection. (8) Disposal of spoil material. (9) Protection of stockpile material. (10) Dust control. (11) Other pertinent, information as requested by the director. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-11. Standards. (a) General: When a permit is required pursuant to this article, the grading plan and erosion control. plan applicable to the project shall conform to the standards set forth herein. �. (b) Sediment ControL• . (1) Sediment caused by the grading project shall be retained on the site to the greatest extent feasible. The rate of erosion after completion of the project should not exceed the natural erosion rate which occurred prior to the grad- ing project. If erosion exceeds the natural rate, erosion and sediment control measures shall be immediately implemented to reduce erosion to allowable levels. (2) Where practical and feasible, sediment basins, sediment traps, or similar sediment control measures, temporary or permanent, shall be installed prior to grading operations. Upon completion of construction and stabilization of soils, all temporary erosion control facilities shall be removed from the site. (c) Native Vegetation: (1) Native vegetation shall be retained and protected, wher- ever possible, unless removal is required for public health and safety. (2) When vegetation must be removed, the method shall be one that will minimize the erosive effects from the removal. 156.5 Supp. No. 3.89 0 • 13.11 BUTTE COUNTY CODE ' 4 13-11 (3) Exposure of soil to erosion by removing vegetation shall be limited to the area required for immediate construction operations. (d) Grading Practices and Setbacks: (1) Grading operations. shall be conducted so as to control sediment production and dust on the project site and other properties. ....(2) The setbacks specified by "this section are minimum re- quirements and maybe increased by the director or by the recommendation of a civil engineer, soils engineer or .en- gineering geologist, if necessary for safety and stability, or to prevent damage to other properties from deposition or erosion, or provide access_ for slope, maintenance and drainage. Re- taining walls and/or deep foundations may be used to reduce the required setbacks when approved by the director. (3) The required setbacks areas follows: Slope_ Height : Setback From Top of Cut (1-1) in Feet or Toe of Filo in Feet H. . , Setbacks 0-10 5 10-30..IV2 Over 30 . . 15 Increased setback may be required if interceptor drains are necessary. (e) Control of Runoff. (1) Each plan which makes changes in surface water drainage shall be required to: . a. Make provision to handle upstream off-site runoff through the project site, based on projected storm runoff from the watershed. b. Provide and install, at the owner's expense, pertinent drainage, erosion and sediment control structures. c. Retain sediment being transported by runoff water on site through the use of sediment basins, silt traps, or similar control structures. 156.6 Supp. No. 3.89 L • 0 GRADING AND MINING § 13-11 (2) Release of concentrated surface water runoff shall only be directed into existing drainage facilities, swales or water- courses, at velocities which will not cause the natural ero- sion rate to be exceeded. (f) Slope Construction: (1) Slopes shall not be steeper than one-to-one (1:1) for cuts and one and one -half -to -one (1%:1) for fills, unless a steeper slope is determined suitable by geological and soils engi- neering analysis. Erosion control measures shall be included in the plans and specifications. (2) Slopes shall not be constructed so as to endanger or disturb adjoining property. (g) Reuegetation and Slope Surface Stabilization: (1) Mulching, seeding, the planting of shrubs and trees, or other suitable stabilization measures shall be used to pro- tect exposed slopes as necessary to control erosion, sedi- mentation and slope stability. Preference shall be given to using native or locally adapted grasses, shrubs and woody vegetation. (2) Earth or paved interceptors and diversions shall be in- stalled at the top of cut or fill slopes where there is a potential for erosive surface runoff. (3) Revegetation shall be maintained by the owner until per- manent establishment is achieved. (h) Grading. (1) All land within a development site shall be graded to drain and dispose of surface water without ponding, except as otherwise provided herein. (2) Where drainage swales are used to divert surface waters, they shall be vegetated or protected, as required. (i) Protection of Watercourse: (1) Fills shall not block or change natural watercourses or constructed channels. 156.7 Supp. No. 3-89 3 13-11 1 BUTTE COUNTY CODE 113-11 (2) Excavated materials shall not be deposited or stockpiled in or alongside the streams, lakes or watercourses where the materials may be washed away by high water or storm runoff. 0) Disposal of Cleared Vegetation; Vegetation removed during clearing operations shall be disposed of by one (1) or more of the following methods: (1) Chipping all or some of the cleared vegetation for use as mulch or compost on the site. (2) Burning all or some of the cleared vegetation. Material to be burned shall be piled in a manner and in such locations as will cause the least fire risk and least damage to adja- cent trees. Burning shall be thorough,'so that the materi- als are reduced to ashes. No logs, branches or large charred pieces shall be permitted to remain. Burning shall comply with Butte County Air Pollution Control District and local fire department or district regulations. (3) Disposing of the balance -of the material in a manner and at a location approved by the director. (k) Excavated and Fill Materials. Excavated material removed during grading operations and imported fill material shall be handled in accordance with the following methods: (1) Stockpiling sufficient topsoil on the site if necessary for use on areas to be.revegetated. (2) Locating stockpiled soil so that it will not become a source for off-site sediment damage. (3) Promptly backfilling and compacting stockpiled soil into trenches and pits to reduce the risk of erosion. (4) Applying mulch or other protective coverings on stockpiled material which will be exposed through the winter season. (5) Excavated material not to be used at the site shall be disposed of in a manner and at a location approved by the director. (6) Excavated material and imported material placed in per- manent fill shall be compacted in accordance with section 156.8 Supp. No. 3-89 C • 0 § 13.12 GRADING AND MINING § 13-15 19 of the State of California Department oflransportation Standard Specifications dated January 1988. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-12. Bonding. The director shall recommend financial assurances in such form and amounts as may be deemed necessary to assure that the permitted work, if not completed in accordance with the approved plans and specifications, will be corrected to eliminate hazardous :.. conditions or to mitigate environmental impact. (Ord. No. 2680, $ _ . 2, 4-26-88; Ord. No. 2738, $ 1, 377-89) Sec. 13-13. Director's report. Upon receipt of a complete application for a grading permit by the director, completion of an environmental review pursuant to section 13-7, and the director's consideration thereof, the director shall submit a report including his recommendations to the plan- ning commission together with a request that the matter be set for hearing by the planning commission. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-14. Hearing. Upon receipt of the director's report, the planning commission shall, in the same manner as provided for in section 24-46 of chapter 24 of this Code, schedule a public hearing to be held within forty-five (45) days. The planning commission, on the basis of evidence submitted at the hearing, may approve or deny the permit. The determination of the planning commission shall be final unless a written appeal is filed in the same manner as provided in section 24-48 Qf chapter 24 of this Code. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-15. Inspection. The director shall conduct such inspections as are deemed nec- essary to ensure compliance with the approved plans and specifi- cations and conditions of the permit. The director shall have the right of entry upon the project premises to conduct such inspec- 156.9 Supp. No. 3.89 § 13-16 BUTTE COUNTY CODE 613-100 tions and to clear out or open up the obstruction of any drainage facility deemed contrary to the provisions of the permit or this article. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Sec. 13-16. Violations. (a) Revocation of Permit: Whenever any alleged violation of the terms of a grading permit is brought to the attention of the director, he shall, after determining that a violation does exist, either give the permittee a written notice to comply within five (5) days, or, where continuation of the violation may adversely affect the public health, safety or welfare, give the permittee... written notice of suspension of the permit and operations there under. Said notices shall be personally served or sent by regis- tered mail, return receipt requested, and shall be effective on the date of the personal service or mailing thereof. If the permittee does not comply with such a notice to comply within the five-day period, or if the permittee has been given a notice of suspension, the director shall request the question of the revocation of the. grading permit to be placed on the agenda of the next regular planning commission meeting. Any grading permit may be re- voked or modified by the planning commission in the same man- ner as specified for use permits in section 24-62 of this Code. (b) Public Nuisance: Any grading in violation of the terms of this article or any permit issued hereunder is hereby declared to be a public nuisance and may be abated in the manner pro- vided by law. (c) Remedies Cumulative: The remedies provided in this article are cumulative and not exclusive. Nothing in this article bars any legal, equitable, administrative or summary remedy to which any aggrieved public agency, person, firm, corporation or part- nership may otherwise be entitled. (Ord. No. 2680, § 2, 4-26-88; Ord. No. 2738, § 1, 3-7-89) Secs. 13-17-13-100. Reserved. 156.10 Supp. No. 3-89 Richard & Shirley Dunkel 5145 Pentz Rd. Paradise, CA 95969 530-872-2323 May 21, 2001 To Butte County Board of Supervisors RE: Use Permit Appeal- Paradise Evangelical Free Church At our first meeting with Pastor Jacobson regarding the playground area, he explained that the church intended to make a baseball and athletic field and nothing else. Then after receiving a notice from the Planning Commission we found out that the church group is requesting restrooms, gymnasium etc. This came as a complete surprise to us. The church did not come to us or invite us to a meeting regarding this project at any time. We. have owned our property for 11 years and we co-operated with them on any requests or concerns regarding any problems, such as bushes were heavy on our property that interfered with their members exiting on to Pentz Rd. We removed the brush as soon as we could so that there would not be any problems or hazards for cars entering onto Pentz Road. We purchased.our property in 1989 and for the next 5 or 6 years we had problems with children using our property as shortcuts on foot and bikes and using our area for skateboard jumping. At this time there was a basketball area next to the church. The church co-operated finally to stop this. problem so that the kids wouldn't get hurt. This was our big concern. Up to 1996 the church parking lot was always full and we allowed people to park on our property so that they could attend services. Since that time (1996) we have not had any cars use our property and we noticed that there is always plenty of room to park at the church. On May 20, 2001, I counted 21 cars at 9 AM -Sunday School, and 45 cars at their regular Service. In this period from 1996 to present we have had a decline of children in our area. They have either moved on or have grown up to young adults. Our questions are: 1. How many children were in the congregation in 1991 and how many in 2001 and what age group are they? 2. What was the church membership in 1991 and now in 2001? Numbers should be examined to see if this addition is really needed. 3. Leveling the field next to our adjacent property will make a drop off of 10 to 12 feet. This will be needed to make field level with lowest part. 'r. 4. The winter rains will cause erosion of the property around this area and possibly cause problems in the future. 5. The leveling of this field, as they anticipate, will cause water to be collected and create standing pools. This will breed mosquitoes and.we already have this problem and we don't need more of this in our area. 6. The 6000 square foot gymnasium by far exceeds the need of our neighborhood at this time and in the future. 7. Outside restrooms will bring more undesirable people to use the facilities. We did have this problem but put controls on who uses the restroom, especially after closing hours. 8. We are concerned about children and adults using our personal section of our property (our home is behind the store) for shortcuts to the store. We have a convenience and bait and tackle store that is open 7 days a week. 9. We feel that there is more to this project than meets the eye because the church Board of Directors has never come directly to us with this project. We are the largest property owner next to the church. 10. How can the church support this large 5 year project by itself by making this a private field and that the public is not allowed to use or even rent. This .is not what a church should be. ---- private! 11. In regards to water, a recreation field and gymnasium will use large amounts of water for restrooms, showers and in making the baseball field and soccer field that need grass. We are already in a water shortage year and this project will use large amounts to maintain causing a more probable water shortage to our community. 12. It will decrease property value in this area. Three real estate agents were quizzed about this project and 2 out of 3 said our property value would drop due to limited prospective buyers interested in buying property next to a large recreation field used by youngsters or young adults. We do sell beer and wine at the store for the past 30 plus years. This could cause a problem to sell the store and license for the same; having a possible major adverse affect on our retirement if license cannot be sold or transferred. Now for a'personal viewpoint: In the eleven years of our ownership, and as a member of the Lime Saddle Community, not one person has invited us to their church services or to any social activity or supported out business except for a couple bags of ice. We feel that this project is not beneficial to our community, our business or our lifestyle. We purchased this property to live in a semi -rural area. S' cerely. J 6 - TO: BUTTE COUNTY BOARD OF SUPERVISORS FROM: BETH KNAPPENBERGER/4964 MALIBU DR./PARADISE RE: Appeal of Use Permit for Paradise Evangelical Free Church 1. Under page 3, paragraph 2 of the Agenda Report from April 26, 2001, "the athletic field will be used for games held by the church congregation and for church league games." Does this include church softball leagues of any denomination? Will Paradise Evangelical Free Church (PEFC) be playing any type of league other than church leagues? Will any of the leagues (church or otherwise) be coming from out of the area, such as Oroville, Chico, Orland, Yuba City, etc.? 2. When first approached by Rev. Jacobsen, surrounding neighbors were led to believe by him that this project was to be a "playground for the kids." Many neighbors were stunned to hear of the actual plans - a baseball and soccer field with restroom facilities, as well as a 6000 square foot gymnasium. We have seen the plans for the baseball field and the gym, but where is the soccer field going to be located? 3. Rev. Jacobsen told us that the "playground" was for church "kids." At the April 26th meeting we heard otherwise. The Reverend and a PEFC board member stated that the new facilities were going to be for, "kids, young kids, or adults." The age of these league players is very broad. Will this facility be for children only? And if so, children to what age? 4. On page 4 of the Agenda Report (#3, last paragraph) it states, "Conditions of the project prohibit the use of night time lighting of the athletic field and the use of public address systems." Is it possible to amend that statement and add, "the use of gny public address sytem - permanent or temporary." ? 5. Page 5, #6, paragraph 4 of Agenda Report regards the impact to wildlife. It says, "several pines trees may have to be removed." How many trees will be removed, and which ones? 6. Page 5, #6, paragraph 5 says that, "resident deer are located in the area and may frequent the site." Will the baseball field be fertilized by something non-toxic to area wildlife? 7. Under the "Actions For Consideration" on page 6, "staff recommends that the Board of Supervisors... I.) Deny the appeal by the nearby landowners based upon the following finding: A: Conditions of project approval will ensure that the project does not create any significant impacts to the neighborhood." If this project were what Rev. Jacobsen had originally stated to the surrounding neighborhood, there most certainly would be no "significant impact." But do the church board members, and the Butte County Board of Supervisors really believe that there will be no impact to us? How would any of you/them feel if this were happening literally in your backyard? 8. Page 8, article A, paragraph 1 states, "The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to surrounding property." Also in Article A, #4, it says "the project will not create significant aesthetic impact because the proposed improvements will not be easily seen from a public road." The closest neighbors to the project are very concerned about lowered property value, nearby wildlife, and the destruction of the surrounding views. 9. The R.V. Park directly across from the church on Pentz Road has had major noise levels, especially on weekend nights. Screaming and yelling and general partying noise can be heard at least up to Malibu Drive. Will the restrooms the church proposes be locked every day after dark? Will there be security of some kind, or will the police patrol the area at night on a regular basis? What happens if vandalism or other criminal activities do begin occurring? I am extremely concerned to see that the Planning Commision cares nothing for the concerns of homeowners, and only for development. • Can the approval of the permit be postponed until the questions of those concerned be ironed out to everyone's satisfaction, and not just the church? Thank you for your consideration in this matter. Sincerely, Beth Knappenberger 4964 Malibu Dr. Paradise, CA 95969 u Good morning Mr. Chairman and Board of Supervisors. This project is an appeal of a Planning Commission approval of a Use Permit for the Paradise Evangelical Free Church to allow an athletic field, a 500 square'foot restroom located adjacent to the athletic field, and a 6,000 square foot gymnasium. The gymnasium will also serve as Sunday school rooms. On April 26, 2001, the Planning Commission held a public hearing on this Use Permit. Several people spoke in opposition to the project, stating that the project would create significant amounts of noise and vehicle traffic, cause criminal activity, cause baseballs to land in the adjacent properties, and interfere with wildlife movements. The Planning Commission voted 5-0 to approve the project.' rojec .' The Commission added a condition prohibiting the use of public address systems and limiting activity on the athletic field to daylight hours (Condition # 6). The agenda report and the minutes of the April 26 Planning Commission hearing on the project were included in the Board packet for this appeal hearing. Two appeals have f iled on this project. The first appeal is by a nearby landowner, who spoke in opposition to the project at the Planning Commission hearing. At the Commission hearing, she submitted documents protesting approval of the Use Permit. A petition signed by landowners in the area who opposed the project was cilso submitted., at that time. A copy of her appeal letter and copies of the documents she submitted to the Commission were included in fhe Board packet. The second appeal was f iled by the church's pastor. He objects to . Public Work's Condition # 9, which requires the applicant to either install left turn pockets on Pentz Road at Safari Lane, or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the analysis showed that the project would not cause an impact to vehicle circulation, installation of the Left turn pockets would not be required. Conversely, if the analysis showed that left tern' pockets or other road improvements were necessary-, the applicant would be required to construct them. The project applicant states in his appeal letter that the Public Works Department had not done an analysis of the impact that the project wwould have on traffic flow and .that the Public Works Department has not submitted any data to show that the left turn pockets are necessary. According to the applicant, 99% of the traff is generated by people using the proposed facilities will come from the north of the site -and make a right turn onto Safari Lane. The left turn pockets would not be necessary because vehicle traffic generated: by the project would not use them. Due to the appeal, the Public Works Department re -reviewed Condition # 9 and determined that the condition provides the greatest flexibility for the church to either install the left turn pockets or provide an Engineer's report and install the necessary facilities. The Public Works Department noted that because the details of .the traffic patterns in the area have not been throughly investigated, the only other alternative they would recommend would be a focused Environmental Impact Report that addresses traff is impacts. A copy of the Public Works memorandum was included in the Board packet- Staff recommends that the Board deny both' appeals and approve the Use Permit with the findings and conditions as approved by the,Planning Commission. Alternate actions for upholding the appeal by the applicant, which would remove the Public Works condition requiring the installation of left turn pockets or the analysis, have been prepared. Upholding the appeal by the applicant would need.to include an action denying the appeal by Beth and Jo Ann Knappenberger. This was inadvertently left out of the alternate action. This concludes my presentation. I can answer any questions you may have. Thank you. s' ��trafrap� Rowan jVv� � To: Butte County Board of Supervisors and Planning Commission From: Concerning citizens in and around Unique Acres, Paradise, CA Re: Evangelical Free Church of Paradise, 5095 Pentz Road Proposal for building and usage of church property Date: April 25, 2001 The residents who do live in the affected area have spent a -eat deal of research, time, effort and money to build or buy their homes and live in a unique setting. They do not want their quality of life jeopardized in any way. Apparently, none of the members of the church's congregation live in Unique Acres, and their standard of living is not suffering a questionable fate. Until this time, the Evangelical Free Church of Paradise has seemed to be mostly a "good neighbor." However, this plan is not at all neighborly. What the church proposes is not conducive to the quality of homes in the area. It is not conducive to value of the homes. It is not conducive to the peaceful,. safe setting for people or wildlife. It is not conducive to the natural setting. It is not conducive to the reasons that residents chose this area in which to live. Had anyone known of the church's expansion plans, many would not have chosen this area. In fact, several are already considering the possibility of moving away. This also impacts Butte County, too, in the terms of income. If the properties are de -valued by the proposed building and the subsequent activities, then future tax revenues could be diminished considerably. Since the project seems to be so .much greater than the original verbal proposal, it might be best to reject the plan entirely and let the church review its goals and find a more spiritual way to attract new members. Another idea would be table the proposal until a survey could be sent to the entire southern portion of Paradise, since the noise would reach much farther than originally imaged. The traffic problem would extend an even greater distance. A study should also include numbers -of users of the proposed facilities and what impact that would have. The police, fire, and emergency aid providers, as well as the hospital and immediate care facilities need to be surveyed as to how capable they are to handle additional injuries. Of course, the time it takes to_accomplish this research gives Unique Acres more time to organize an even larger opposition to any new proposal, which the residents seem fully prepared to do. 'It also is not pleasant to consider the cost to the county to accomplish this task. • Memo to Butte County officials, page 2 The people listed below have voiced concerns about the proposal to build what amounts to a "sports complex." In addition to the names and signatures attached, there are an even greater number (see tally sheet), that were contacted and signatures could not be obtained in time. There were also a number of people who could not even be contacted in time. Some concerned residents had previous engagements or work that kept them from being in attendance at the hearing. We ask that you decide in favor of your'tax paying citizens and do not allow this misguided use of an area so close to a special and unique residential area. Thank you for your consideration in this matter. HISTORY REGARDING PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD February, 2001 Reverend Igmar Jacobsen contacted several homes and businesses adjacent and/or near the church property, stating the hope to build a playground for the congregation and lower Paradise community children on presently unused church property. Rev. Jacobsen gave the impression "a playground" would be something like a sandlot, jungle gym, and play equipment. It sounded like a simple project involving a minimum amount of inconvenience during construction to grade the ground and install equipment. It seemed that the natural setting around the area would not be disturbed. He made it seem as if there would be'a relatively small amount of noise when the project was completed. Each person who listened to his proposal. felt that this project would be for the benefit ofoY ung children accompanied and supervised by adults. March Notice of Public Hearing was sent from Butte County. The summary sheet did not resemble the above-mentioned conversation with Rev. Jacobsen at all: The present plan is far larger, more extensive, and is questionable as to how many age groups itis meant to service (Le., grade school youth, teenagers, college/young adults, and/or adult teams). It creates a much more adverse impact in any of its forms than the originally mentioned playground. April 21 - 23 Charles (Karoly) Kasza, the developer of Unique Acres, approached, Several neighbors most directly affected by the church's proposal with a map of the project. April 24 — 25 Neighbors in Unique Acres and several along Pentz Road contacted, each other, made plans to send letters of protest and/or attend the hearing, gather data, and list concerns and reasonable objections to present at the hearing. Only one business owner of an RV park across the street from the church apparently had no objections, thinking more people in the area might increase his income and has sent a letter of approval. History of Proposed Usage of Property at 5095 Pentz Road, page 2 Some residents were unavailable for comment (see attached tally). Several residents diligently tried to consider possible adjustments n the plan. Three of those residents have a letter to submit to the hearing (see letter from Dale & Judy Simpson and Minnie Coolidge". However, .in contacting nearly 75% of the residents in Unique Acre3 and several on either side of the church on Pentz Road, it is the general consensus that the plan is not conducive to the area's lifestyle and should be rejected by Butte County officials (see list of concerns and objections).. CONCERNS AND OBJECTIONS TO PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD 1. It is not a simple playground for neighborhood children, as originally stated to several people by the minister*. 2. Instead it includes a gymnasium, public restrooms, soccer field, and baseball ball field, presumably for the use of the congregation and its affiliates. 3: The ball field plan shows that it would come within 10 feet of several homes which is far too close for these types of activities and the ensuing noise levels. 4.. Even though the visiting teams for these sports might be church -affiliated, not always does every participant care about the church teachings. They are often more intent on the activity of the sport. A few of these people (or their drivers) could target our area for a variety of crimes. 5. These facilities would certainly attract more vehicles, people and noise, greatly. reducing the serenity the properties in Unique Acres and along Pentz Road, which is unacceptable to the majority of residents. 6. The town of Paradise is lacking in soccer fields and would most certainly approach the church to rent field time. While rental fees might enhance the church's income, there is no telling how much of each weekday afternoon or weekend hours would have excessive noise levels and increased traffic problems. Our area would be even more impacted if the baseball/softball field were -also rented to other groups. That would lengthen the season of activities and level of noise, and would be unacceptable to area residents. If both playing fields were in use for youth sports and adult sports, the racket and amount of vehicles could conceivably be non-stop. 7. The traffic at Pentz Road and Pearson during peak hours is already near capacity. The addition of what appears to be a "Sports Complex" could lead to much greater traffic problems, impacting an even greater area than just the homes surrounding the church property. 8. At present there seem to be no plans for lighting, public address systems or snack stands. However, these additions will more than likely be requested as soon as usage/rental time becomes needed. That is completely unacceptable for all properties neighboring the church. Already there is a problem with lighting that is nct always turned off after night meetings at the church. Concerns and Objections Re: Usage of 5095 Pentz Road, page 2 9. It would potentially require the removal of a number of trees and/or shrubs ruining the natural setting that attracted the present residents. That would also be unacceptable. 10. The property involved has been a natural refuge for a number of deer, birds and other wildlife. Unique Acres residents feel that is part of what makes the area unique and would like it to remain that way. 11. Residents in Unique Acres and adjacent areas built or purchased homes for several reasons: • Lovely, quality homes of larger than average size with varied acreage n a wooded area that doesn't compromise fire safety. • Serene and safe neighborhood with a low crime rate. • Natural setting which includes the free passage of deer and plenty of birds (that might vacate with all the noise). • An expectation that any improvements in the will enhance, not reduce, property values. 12. If these plans are allowed to proceed,. there is grave concern by the vast majority cf residents that the.close proximity, noise levels, traffic, reduced natural setting, and potential crime will greatly reduce the present high quality of life. Also, it will adversely affect future re -sale value of homes and/or property. * NOTE: Rev. and Mrs. Jacobsen have been living in Malibu Estates at the corner of Pentz Road and Malibu Drive (across from Unique Acres). All of these possible conditions would have affected their personal lifestyle too. However, he is retiring and their house is being sold. Re: Property development adjacent to Evangelical Free Church at 5095 Pentz Road, just outside the town limits of Paradise, in Butte County In Unique Acres: # of homes contacted: 11 # of adults: 21 # of children: 5 # of homes left message: 3 # of adults: (unavailable) # of children: (unavailable) # of homes not contacted: 9 # of people: (unavailable) # of children: (unavailable) On Pentz Road (below Unique Acres): # of homes contacted: 4 # of adults: 5 # of children: (unavailable) # of homes not contacted: ? # of adults: (unavailable) # of children: (unavailable) On Pentz Road (above Unique Acres): # of homes contacted: 1. # of adults: 1 + ? USE PERMIT --------------------------- BUTTE COUNTY HOARD OF SUPERVISORS -- DATES (Registered Mail Rec.) ----65=60-------------------- PERMIT NO. ----AP_5_5_-22$=?}-------------- ASSESSOR'S PARCEL NO. Pursuant to.the provisions of the Zoning Ordinance of the Cdunty of Butte and the special conditions set forth below: Paradise Evangelical Free Church is hereby granted a Use Permit in accordance with application filed: 3/26/e5 to allow a church and facilities on the west aide of Pentz Road at Arden Way, south of Paradise. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit, constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Enabling Ordinance. 2. Unless otherwise provided for in a condition to a use permit, all conditions must be completed by the permittee within 12 months of the delivery of the.countersigned permit to the permittee. 3. If any use for which a use permit has been granted is not established within one year of the date of receipt of the countersigned permit by the permittee, the permit shall become null and void and reapplication shall be required to establish the use. SPECIFIL CONDITIONS$ 1. Obtain encroachment permits from Public Works. 2. Install a standard S-18 public road approach at each access point to the property. 3. Submit estimate of traffic generation and turning movements prepared by registered engineer to Public Works for review and comments. 4. Provide a permanent solution for drainage. Submit construction and .drainage plans to Department of Public Works for approval and install the required facilities. 5. Prior to issuance of building permits, the BLM on AP 55-29-21 approved 11/24/80 shall be finalized as conditioned; or, alternatively, that an easement for the proposed ingress, egress, and parking improvements be obtained from the record title owner. n 0 0 6. Meet the requirements of CDF, including but not limited to, installation of one fire hydrant. 7. Provide sewage disposal under permit and inspection by Butte County Environmental Health. e. All escavated soils to be deposited as noted on the site plan, terraced and planted with ground cover to minimize erosion. 9. Submit grading plan to Public Works for approval. 10: Applicant must also comply with all other applicable State and local statutes, ordinances, and regulations. I hereby declare under penalty of perjury that 1 have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that 1 agree to abide fully by said conditions. Dated: /��_ AP I' -- -=------------------------------------ .. NOTE: Issuance of this Use Permit'does not waive requirement of obtaining Building and Health Department permits before starting construction, nor does it wa• a any o er requirements. 91a irman of Board of Supervisors CC: Department of Public Works (2) Health Department Fire Department r N 2pmJ� Q` To: Butte County Board of Supervisors and Planning Commission From: Concerning citizens in and around Unique Acres, Paradise, CA Al I(e) �Q°! Re: Evangelical Free Church of Paradise, 5095 Pentz Road Proposal for building and usage of church property Date: April 25, 2001 The residents who do live in the affected area have spent a great deal of research, time, effort and money to build or buy their homes and live in a unique setting. They do not want their quality of life jeopardized in any way. Apparently, none of the members of the church's congregation live in Unique Acres, and their standard of living is not suffering a questionable fate. Until this time, the Evangelical Free Church of Paradise has seemed to be mostly a "good . neighbor." However, this plan, is not at all neighborly. What the church proposes is not conducive to the quality of homes in. the area. It is not conducive to value of the homes. It is not conducive to the peaceful, safe setting for people or wildlife. It is not conducive to the natural setting. It is not conducive to the reasons that residents chose this area in which to live. Had anyone known of the church's expansion plans, many would not have chosen this area. In fact, several are already considering the possibility 4 moving away. This also impacts Butte County, too, in the terms of income. If the properties are de -valued by the proposed building and the subsequent activities, then future tax revenues could be diminished considerably. Since the project seems to be so much greater than the original verbal proposal, it might be best to reject the plan entirely and let the church review its goals and find a more spiritual way to attract new members. Another.idea would be table the proposal until a survey could be sent to the entire southern portion of Paradise, since the noise would reach much farther than originally imaged. The traffic problem would extend an even greater distance. A study should also include numbers.of users of the proposed facilities and what impact that would have. The police, fire, and emergency aid providers, as well as the hospital and immediate care facilities need to be surveyed as to how capable they are to handle additional injuries. Of course, the time it takes to accomplish this research gives Unique Acres more time to organize an even larger opposition to any new proposal, which the residents seem fully prepared to do. 'It also is not pleasant to consider the.cost to the county to accomplish this task. Memo to Butte County officials, page 2 The people listed below have voiced concerns about the proposal to build what amounts to a "sports complex." In addition to the names and signatures attached, there are an even greater number (see tally sheet), that were contacted and signatures could not be obtained in time. There were also a number of people who could not even be contacted in time. Some concerned residents had previous engagements or work that kept them from being in attendance at the hearing. We ask that you decide in favor of your tax paying citizens and do not allow this misguided. use of an area so close to a special and unique residential area. Thank you for your consideration in this matter. M HISTORY REGARDING PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095, PENTZ ROAD February, '2001 Reverend Igmar Jacobsen contacted several homes and businesses adjacent and/or near the church property, stating the hope to build a playground for the congregation and lower Paradise community children on presently unused church property. Rev. Jacobsen gave the impression "a playground" would be something like a sandlot, jungle gym, and play equipment. It sounded like a simple project involving a minimum amount of inconvenience during construction to grade the ground and install equipment. It seemed that the natural setting around the area would not be disturbed. He made it seem as if there would be a relatively small amount of noise when the project was completed. Each person who listened to his proposal felt that this project would be for the benefit ofoY una .children accompanied and supervised by adults. March Notice of Public,Hearing was sent from Butte County. - The summary sheet did not resemble the above-mentioned conversation with Rev. Jacobsen at all. The present plan is far larger, more extensive, and is questionable as to how many age groups it is meant to service (i.e., grade school youth, teenagers,. college/young adults, and/or adult teams). It creates a much more adverse impact in any of its forms than the originally mentioned playground. April 21 - 23 Charles (Karoly) Kasza, the developer of Unique Acres, approached Several neighbors most directly affected byrthe church's proposal with a map of the project. April 24 — 25 Neighbors in Unique Acres and several along Pentz Road contacted each other, made plans to send letters of protest and/or attend the hearing, gather data, and list concerns and reasonable objections to present at the hearing. Only one business owner of an RV park across the street from the church apparently had no objections, thinking more people in the area might increase his income and has sent a letter of approval. . M M History of Proposed Usage of Property at 5095 Pentz Road, page 2 Some residents were unavailable for comment (see attached tally). Several residents diligently tried to consider possible adjustments to the plan. Three of those residents have a letter to submit to the hearing (see letter from Dale & Judy Simpson and Minnie Coolidge). However, in contacting nearly 75% of the residents in Unique Acres and several on either side of the church on Pentz Road, it is the general consensus that the plan is not conducive to the area's lifestyle and should be rejected by Butte County officials (see list of concerns and objections).. c . CONCERNS AND OBJECTIONS TO PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD. 1. It is not a simple playground for neighborhood children, as originally stated to several people by the minister*. 2. Instead it includes a gymnasium, public restrooms, soccer field, and baseball ball field, presumably for the use of the congregation and its affiliates. 3. The ball field plan shows that it would come within 10 feet of several homes which is far too close for these types of activities and the ensuing noise levels. 4. Even though the visiting teams for these sports might be church -affiliated, not always does every participant care_about the church. teachings. They are often more intent on the activity of the sport. A few of these people (or their drivers) could target our area for a variety of crimes. 5. These facilities would certainly attract -more :vehicles, people and noise, greatly reducing the serenity the properties -,.in Unique Acres and along Pentz Road, which is, .unacceptable to the majority of residents. 6. The town of Paradise is lacking in soccer fields and would most certainly approach the .:church..to.rent field time. ;While rental.fees.might. enhance the.church's income, there is no telling how much of each weekday afternoon or weekend hours would have excessive noise levels and increased traffic problems. Our area would be even morE impacted if the baseball/softball field were also rented to other groups. That would lengthen the season of activities and level of noise, and would be unacceptable to . area residents. If both playing fields were in use for youth sports and adult sports, the racket and amount of vehicles could conceivably be non-stop. 7. The traffic at Pentz Road and Pearson during peak hours is already near capacity. The addition of what appears to be a "Sports Complex" could lead to much greater traffic problems, impacting an even greater area than just the homes surrounding the church property. 8. At present there seem to be no plans for lighting, public address systems or snack stands. However, these additions will more than likely be requested as soon as usage/rental time becomes needed. That is completely unacceptable for all properties neighboring the church. Already there is a problem with lighting that is not always turned off after night meetings at the church. ^� r Concerns and Objections Re: Usage of 5095 Pentz Road, page 2 9. It would potentially require the removal of a number of trees and/or shrubs ruining the natural setting that attracted the present residents. That would also be unacceptable. 10. The property involved has been a natural refuge for a number of deer, birds and other wildlife. Unique Acres residents feel that is part of what makes the area unique and would like it to remain that way. 11. Residents in Unique Acres and adjacent areas built or purchased homes'for several reasons: • Lovely, quality homes of larger than average size with varied acreage in a wooded area that doesn't compromise fire safety. • Serene and safe neighborhood with a low crime rate. • Natural setting which includes the free passage of deer and plenty of birds (that might vacate with all the noise). • An expectation that, -,.any improvements in the will enhance, -not reduce. property values. 12. If these plans are allowed to proceed, there is'grave concern by the vast majority of residents..that the_ close.proximity.,_noise levels, .traffic,; reduced .natural setting, and potential crime will greatly reduce the present high quality of life. Also, it will adversely affect future re -sale value of homes and/or property. * NOTE: Rev. and Mrs. Jacobsen have been living in Malibu Estates at the corner of Pentz Road and Malibu Drive (across from Unique Acres). All of these possible conditions would have affected their personal lifestyle too. However, he is retiring and their house is being sold. Re: Property development adjacent to Evangelical Free Church at 5095 Pentz Road, just outside the town limits of Paradise, in Butte County In Unique Acres: # of homes contacted: 11 # of adults: 21 # of children: 5 # of homes left message: 3 # of adults: (unavailable) # of,.children: (unavailable) # of homes not contacted: 9 # of people: (unavailable) # of children: (unavailable) On Pentz-Road (below Unique Acres): # of homes contacted: 4 # of adults: 5 # of children: (unavailable) # of homes not contacted: ? # of adults: (unavailable) # of children: (unavailable) On Pentz Road (above Uniaue Acres): # of homes contacted: 1 # of adults: 1 + ? t ` HISTORY REGARDING PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD February, 2001 Reverend Igmar Jacobsen contacted several homes and businesses adjacent and/or near the church property, stating the hope to build a playground for the congregation and lower Paradise community children on presently unused church property. Rev. Jacobsen gave the impression "a playground" would be something like a sandlot, jungle gym, and play equipment. It sounded like a simple project involving a minimum amount of inconvenience during construction to grade the ground and install equipment. It seemed that the natural setting around the area . would not be disturbed. He made it seem as if there would be a relatively small amount of noise when the project was completed. Each person who listened to his proposal felt that this project would be for the benefit ofoY una children accompanied and supervised by adults. March Notice of Public Hearing was sent from Butte County. The summary sheet did not resemble the above-mentioned conversation with Rev. Jacobsen at all. The present plan is far larger, more extensive, and is questionable as to how many age groups it is meant to service (i.e., grade school youth, teenagers, college/young adults, and/or adult teams). , It creates a much more adverse impact in any of its forms than the originally mentioned playground. April 21 - 23 Charles (Karoly) Kasza, the developer of Unique Acres, approached Several neighbors most directly affected by the church's proposal with a map of the project. April 24 — 25 Neighbors in Unique Acres and several along Pentz Road contacted each other, made plans to send letters of protest and/or attend the hearing, gather data, and list concerns and reasonable objections to present at the hearing. Only one business owner of an RV park across the street from the church apparently had no objections, thinking more people in the area might increase his income and has sent a letter of approval. History of Proposed Usage of Property at 5095 Pentz Road, page 2 Some residents were unavailable for comment (see attached tally). Several residents diligently tried to consider possible adjustments to the plan. Three of those residents have a letter to submit to the hearing (see letter from Dale & Judy Simpson and Minnie Coolidge). However, in contacting nearly 75% of the residents in Unique Acres and several on either side of the church on Pentz Road, it is the general consensus that the plan is not conducive to the area's lifestyle and should be rejected by Butte County officials (see list of concems and objections). CONCERNS AND OBJECTIONS TO PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD -It is not a simple playground for neighborhood children, as originally stated to several people by the minister*. 2. Instead it includes a gymnasium, public restrooms, soccer field, and baseball ball field, presumably for the use of the congregation and its affiliates. 3. The ball field plan shows that it would come within 10 feet of several homes which is far too close for these types of activities and the ensuing noise levels. 4. Even though the visiting teams for these sports might be church -affiliated; not always does every participant care about the church teachings. They are often more intent on the activity of the sport. A few of these people (or their drivers) could ,target our area for a variety of crimes. 5. These facilities would certainly attract more vehicles, people and noise, greatly reducing the serenity the properties in Unique Acres and along Pentz Road, which is unacceptable to the majority of residents. 6. The town of Paradise is lacking in soccer fields and would most certainly approach the church to rent field time. While rental fees might enhance the church's income, these is no telling how much of each weekday afternoon or weekend hours would have excessive noise levels and increased traffic problems. Our area would be even more impacted if the baseball/softball field were also rented to other groups. That would lengthen the season of activities.and level of noise, and would be unacceptable to area residents. If both playing fields were in use for youth sports and adult sports, the racket and amount of vehicles could conceivably be non-stop. 7. The traffic at Pentz Road and Pearson during peak hours is already near capacity. The addition of what appears to be a "Sports Complex" could lead to much greater traffic problems, impacting an even greater area than just the homes surrounding the church property. 8. At present there seem to be no plans for lighting, public address systems or snack stands. However, these additions will more than likely be requested as soon as usage/rental time becomes needed. That is completely unacceptable for all properties neighboring the church. Already there is a problem with lighting that is not always turned off after night meetings at the church. Concerns and Objections Re: Usage of 5095 Pentz Road, page 2 9. It would potentially require the removal of a number of trees and/or shrubs ruining the natural setting that attracted the present residents. That would also be unacceptable. 10. The property involved has been a natural refuge for a number of deer, birds and other wildlife. Unique Acres residents feel that is part of what makes the area .unique and would like it to remain that way. 11. Residents in Unique Acres and adjacent areas built or purchased homes for several reasons: • Lovely, quality homes of larger than average size with varied acreage in a wooded area that doesn't compromise fire safety. • Serene and safe neighborhood with a low crime rate. • Natural setting which includes the free passage of deer and plenty of birds (that might vacate with all the noise). • An expectation that any improvements in the will enhance, not reduce, property values. 12. If these plans are allowed to proceed, there is grave concern by the vast majority of residents that the close proximity, noise levels, traffic, reduced natural setting, and potential crime will greatly reduce the present high quality of life. Also, it will adversely affect future re -sale value of homes and/or property. * NOTE: Rev. and Mrs. Jacobsen have been living in Malibu Estates at the. corner of Pentz Road and Malibu Drive (across from Unique Acres). All of these possible conditions would have affected their personal lifestyle too. However, he is retiring and their house is being sold. Re: Property development adjacent to Evangelical Free Church ait 5095 Pentz Road, just outside the town limits of Paradise, in Butte County In Uniaue Acres: # of homes. contacted: 11 # of adults: 21 # of children: 5 # of homes left message: 3 # of adults: (unavailable) # of children: (unavailable) # of homes not contacted: 9 # of people: (unavailable) # of children: (unavailable) 1 On Pentz Road (below Unique Acres): # of homes contacted: 4 # of adults: 5 # of children: (unavailable) # of homes not contacted: ? # of adults: (unavailable) # of children: (unavailable) On Pentz Road (above Uniaue Acres): # of homes contacted: 1 # of adults: 1 + ? dPNI yet 0� �,qo 033 Pr.P°se� I� \ J ��✓ Cs v I p}4Ps y a d Y 1 W4S1� ro•�►9 � ma �TftFlm eL - Free l�aha�is e C a 4 ���Q QGoySs� $TT - Y2,K( N, P�aY c (� '� E,c•s�"9 ` p�.; a �s -� _ � 1 y � d LU SAFARI L,A M;!- -St.* r e p rtut U/*- If r � o 0 z }0 F- cn N Z, c M �- 00 nnn LJ uJ Z LU z V- m J a I� \ J ��✓ Cs v I p}4Ps y a d Y 1 W4S1� ro•�►9 � ma �TftFlm eL - Free l�aha�is e C a 4 ���Q QGoySs� $TT - Y2,K( N, P�aY c (� '� E,c•s�"9 ` p�.; a �s -� _ � 1 y � d LU SAFARI L,A M;!- -St.* r e p rtut U/*- If r ° dOy i zlN�d / \ \� \L r...,rs oV 13 .,g I\ \ ` \ \ \ Cc zl O J \16 T � h d C V y e ` � f � S m 1 P S • � € 7� L C � _ r � 1 \O Z > Q X r- uj �z p q m � J co Cl. Y t�J `. N } v CIC _....._ � rt1 d � Dry C�Qe►1 1VIay 23, 2001 Paradise Evangelical Free Church 5095 Pentz Road Paradise, CA 95969 Re: Use Permit, AP 055-290-083 Gentlemen: w: _ uife CO LAND OF NATURAL WEALTH AND BEAUTY PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 9596.E-3397 TELEPHONE: (530) 538-7601 FAX: (530)538-7785 At the regular meeting of the Butte County Board of Supervisors held May 22, 2001, the appeal of the Planning Commission's approval of a Use Permit to allow Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms was denied and the Use Permit approved. A Notice of Determination (NOD)' should be filed for purpose of completing the California environmental quality Act requirements. The fee for filing the NOD is a $25.00 document handling fee. A check made payable to the Butte County Treasurer in the amount of $25.00 should be submitted to the Planning Division in order to complete the process. Enclosed are two copies of your Use Permit. Please sign both copies of the Use Permit and return them to this Division. You must sign the Use Permit within thirty (30) days of the expiration of the appeal period. Both signed copies must be received, by this Division, within forty (40) days from approval of the permit by the Planning Commission. The Use Permit is deemed granted when the enclosures have been signed by the applicant, with the counter signature of the Chairman of the Planning Commission, and'said permit is received by the applicant by certified mail. Pursuant to Section 66020 (d) (2) of the Government Code you are hereby noted that you have 90 days to register a protest challenging any fees, dedications, reservations, or exactions imposed as conditions of approval for this project. Should you have any questions regarding this matter, please contact Stephen Betts at this office between 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely, Lynn Richardson Administrative Support Service Assistant Ar s 9l: 1\ I I N I S, V IL .\ 1 I\ I:�F I'Il A L•t►11NTY (W ISUTI. '.. :S COUNTY CENTER OR OROVILLE. CALIFORNIA 95965-3780 1916) 534.4631 MEMBERS 0► 111E BOAR!, i A HASKEI A. M<IN IURI + JA)If DOI A1+ VAR/•1J NCM1l{ HILDA *-1 1 + I: l'W I A(1WSI wiM L11l1[L+: ED M<LAUId+I +N i LEN fUl t+;r+ Y 1 R September 18, 1985 ; Paradise Evangelical Free Church P.O. Box 1106 Paradise, Ca. 95969 Re: Use Permit, AP 55-29-21 Gentlemen: At the regular meeting of the Butte County:Board of Supervisors held September 17, 1985, your request for a Use Permit to allow a church and facilities on the west side of Pentz Road at Arden Way, south, of Paradise, was approved subject to the following conditions: 1. Obtain encroachment permits from Public Works. 2. Install a standard S-18 public road approach at each access point to the property. 3. Submit estimate of traffic generation and turning movements prepared by registered engineer to Public Works forreview and comments. 4. Provide a permanent solution for drainage. Submit construction and drainage plans to Department of Public Works for approval and install the required facilities. 5. Prior to issuance of building permits. the BLM on AP 55-29-21 approved 11/24/80 shall be finalized as conditioned; or, alternatively, that an easement for the proposed ingress, egress and parking improvements be obtained from the record title owner. 6. Meet the requirements of CDF, including but not limited to, installation of one fire hydrant. 7. Provide sewage disposal under permit and inspection by Butte County Environmental Health. 8. All excavated soils to be deposited as noted on the site plan, terraced and planted with ground cover to minimize erosion. 0 • Paradise Evangelical Free Church t Page -2 September 18. 1985 9. Submit grading plan to Public Works for approval. iE i` 10. Applicant must also comply with all other applicable Slate and local statutes, ordinances, and regulations. Your Use Permit will be issued after the official approval of the minutes of the Board of Supervisors for September 17, 1985. Should you have any questions regarding this matter. please contact the Planning Department between the hours of 10:00 a.m. and 3:00 p.m. Sincerely. Martin J. Nichols Chief Administrative Officer MJN:lr INTER -DEPARTMENTAL MEMORANDUM PUBLIC WORKS DEPARTMENT o PRT��T �P�� TO: THE HONORABLE BOARD OF SUPERVISORS FROM: STUART EDELL, MANAGER, LAND DEVELOPMENT DIVISION PUBLIC WORKS SUBJECT: PARADISE EVANGELICAL FREE CHURCH APPEAL AP 055-029-083, UP 01-15 DATE: MAY 8, 2001 We have re -reviewed the proposed Public Works Condition 9 and determined that it provides the greatest flexibility for the Church to either install the left turn pockets or provide an Engineer's report and install the necessary facilities. Since the details of the traffic patterns in the area have not been thoroughly investigated at this point the only other alternative we would be able to recommend would be a focused EIR, which addresses traffic impacts. cc: Mike Crump, Director of Public Works (File 300) INTER -DEPARTMENTAL MEMORANDUM DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION To: Stu Edell, Land'Development Division From: Steve Betts -'C7 Subject: Use Permit for the Paradise Evangelical Free Church, APN 055-290-083 Date: May 2, 2001 This project was approved by the Planning Commission on April 26, 2001.. The applicant .subsequently appealed that decision to the Board of Supervisors due to Public Works condition # 9, which required either the construction of a left turn pocket, or an analysis to determine if a left turn pocket or other road improvements were necessary. A nearby landowner also appealed the Commission's approval of the project. If you would like to respond to the applicant's reason for appeal, please do so immediately. The appeal hearing has been scheduled for May. 22, which requires that the Board packet be completed by next Tuesday, although we are trying to get it finished this Friday before Lynn goes on vacation. A copy of the applicant's appeal letter is attached, along with the draft minutes of the Planning Commission meeting, which includes the conditions of project approval. JOARO OF SUPERVISORS . • APR 3 0 2001 ,6 6 OROMLLE, CALIFORNIA r o 13 �p Cr The Viilage Printer, Im. (530)877.9693 COUNTY OF BUTTE . OFFICIAL RECEIPT M 8 4 3 Q RECEIPT C- OFFICE OR DEPARTM ISSUING Received from -AA $ The Sum of For v` ' Received: Received By CASH ❑ Title CHECK §( By r The Viilage Printer, Im. (530)877.9693 ft �t L, z �, zoo , TO -ITE 6WTV 6gco OF #00, Jo AN lSNH�'i�iJeiREC�Z V �• Acp Dl-�5E T 6k — Ei/d�CEG/C� kE� cv�P,QCht E"cG'\� 1/tJE f�E d��C�IUNq Thf PqWoV,19-(., c� U5c- ��rYI�T �oR plE, f, G: WE b�9vc- MAnI� OGYo5E7ioA)S1Con) c6W-tlS OFT/�{E APPI�oVfital �c--�j�Din1� TIE CMa)-D1T-1OA),5 1 1 Received from The Sum of For _Received: CASH CHECK ❑ The Vinare Printer 1 v icvnar..- COUNTY OF BUTTE OFFICIAL RECEIPT OFFICE OR DEPARTMENT ISSUING RECEIPT Received By Bv n 31 43i s� R PERSONS CONTACTED REGARDING BUILDING PROPOSAL BY EVANGELICAL FREE CHURCH 1. Mrs. JoAnn Knappenberger 4964 Malibu Drive 2. Ms. Beth Knappenberger "SD 4964 Malibu Drive qk 3. Mr. Ken Scott - 4965 Malibu Drive 4. Mrs. Marianne Scott 4965 Malibu Drive 5. Mrs. Minnie Coolidge see attached si ned le er 4946 Malibu Drive 6 & 7. Mr. & Mrs. Dale Simpson see attached signed letter 4940 Malibu Drive 8. Mr. Bob Arkenberg 4878 Malibu Drive 9. Mrs. B.J. Arkenberg 4878 Malibu_ .Drive 10. Mr. D. L. Varney 4887 Malibu Drive, 11. Mrs. Ruth Varney 4887 Malibu Drive 12. Mr. Jack Schilling 5289 Harrison Road R Persons Contacted, page 2 13. Mrs. Peggy Schilling 5289 Harrison Road 14. Mr. Jim Nelson 5304 Harrison Road k 15'. Mrs. Yrata Nelson 5304 Harrison Road ' 17. Mr. David Uren $246 Laguna Court 18. Mrs. Jean.Uren 5246 Laguna Court 19. Mrs. Joyce Blythe 5247 Laguna Court 20. Mr. Tom Doll 5259 Laguna Court 21. Mrs. Connie Doll 5259 Laguna Court 22. Mrs. Flo Barnett 5061 Pentz Road 23. Mr. Dan Barnett Pentz Road 24.' Mrs. Janice Barnett Pentz Road • Com.�,Q�e Persons Contacted, page 3 25. Mr. Dick Duncel 5145 Pentz Road 26. Mrs. Shirley Duncel 5145. Pentz Road 7. 27. Mr. Ralph Ludenbacher Pentz Road ? 28. . Mrs. Nancy Ludenbacher Pentz Road • 29. Mr. Karoly (Charles) ,Kasza -lama Road 'D� M P, R. ®, L L AZI I -�K Q, yi�stRa. kv cal�h 6� �k wk4v, - To: Butte County Board of Supervisors and Planning Commission From: Concerning citizens in and around Unique Acres, Paradise, CA Re: Evangelical Free Church of Paradise, 5095 Pentz Road Proposal for building and usage of church property Date: April 25, 2001 The residents who do live in the affected area have spent a great deal of research, time, effort and money to build or buy their homes and live in a unique setting. They do not want their quality of life jeopardized in any way. Apparently, none of the members of the church's congregation live in Unique Acres, and their standard of living is not suffering a questionable fate. Until this time, the Evangelical Free Church of Paradise has seemed to be mostly a "good neighbor." However, this plan is not at all neighborly. What the church proposes is not conducive to the quality'of homes in the area. It is not conducive to value of the homes. It is not conducive to the peaceful, .safe setting .for -people _or wildlife. It is not conducive to the natural setting. Itis not conducive to the reasons that residents chose this area in which to live. Had anyone known of the church's expansion plans, many would not have chosen this -area. _In fact; _several are already considering the. possibility of moving away. This also impacts,Butte County, too, in the terms of income. If the properties are de=valued by the proposed building and the subsequent activities, then future tax revenues could be diminished considerably. Since the project seems to be so much greater than the original verbal proposal, it might be best to reject the plan entirely and let the church review its goals -and find a more spiritual way to attract new members. Another idea would be table the proposal until a survey could be sent to the entire southern portion of Paradise, since the noise would reach much farther than originally imaged. The traffic problem would extend an even greater distance. A study should also include numbers of users of the proposed facilities and what impact that would have. The police, fire, and *emergency aid providers, as well as the hospital and immediate care facilities need to be surveyed as to how capable they are to handle additional injuries. Of course, the time it takes to accomplish this research gives Unique Acres more time to organize an even larger opposition to any new proposal, which the residents seem fully prepared to do. It also is not pleasant to consider the cost to the county to accomplish this task. n� Memo to Butte County officials, page 2 The people listed below have voiced concerns about the proposal to build what amounts to a "sports complex." In addition to the names and signatures attached, there are an even greater number (see tally sheet), that were contacted and signatures could not be obtained in time. There were also a number of people who could not even be contacted in time. Some concerned residents had previous engagements or work that kept them from being in attendance at the hearing. We ask that you decide in favor of your tax paying citizens and do not allow this misguided use of an area so close to a special and unique residential area. Thank you for your consideration in this matter. HISTORY REGARDING PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD February, 2001 Reverend Igmar Jacobsen contacted several homes and businesses adjacent and/or near the church property, stating the hope to build a playground for the congregation and lower Paradise community children on presently unused church property. Rev. Jacobsen. gave the impression "a playground" would be something like a sandlot, jungle gym, and play equipment. It sounded like a simple project involving p, minimum amount of inconvenience during construction to grade the ground and install equipment. It seemed that the natural setting around the area would not be disturbed. He made it seem as if there would be a relatively small amount of noise when the'project was completed. Each -person who listened to his proposal felt that this project would be for the benefit ofoy una children accompanied and supervised by adults. March . Notice of Public Hearing .was�sent.frorn Butte County. The -summary sheet did not resemble the above-mentioned conversation with Rev. Jacobsen at all. ` The present plan is far larger, more extensive, and is questionable as to how many age groups it is meant to service (i.e., grade school youth, teenagers, college/young adults, and/or adult teams). It creates a much more adverse impact in any of its forms than the originally mentioned playground. April 21 - 23 Charles (Karoly) Kasza, the developer of Unique Acres, .approached Several neighbors most directly affected by the church's proposal with a map of the project. April 24 — 25 Neighbors in Unique Acres and several along P.entz Road contacted each other, made plans to send letters of protest and/or attend the. hearing, gather data, and list concerns and reasonable objections to present at the hearing. ' Only one business owner of an RV park across the street from the church apparently had no objections, thinking more people in the area might increase his income and has sent a letter of approval. History of Proposed Usage of Property at 5095 Pentz Road, page 2 Some residents were .unavailable for comment (see attached tally). Several residents diligently tried to consider possible adjustments to the plan. Three of those residents have a letter to submit to the hearing (see letter from Dale & Judy Simpson and Minnie Coolidge). However, in contacting nearly 75% of the residents in Unique Acres and several, on either side of the church on Pentz Road, it is the general consensus that the plan is not conducive to the area's lifestyle and should be rejected by Butte County officials (see list of concerns and objections). \ Re: Property development adjacent to Evangelical Free Church at; 5095 Pentz Road, just outside the town limits of Paradise, in Butte County In Unique Acres: # of homes contacted:. 11 # of adults: 21 # of children: 5 # of homes left message: 3 # of adults: (unavailable) # of children: (unavailable) # of homes not contacted: 9 # of people: : `(unavailable) # of children: (unavailable) ,On-Pentz-Road.fbelow:Unigue Acres): # of homes contacted: 4 r # of adults: 5 # of children: (unavailable) # of homes not contacted: ? # of adults: (unavailable) # of children: (unavailable) _ On Penitr Road (above Unique Acres): # of homes contacted: 1 # of adults: 1 + ? CONCERNS AND OBJECTIONS TO PROPOSED USAGE OF PROPERTY BELONGING TO EVANGELICAL FREE CHURCH OF PARADISE 5095 PENTZ ROAD 1. It is not a simple playground for neighborhood children, as originally stated to several people by the minister*. 2. Instead it includes a gymnasium, public restrooms, soccer field, and baseball ball field, presumably for the use of the congregation and its affiliates. 3. The ball field plan shows that it would come within 10 feet of several homes which is far too close for these types of activities and the ensuing noise levels. 4. Even though the visiting teams for these.sports might be church -affiliated, not always does every participant care about the church teachings. They are often more --intent on-the'activity of the -sport. 'A few of -these people (or their drivers) could target our area for a variety of crimes. 5. These facilities would certainly attract more vehicles, people and noise, greatly reducing the serenity the properties in.Unique Acres,and along Pentz Road, which is unacceptable to the majority of residents. 6. The town of Paradise is lacking in soccer fields and would most certainly approach the church ,to rent field time. While rental fees might enhance the church's income, there is no telling how .much of each weekday afternoon or weekend hours would have excessive noise levels and increased traffic problems. Our area would .be even more, impacted if the baseball/softball field were also rented to other groups. That would lengthen the season of activities and level of noise, and would be unacceptable to area residents. If both playing fields were in use for youth sports and adult sports, the racket and amount of vehicles could conceivably be non-stop. 7. The traffic at Pentz Road and Pearson during peak hours is already near capacity. The addition of what appears to be a "Sports Complex" could lead to much greater traffic problems, impacting an even greater area than just the homes surrounding the church property. 8. At present there seem to be no plans for lighting, public address systems or snack stands. However, these additions will more than likely be requested as soon as usage/rental time becomes needed.. That is completely unacceptable for all properties neighboring the church. Already there is a problem with lighting that is not always turned off after night meetings at the church. Concerns and ' Objections Re: Usage of 5095 Pentz Road, page 2 9. It would potentially require the removal of a number of .trees and/or shrubs ruining the natural setting that attracted the present residents. That would also be unacceptable. 10. The property involved has been a natural refuge for a number of deer, birds -and other wildlife. Unique Acres residents feel that is part of what makes the area unique and would like it to remain that way. 11. Residents in Unique Acres and adjacent areas built or purchased homes for several reasons: • Lovely, quality homes of larger than average size with varied acreage in ,a wooded area that doesn't compromise fire safety. • Serene and safe neighborhood with a low crime rate. • Natural setting which includes the free passage of deer and plenty of birds (that might vacate with all the noise). • An expectation that any improvements:in the will enhance,F..not reduce, property values. . 12. If these plans are allowed to proceed, there is grave concern by the,vast majority.of residents that. the: close proximity, noise levels, traffic,. reduced natural setting, and potential crime will greatly reduce the present high quality of life. Also, it will adversely affect future re -sale value of homes and/or property. * NOTE: Rev. and Mrs. Jacobsen have been living in Malibu Estates at the corner of Pentz Road and Malibu Drive (across from Unique Acres). All of these possible conditions would have affected their personal lifestyle too. However, he is retiring and their house is being sold. April 25, 2001 TO WHOM IT MAY CONCERN: Our rear yard abuts the open area owned by the Evangelical Free Church at 5095 Pentz Road in Paradise. We are aware of the Church's proposal to develop this open area for purposes of an athletic field. First of all, I must say, one of the reasons we chose this property was the privacy and quiet serenity of our rear yard. We would be extremely unhappy. were we to loose this condition. And we would anticipate it would loose any attractiveness to potential future owners. We are not completely against any development for this purpose; however, we request consideration for our situation also. We have no interest in hearing the noise, which would be associated with this type of activity. Therefore, if it could be mitigated to our satisfaction we would have no objection. The Church's proposal of a 10 -foot wide corridor is in no manner adequate to quiet the sound from the playing field. We question if a 30 -foot wide corridor would be at all adequate. We would, in the spirit of cooperation, be amenable to the development provided a 30 -foot wide corridor is proposed and also that it is heavily shrubbed and fenced, on the playing field side, to curb the noise. Sincerely, Dale & Judy Simpson 4940 Malibu Drive /P adise, C 95 9 0911 NU Minnie Coolidge 4948 Malibu Drive Paradise, CA 95969 past spring run An ecologist's remarks this week rebut suggestions that the chi:.. y not really be wild fish native to that stream. north state stocks staying pure bred with salmon from the Oroville Fish Hatchery, which were planted in Butte Creek a number of years ago. But Lindley, who works for the National Marine Fisheries netically quite dif- Service, said DNA te"s- ing on salmon found in various north- te streams, an ecol- state waters shows the Butte Creek fish are a pure, distinct population. is, made from time Apparently, spring -run salmon that are spawned at the ite up Butte Creek hatchery and those that spawn naturally in Butte, Mill and ive to that stream. salmon have inter- See SALMON, 12A terso�r x: evo es.� 44 �. 2� �� an.c o IS y. Forum' p*aCks �cham e By HEATHER HACKING Staff Writer Both sides of the Otteson Drive eztei debate 'squai&-",off5Thursday?at a fo hosted by the LU"'" a of Women Voters_ Opponentscahed the, pioject a $2,9 lion gift to a feW busin6ses when oth fr, jects m town.would. behi t moreresid Proponents o,ttie road,eztension said f: and`a oid gridlock in south Chico. s ::::The: "Chico City Council Chamber: rtpacked. '. The issue of connecting a business j ',..;Otterson Drive with Park Avenue:,v t See OTTERSON, 7A CI%��coE-R, ,4pr•�i �.'�; 2.001���,a:4:�..: �`:r Rid ge chuq"c is OK ge :athletic field By MATT WALTERSCHEIDT • ` "'= Staff Writer _ OROVILLE — Even in the face of neigh : -• borhood protests, there was no need-, for divine intervention, as the Paradise,Evan gelical Free Church received approval fora soccer and. baseball field with adjacent restrooms. All it took Thursday was a unanimous `. vote by the Butte County Planning Commis-. sion that also allows construction of a 6,000 - square -foot gymnasium on what is.alr6dy the site of the congregation's church of ntz Road and Safari Lane. However, the gymnasium will not be built for at least two to five years. . As neighbors filed an appeal immediately after the vote, the Rev. Ingmar Jacobsen will indeed need the support of one higher power — the Butte County Board -of Super - 0 See FIELD, 7A square off via Hegan Lane. Most of the businesses at the business park involve heavy traffic by trucks. According to a report by the Air Quality Management District, over a year'that half -mile of ad- ditional truck traffic could add 10 tons of pollution, he said. "Who are the real environ- mentalists?" Kimmelshue asked. He said the planned bike path would encourage workers to ride their bikes and leave their cars at home. One of the questions from the audience was why couldn't the city instead widen the Midway to make traffic less of a hassle in the area. Speakers said the Midway is known to have high levels of toxins in the soil. If a project was -undertaken, the 'city would need to deal with the costly task of removing those toxins. E .0 Friday, April 27, 2007 FIELD' Neighbors air theirconcernpl, From 1 A in a good Christian manner." , monstrosity." visors, which could still over- turn the commission's decision. But in Thursday's match -up, not one of the five commission- ers was swayed by complaints neighbors fielded. Claiming'her concerns repre- sented those of almost 30 other neighbors ready to sign a peti- tion, Jo Ann Knappenberger said, "I'm afraid he Qacobsen) might rent that space" — even though the county's permit explicitly restricts use of the facilities "to members of the Paradise Evangelical Free Church and church leagues." Saying she held "a ministeri- al degree" herself, Knappen- berger stressed she knew that in religion "expansion is the game" and this would likely invite outsiders to join in the athletic activities. And "these people sometimes don't behave She said that in private meet- ings with individual neighbors, Jacobsen had described the scope of the project as much smaller than what was now pro- posed. Richard Dunkel, another neighbor who owns' a conve- nience store, said he was con- cerned what would happen to his license to sell beer and wine, given how .many children would likely be attracted by a baseball and soccer field. "I'm a little surprised at their change in attitude," Jacobsen responded to neighbors. He sig- naled willingness "to work with the neighbors but only to an extent," explaining that the con- gregation had no interest "in a little sandbox." Other members of the con- gregation like chairman Richard Hamilton stressed the project would not be "some kind of Ted Biggs assured neighbors: "The church is not tbiallY'' iii. ; by a pastor. We're not gpirig' , fes.. be changing - anything 4 Yiat jsr; presented" — even after ,Jacoj sen's imminent departure^from;: the position in Paradise: Arid what was preserted: seemed in the eyes ' of co sioners Fernando Marin bf'Pai-tom adise and Richard Leland'Jr': of« Durham a "wonderful"; in"' - t great, project r z. Speaking 'to the neiglib}prs: fears, -Leland added he could`,' not see athletic activities by chip,'.". dren "in a supervised context bring all this crime to the aiea.'ts Addressing another concern;-+. Commissioner Michael Mooney -i'- of Oroville noted that anybody ­ ll l able to bat far enoughto get-thpl ball from the field to the closest; neighboring residence was sure` to be "a major leaguer some day./, April 5, 2001 To: Responsible and Trustee Agencies LAND OF NATURAL WEALTH AND BEAUTY PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 FAX: (530) 538-7785 Re: NOTICE OF INTENT - To Adopt a Proposed Mitigated Negative Declaration for a Use Permit for the Paradise Evangelical Free Church, APN 055-290-083, File # UP 01-15 The Butte County Planning Division has completed an Initial Study, in accordance with the California Environmental Quality Act (CEQA), of potential environmental _consequences anticipated in connection.with the above-mentioned project, a copy of which is enclosed. This letter serves as 'a Notice of Intent to adopt a Mitigated Negative Declaration to allow responsible and trustee agencies a 20 -day .review period in accordance with Sections 15072 and 15105 of the CEQA Guidelines. 'Please review the enclosed` Initial Study and proposed Mitigated Negative Declaration. This review should focus on your agency's area of expertise and jurisdiction. Any comments must be sent to the above address prior to April 26, 2001. If you have any questions regarding the enclosed environmental document, please contact this office between the hours of 8:00 a.m. and 4:00 p.m. Sincerely, ,Stephen Betts Senior Planner cc: Ingmar Jacobsen, Pastor, Paradise Evangelical Free Church Town of Paradise, Planning Department Ted Crawford, Butte County Fire Department/CDF Craig Erickson, Butte County Environmental Health Division Stu Edell, Butte County Public Works Department, Land Development Division utte Count LAND OF NATURAL WEALTH AND E E A U T Y PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 FAX: (530) 538-7785 April 19, 2001 Paradise Evangelical Free Church 5095 Pentz Road Paradise, CA 95969 Re: Use Permit, AP 055-290-083, UP 01-15 Gentlemen:. Enclosed is a copy of the Agenda Report concerning your application for a Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise.. Should you have any concerns with the report or conditions of approval, please contact us in advance of the meeting so that we may work together to resolve.your concerns. A public hearing has been set for April 26, 2001, at 9:30 a.m..This meeting will be held in the Board of Supervisors' Room, 25 County Center Drive, Oroville, California. The Planning Commission recommends that the applicant. or. their authorized representative be present at the hearing to. respond to any questions the Commission may have. Should you have any questions regarding this matter, please contact Stephen Betts of this office at 538-7601, between 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely, Lynn Richardson Planning/Administrative Support Service Assistant Enc. j :\wpdocs\pclts\schedule. mrg 0 BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT - APRIL 26, 2001 Applicant: Paradise Evangelical Free of Pentz Road and Safari Lane, Church at 5095 Pentz Road, Paradise. File #: UP 01-15 Request: Use Permit to allow an athletic field (baseball, soccer, etc.) and restrooms, and for a 6,000 square foot gymnasium with restroom and shower facilities. G.P.: Low Density Residential Zoning: AR -1 (Agricultural- _ Residential, 1 -acre minimum parcel size) and H -C (Highway Commercial) APN: 055-290-083 Location: On. the north side of Safari Lane, on the northwest corner STAFF COMMENT: Parcel Size: 19 acres Zone date: AR -1: April 4, 1998 H -C: February 23, 1982 Project Stephen Betts, Planner: Senior Planner Supervisor District: 4 Attachments: A. Conditions of Approval B. General Plan/Zoning Map C. Vicinity Map D. Public Notice Map E. Received Letters F. Initial Study G. Site Plan Staff recommends approval of the Use Permit with conditions and findings. PROJECT DESCRIPTION/SITE CHARACTERISTICS: This is an application for a Use Permit to allow an athletic field, (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project is proposed to be developed in three phases: Phase 1 - Construction of the athletic field upon approval of the Use Permit Phase 2 - Restrooms adjacent to the athletic field (one to two years after approval of the Use Permit - Phase 3 - Gymnasium (two to five years after approval of the Use Permit) ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 1 ■ The athletic field will be used for games held by the church congregation and for church league games. The applicant does not propose to allow non -church leagues (i.e. Paradise Recreation District) to use the athletic field or gymnasium. The applicant anticipates that the field will be used for organized games two to three times per week by the church congregation and three to four church league games per year. No lighting of the athletic field is proposed. Approximately 2.2 acres of the site will be graded to create level areas for the athletic field, restroom, and gymnasium. The 19 -acre project parcel is developed with a 13,000 square foot church, parking lots, and a septic system. The church was permitted on the site by Use Permit 85-60. The site has a driveway on Pentz Road and a driveway on Safari Lane. The project site sits on the edge of Dry Creek Canyon and most of the site is undeveloped. Vegetation on the site consists of a mixture of yellow pine and Black Oak with dense brush along the sides of the canyon. The area where the athletic field and gymnasium will be located consists of eight yellow pines and grasses. This area gradually slopes down to the southwest and has a slope of approximately 5 to 10%. No drainages are foundon the site. A fire hydrant is located on the southeast corner of Pentz Road and Wilderness Way. The project site is zoned H -C (Highway Commercial) and AR -1 (Agricultural Residential, 1 -acre minimum parcel size). The H -C zone on the site is located adjacent to Pentz Road and extends from 60 to 100 feet west from the Pentz Road right-of-way. The project site has a General Plan Land Use designation of Low Density Residential. Surrounding parcels are zoned H -C to the east and AR -1 to the south and west. The parcels located on the north side of the site are located in the Town of Paradise and are zoned for residential uses. Surrounding parcels range in size from .5 acres to 20 acres. Land uses on surrounding parcels include single family dwellings to the south, west, and north, a bait and tackle store to the northeast, and mobile home/recreational vehicle parks to the east (across Pentz Road). The project site is located within the Town of Paradise's Sphere of Influence. ANALYSIS: The area where the proposed facilities will be placed is located in the AR -1 portion of the site. The AR -1 zone requires that a Use Permit be obtained for a quasi -public use. The project site is designated by the Land Use Element Map of the Butte County General Plan as Low Density Residential. Quasi -public uses are listed as Secondary Uses in the Low Density Residential designation. Noise Impacts Temporary and single event noise levels will be created during the construction phase. Grading equipment and construction of the gymnasium will generate the most noise. Vehicles containing construction workers, equipment, and material will also generate noise as they arrive and depart the site. The proposed athletic field will be located adjacent to parcels that have residential uses and the residents on these parcels may be significantly impacted by grading activities. Construction of the gymnasium will also generate noise that may cause an impact to nearby residents. In order to limit noise impacts to the nearby residents, a mitigation measure is recommended that limits construction activity from 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 2 0 Participants of the games being played on the athletic field, along with spectators, will generate noise in the form of yelling and cheering. This noise may be heard by the residents to the north of the site. According to the applicant, the number of games to be played will be very limited, perhaps two games per week. The games will be played during daylight hours, and then only during good weather. Use of the playing field will be limited to church members and to church league games. The applicant estimates that there will only be three to four church league games played per year. The playing field will not be open to the general public (i.e., Paradise Recreation District). Due to the low, number of times that the playing field will be utilized no significant noise impacts are anticipated. Traffic Circulation Impacts The project site has a driveway on Pentz Road and on Safari Lane. The site interior road is one-way, with vehicles entering from Safari Lane and exiting onto Pentz Road. Pentz Road at the site is two lanes, with no center turning lane. The vehicle speed on Pentz Road at the site is 35 MPH. There is excellent site vision of Pentz Road in both directions from the site driveway. According to the applicant, most church members live in Paradise, to the north of the site, and make a right turn into Safari Lane to access the site. Most vehicles exiting the site make a left turn onto Pentz Road from the driveway on Pentz Road. The number of vehicle trips that the project will generate is not expected to create any significant impacts on Pentz Road because the proposed gymnasium and athletic field will not be open to the general public. Church members will be the primary users of the proposed facilities, but church league games may be played on the athletic field. According to the applicant, the number of games to be played will be very limited, approximately three to four games per week. The applicant estimates that there will only be three to four church league games played per year. No games will be played at the same time as the church is in session. The Public Works Department reviewed this project and determined that the project will result in a significant number of vehicle trips that warrants the installation of a left turn pocket on Pentz Road at Safari Lane. The applicant would be responsible for the installation of the left turn pocket. The applicant stated that the left turn pocket is not needed because most vehicles coming to the church arrive from the north (from Paradise) and make a right turn onto Safari Lane to access the church. The addition of the athletic field and the gymnasium to the site is not expected to significantly change this traffic pattern. After discussion with the Public Works Department on this issue, it was determined that the applicant could either construct the left turn pocket or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project to the Public Works Department for review, and comment. The purpose of the estimate/analysis is to determine if the project will generate a significant amount of vehicle traffic that warrants the installation of a left turn pocket or other road improvements on Pentz Road. If the traffic estimate determines that a left turn lane or other road improvements are needed, the applicant is required to construct the improvements prior to issuance of the Use Permit. ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 3 ■ ACTIONS FOR CONSIDERATION: Staff recommends that the Planning Commission take the following actions: I. Adopt a Mitigated Negative Declaration regarding environmental impacts, with mitigation measures 1 through 4, as detailed in this agenda report, and authorize the Chair to sign, with the following findings: A. Find that an Initial Study was completed in compliance with the California Environmental Quality Act, that said study identified potential significant environmental effects and includes mitigation measures that would mitigate such effects below significant levels, and that a Mitigated Negative Declaration is proposed. B. Find that the Planning Commission has considered the proposed Mitigated Negative Declaration, together with comments received during the public review process. C. Find, on the basis of the whole record before the Planning Commission, including the Initial Study and any comments received, that there is no substantial evidence that the Use Permit project for the Paradise Evangelical Free Church, as mitigated, will have a significant effect on the environment. D. Find that the proposed Mitigated Negative Declaration reflects the independent judgement and analysis of the County, which is the lead agency. II. The design of the proposed project improvements will not cause environmental damage to fish and wildlife or their habitat because the area subject to development does not contain any significant amounts of wildlife habitat. Therefore, a "de minimus" impact of finding regarding fish and wildlife and their habitat is hereby made. The collection of fees pursuant to Fish and Game Code Section 711.4(d)(3) and 14 CCR 753.5. is not required. III. Approve Use Permit 01-15 for the Paradise Evangelical Free Church, subject to the conditions found in Exhibit A, with the following findings: A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: 1. The athletic field will not be lighted. 2. Measures are required to be taken during. construction activities to prevent fugitive dust emissions. ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 4 ■ 3. The times of construction activities are limited to prevent significant. noise impacts to nearby residents. After construction, the project will not create any significant noise impacts. 4. The project will not create a significant aesthetic impact because the proposed improvements will not be easily seen from a public road. 5. Use of the athletic field and gymnasium is limited to members of the Paradise Evangelical Free Church and to church leagues. 6. A drainage plan, which provides for no net increase in surface water runoff from the site, and a soil erosion control plan are required to be submitted to the Public Works Department for review and approval. 7. The applicant is required to submit to the Public Works Department an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements for vehicle traffic generated by the project. If the traffic estimate/analysis determines that a left turn lane or other road improvements are needed, the applicant is required to construct the improvements prior to issuance of the Use Permit B. The project is consistent with the AR -1 zone, which allows quasi -public uses with a Use Permit. C. The Low Density Residential General Plan land use designation allows quasi -public uses as Secondary Uses. K:\PLANNING\PROJECTS\UPC\EVANGEL\EVANGEL.RPT ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 5 ■ EXHIBIT A USE PERMIT BUTTE COUNTY PLANNING COMMISSION DATE: (Certified Mail Rec.) UP 01-15 PERMIT NO. 055-290-083 ASSESSOR'S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the County of Butte and the special conditions set forth below, the Paradise Evangelical Free Church is hereby granted a Use Permit in accordance with the application filed for an athletic field (baseball, soccer, etc.), a 500 square foot restroom adjacent to the athletic field, and a 6,000 square foot gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms. The project will involve the grading of approximately 2.2 acres of land. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit, constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65. 2. Unless otherwise provided for in a special condition to this use permit, all conditions must be completed prior to or concurrently with the establishment of the granted use. The use granted by this permit must be established within 24 months of the delivery of the countersigned permit to the Permittee. 3. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works, or their respective designee, upon receipt of a .substantiated written request by the applicant. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If any use for which a use permit has been granted is not established within two years of the date of receipt of the countersigned permit by the Permittee, the permit shall become null and void and reapplication and a new permit shall be required to establish the use. 5. The terms and conditions of this permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 6 ■ Conditions of Approval: Planning Division 1. Measures shall be taken to control fugitive dust emissions from all civil construction associated with development of the site. Standard Mitigation Measures to prevent or reduce fugitive dust emissions can be obtained from the Butte County Air Quality Management District. (Mitigation Measure) 2. Grading to create level areas for the athletic field and gymnasium is allowed. Prior to any soil disturbance, prepare a Best Management Plan to address erosion control during site preparation and building construction. The erosion control methods proposed shall be methods accepted by professional civil engineering practices and prepared by a registered civil engineer. The plan shall make provisions to stabilize all disturbed soil that is subject to erosion, prior to the onset of the rainy season (November 15). If work is to be performed during the winter (November 15 - April 15), a temporary erosion control plan shall be established and implemented on a daily basis to provide for interim measures for periods of rain. The Best Management Plan shall be submitted to the Department of Public Works for review and approval. The applicant shall submit a copy of the approved Best Management Plan to the Planning Division and the Building Division. No clearing or land disturbance shall take place until the Planning Division and the Building Division have received a copy of the Best Management Plan. (Mitigation Measure) 3. All development activity shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, and 10 a.m. to 6 p.m. Saturday, Sunday, and holidays. (Mitigation Measure) 4. Prior to use of this project, the applicant shall contact the Planning Division for a field inspection to verify all conditions of approval and ordinance requirements have been met. 5. Use of the athletic field and the gymnasium shall be limited to the members of the Paradise Evangelical Free Church and church leagues. Use of the facilities by the general public and by any public recreation district shall not be allowed. 6. Lighting of the athletic field shall not be allowed. 7. The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is date- stamped February 13, 2001, and is incorporated herein by this reference. Public Works Department 8. Prior to the issuance of the Use Permit obtain encroachment permits for County Standard S- 18 road approaches and construct them to County standards, as specified in, County Improvement Standards. ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT N PAGE 7 0 9. Prior to the issuance of the Use Permit, and under permit from the Public Works Department, construct a left turn pocket on Pentz Road or provide an estimate and analysis, prepared by a registered engineer, of traffic generation and turning movements to the Public Works Department for review and comment. Any road improvements identified in the analysis as being required shall be installed by the applicant prior to issuance of the Use Permit. 10. Prior to. the issuance of building permits for the gymnasium a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility.. A copy of the approved plan shall be submitted to the Planning Division and the Building Division. (Mitigation Measure) Fire Department 11. Prior to the issuance of a building permit for the gymnasium, prove that adequate fire flow is available to meet the increased area. This may require the installation of an additional fire hydrant. Building Division 12. Building permits required. Prepare 4 sets of construction plans and make an application for permit. Construction shall comply with federal, .state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. 13. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 14. Proposed improvements shall comply with Title 24 energy conservation -regulations. Appropriate compliance forms (two. sets) shall'be submitted indicating compliance with those standards. 15. Proposed improvements shall comply with Use Permit conditions applicable to construction. 16. Proposed improvements shall comply with Public Resources Code 4290 Fire Safe Construction standards. 17. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District fees, Water and Sewer Service Fees, Permit and Plan Check fees, and Fire Protection Fees. ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 8 ■ Environmental Health Division 18. Under County permit, upgrade the existing septic systems to accommodate increased development. 19. Prior to issuance of the Use Permit, obtain approval fro the Del Oro Water Company that they are able and willing to provide the necessary flows to service the entire project. Other Conditions 20. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. I hereby declare under penalty of perjury that I have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. Dated: Applicant NOTE: Issuance of this Use Permit does not waive requirement of obtaining Building and Health Division permits before starting construction, nor does it waive any other requirements. , Butte County Planning Commission Chairman CC: Land Development Division Building Division Environmental Health Department Butte County Fire Department/CDF Assessor's Office ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 9 ■ A11h, e" el ............ ' 51. -1E-. .1 Ell 4,7 ' e'e ee ee e" /e. e`1 - A- YX ""I" e I e. e, J Project Location J V X% 7/" %• e X" f1 .1 /ee e e e/ /X I e .4 A ............ H-C /e e• e "ee , .* . .......................... Ve e e -- ----- ----- - ----- ------------- J ea 4.37 ac 8.62 ac /* ac ;e FR-40 4 —J AR-1 -------------------------------- 500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 Feet BUTTE COUNTY PLANNING CONEMRSSION Applicant: Paradise Evangelical Free Church Owner: Same Hearing Date: April 26, 2001 @ 9:30 am. Existing ZonezAR-1 (Agricultural Residential, I acre min) N Supervisorial Request: Use Permit to allow 6,000 sq.fL gymnasium with restroom and shower facilities and an athletic field. The District # 4 gymnasium will also serve for sunday school classes. -Assessor Parcel No: 055-290-083 File: UP 01-15 Project Location 500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000`Feet BUTTE COUNTY PLANNING CONMUSSION Applicant: Paradise Evangelical Free Church Owner: Same Hearing Date: Apri126, 2001 @ 9:30 a.m Eidsting Zone;AR 1(Agricultural Residential, 1 acre min) N Supervisorial Request: Use Permit to allow 6,000 sq.fL gymmasium with restroom and shower facilities and an athletic field. The District # 4 gymnasium will also serve for sunday school classes. Assessor Parcel No: 055-290-083 File: UP 01-15 Pine Ridge Park 5084 Pentz Road a Camping, RV & Mobile Home Community Paradise, CA 95969 (530) 877-0677 April 10, 2001 RECEMOVE03 APR 1 3 2001 Butte County Planning Commission BUTTE COUNTY PLANNING DIVISION 25 County Center Drive OROVILLE, CALIFORNIA Oroville, CA 95965 Dear Commissioners: I am sending this letter to support the Use Permit for the Paradise Evangelical Free Church to construct an athletic field, restrooms and a future gymnasium which will also serve as a Sunday school rooms. This area of Paradise is lacking positive things for our youth and community members to do. The Church will be providing a great service to the community by constructing these facilities. Sincerely, G M. Guard'n Owner n, c W. BUTTE COUNTY PLANNING COMMISSION NOTICE OF PUBLIC HEARING Notice is hereby given by the Butte County Planning Commission that public hearings will be held on Thursday, April 26, 2001, in the Butte County Board of Supervisors' Room, County Administration Center, 25 County Center Drive, Oroville, California, regarding the following item: ITEMS ON WHICH A NOTICE OF INTENT TO ADOPT A NEGATIVE DECLARATION WITH MITIGATION MEASURES REGARDING ENVIRONMENTAL IMPACTS HAVE BEEN GIVEN 9:30 a.m. - Paradise Evangelical Free Church, Use Permit to allow an athletic field (baseball, soccer, etc.) and restrooms, and for a 6,000 square foot gymnasium with restroom and shower facilities. The. gymnasium will also serve as Sunday school rooms. The project is proposed to be developed in three.phases: Phase 1 - Construction of the athletic field upon approval of the Use Permit Phase 2 - Restrooms (one to two years after approval of the Use Permit) Phase 3 - Gymnasiuiii:(two to five years:after approval of the Use Permit) The athletic field will be used for games held by members of the church and for church league games. The applicant does not propose to allow non -church leagues (i.e. Paradise Recreation District) to use the field. The applicant anticipates that the field will be used for organized games two to three times per week. The property is zoned AR -1 (Agricultural Residential - 1 acre parcels). The property is located on the north side of Safari Lane, on the northwest comer of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise. APN 055- 290-083 (SB) (UP 01-15) 9:30 a.m. - Dan Kennedy, Use Permit to allow a mini -storage business with outdoor vehicle and boat storage. The project also proposes .to allow two existing mobile homes approved for use as real estate offices to be used as dwelling units for two years after approval of the Use Permit. Fifty-six enclosed storage spaces will be provided, along with'.39 outdoor storage spaces for vehicles. According to the applicant the enclosed storage spaces are primarily intended for the storage of vehicles, but any items may be stored in these spaces. The mini -storage structures will be 9'/z feet tall at the rear, with a.21/z foot high parapet, and gradually sloping to a height of eight feet at the front.. The applicant proposes to paint the structures a red rust color, with off-white doors. 'The roofs of the structures will be galvanized metal. The mini -storage structures will abut the property line on the north and south sides. There will be a ten foot building setback from the west property line. Hours of operation will be daily from 7:00 a.m. to 9:00 p.m. One of the mobile homes will be used as the office for the mini -storage business and as the residence for a caretaker. The property is zoned H -C (Highway Commercial) and is located on the west side of Skyway, approximately 100 feet south of Fir Haven Drive, at 14435 Skyway, Paradise Pines. APN 064-660-012 (SB) (UP 01-16) The above mentioned applications, Initial Studies, and maps are on file and available for public viewing at the office of the Butte County Development Services Department, Planning Division, 7 County Center Drive, Oroville, California. For information call: (530) 538-7601 (Monday through Friday, 8:00 a.m. to 4:00 p.m.) Comments may be submitted in writing at any time prior to the hearing or orally at the meeting listed above or as may be continued to a later date. Upon action r taken by the Planning Commission on the project an appeal may be filed with the Clerk of the Board of Supervisors. The appeal period is 10 days. If you challenge the above application or applications in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the Planning Commission, at or prior to, the public hearing. BUTTE COUNTY PLANNING COMMISSION To be published in the Paradise Post on Thursday, April 5, 2001. Or PARADISE EVANGELICAL FCHURCH ... TRUTH TEACHING OF THE WORD RECEIVE13 2 Tim. 3:16,17 MAR 1...6. 2001 INGMAR JACOBSEN, Pastor (530) 877-4241 BURE v v+ N+c546 Vlv,tiiSldtY ORNILLE, JAUFORMA Stephen Betts Senior Planner Planning Division 7 County Center Drive Oroville CA 95965 Dear Mr. Betts; Re: Use Permit. Evangelical Free Church March 15, 2001 Further to our conversation yesterday, I would submit that we are not planning very many ball games on the proposed site. It would primarily be daytime use by children and young adults of our own congregation, perhaps twice a week in play or practice. As mentioned in our letter accompanying our application, we would like to accommodate possible church league games on occasion.. Such games would be few and far between at this site, perhaps three or four a year. As to lighting two years down the road, this is not essential to our function. Night games are not anticipated. If it would expedite the processing of the application, we would gladly withdraw that item. Thank you for your help. We would appreciate every effort you make to move this along as rapidly as is prudent. Ideally, we would like to see this work done in spring or early summer when conditions are optimum for compaction, dust control, etc. Yours truly, (Rev.) Ingmar Ja sen, Sr. Pastor. 5095 PENTZ ROAD • PARADISE, CALIFORNIA 95969 WE CARE, BECAUSE HE CARES ... ' BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVIC PLANNING DIVISION FEB 2 6 2001 TO: Calif. Department of Forestry BUTTE COUNTY FROM: Butte County Planning Division PLANNING DIVISION RE: Request for Comments on a Development Application: Paradise Evangelical Free Church, - DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. . If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit to allow an athletic field (bas soccer, etc.) with lighting and restrooms, and for a 6.000 sq. ft. gymnasium with restroom and shower facilities, The gymnasium will also serve as Sunday school rooms on property zoned AR -1 (Agricultural Residential - 1 acreapp rc lsl located on the north side of Safari Lane, on the northwest corer of Pentz Road and Safari Lane,at 5095 Pentz Road, Paradise , identified as APN 055-190-083. Supervisorial District No. 4.. THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - _ DEVELOPMENT REVIEW COMMITTEE ON June 14, 2001. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN February 28, 2001. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): 0 Date: Z , )--2 —v 7 County Center Drive - Oroville. California 95965 - 530-538-7601 - FAX 530-538-7785 - - -�` LAND OF NATURAL WEALTH AND BEAUTY March 15, 2001 Ingmar Jacobsen Paradise Evangelical Free Church 5095 Pentz Road Paradise, CA 95969 PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 FAX: (530) 538-7785 Re: Application Complete - Use Permit application for the Paradise Evangelical Free Church, APN 055-290-083, File # UP 01-15 Dear Mr. Jacobsen: Pursuant to Section 65943 of California Government Code, Title 7, Division 1, your project has been deemed "complete." Environmental review will be conducted within the next 30 days pursuant to the California Environmental Quality Act. Upon conclusion of environmental review, your project will be scheduled for action by the Butte County Planning Commission. You will be notified by mail of the date, time, and location of that meeting. Should you have any further questions regarding this letter, please contact me between the hours of 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely, �� Stephen Betts Senior Planner tte L A N D O F N A T U R A L W E A L T H A N D B E A U T Y 4m"` y�� f PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE OROVILLE, CALIFORNIA 95965 3397 TELEPHONE: (530) 538-7601 FAX: (530) 538-7785 March 15,.2001 Ingmar Jacobsen Paradise Evangelical Free Church 5095 Pentz Road Paradise, CA 95969 Re: Use Permit application for the Paradise Evangelical Free Church, APN 055-290-083, File # UP 01-15 Dear Mr. Jacobsen Thank you for the .submittal of the above referenced application received on February 13, 2001. Your project application, site plan, and related items have been reviewed by County Agencies in order to determine the completeness. of your application. Enclosed please find copies of the comments we have received from County agencies regarding your project. These comments have been received as part of the initial thirty day review of your project. Please review these comments and the conditions that are requested as part of the project's approval. Should you have any further questions regarding these comments, please contact me between the hours of 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely, Stephen Betts Senior Planner enc [I II 1 Il I� DISCUSSION OF_ ENVIRONMENTAL_ EVALUATION AP 55-29-21 lb,c: Preparing the property for construction.(vegetation removal, grading) will disrupt an estimated 2 1/2 acres. Overcovering by the church, parking lot and driveways may exceed 46,000 square feet.. Extensive grading will be required to level .the 8-15% slopes. Approximately 150 cubic yards will be excavated between the 1610 and 1620 ft. contours. The building slab will be put in 10'feet lowwr- than the natural elevation. Ten feet is in excess of the 2 foot maximum recommended to insure slope stability and minimize disruption of drainage patterns. le: Aiken soils are 'characterized by'.moderately slow permeability, moderate runoff and high erosion potential in their natural state. Vegetation removal and grading will greatly.accelerate"Wind and water erosion of soils. Appendix F - Page,6 Construction "spoils" (excavated materials) are subject to severe erosion if not disposed of properly and/or stabilized.. It is recommended that a full grading and E-osion *control plan be submitted to Planning and Public Works for approval. "Erosion and Sediment Control Guidelines" Aspo press, 1981 should be followed. If: Suils eroded off, -site will be eventually deposited into Dry Creek, 1000 feet west. j 2a: Increased traffic loads on Pentz-Magalia Highway will contribute to a reduction in local air quality. 3b: Construction of the church and parking areas will reduce soil absorption rates, %lter drainage patterns and increase storm water runoff. The natural sheet flow will be interrupted and channelized b.y the parking areas and walkways. Cut banks also interrupt sheet flow. These man-made features create points of concentration, whose outfall is highly susceptible to erosion. A drainage plan should be,submitted to Public Works and Planning for review. `s 3i;16c: The property is within Lime Saddle Community Services District. The district derives its water from two wells capable of producing 100 gallons a minute each during the winter and spring. ' During the summer and iall., production falls off sharply. The existing system is near capacity and another well..will likely be drilled in 1985. t A "will serve" letter from Lime Saddle is required to insure adequate watar supply .for sewage disposal, landscaping, etc. It, is doubtful Lime Saddle can commit to more hookups without bringinq,another well } on line. Appendix F - Page,6 AP 29-21 , 4a: A minimum of .15 yellow pines, average trunk diameter of 25", will ,be removed. Approximately 2 1/2 acres of brush anti young trees will be cleared. Provided native vegetation is retained";on the remainder, the species diversity will not be.significa.ntly reduced." 5d: The distance between Dry Creek and the church is sufficient to protect fist'. and wildlife habitat from undue disturt,ance. 6a,7: Noise and light Level's may increase in the ovenings and Sundays, to a slight degree. The primarynoise source will be from increased traffic., tae This property has been planned for residential development at rural densities (1 acre minimum). Churches are generally compatible with residential uses. 13: .Traffic generation for houses of worship on worship day'is estimated to be 40.9 trips per 1000 square feet of gross floor area. (7250 square feet t 1000)'x 40.9 =.297 The most current traffic count available (1983) for Pentz-Magalia Highway is 2300 immediately south of Country Club Drive. The cht -ch will increase Sunday traffic counts by 13%. This increase will warrant installation of a left turn pocket in Pentz-Mag,alia. To minimize potential- traffic hazards, access onto Pentz-Magalia should.be directly across from Arden and/or Wilderness Way.. Encroachment permits from Public Works will be required to insure adequate sight distance. Butte County.Code 24-35 requires construction of 51•parking spaces. 1 per classroom 6 1 per. office = 2 I -per 6 seats 256 t 6 - 43 51 Preliminary plot plan shows 62 spaces. 14a: California Department of Forestry has indicated a fire hydrant must be installed on-site to minimize potential hazards. L,)cation of the hydrant shall bra subject to their approval. 14b: The project has the potential to increase demand for.availa_ble police services. 14e: Increased traffic on Pentz-Magalia will place'"greater demands on road maintenance funds. Y Applicant: Paradise Evangelical' Free Church DATA_SHEET A. Project_Description • Assessor's Parcel h 55-29-21 Log q 85-04-05-01 1. Type of Project: Use Permit 2. Brief Description: To allow construction of a church in wn AR -MH -1 zone 3. Location: On the west side uf Pentz Road at Arden Way. south Paradise 4. Proposed Density of Development: 7254 square foot building and 62 space parking lot - 5. Amount of Impervious Surfacing: 1.1 acre 6. Access and Nearest Public Road(s): Pentz-Magalia Highway 7. Method of Sewage Disposal: Individual septic S. Source of Water Supply: Lime Saddle Community Service District 9. Proximity of Power Lines: At Pentz-Magalia Highway 14. Potential for further land divisions and development: Dependent on soil depth, water supply and obtaining another Use Permit B. Env-ironmental_Setting Ehysical_Env-ironment_ 1. Terrain a. General Topographic Character: Western slope of Upper Paradise Ridge b. Slopes: 8-15 within development area, 30% sloping into Dry Creek: C. Elevation: 1690-1200 ft. ASL d. Limiting Factors: Slopes over 20% 2. Soils a. 'types and Characteristics: Aiken 60-140", dark.. brown, loam, clay, moderately slow permeability, moderate runoff potential. b. Limiting Factors: Moderately acidic 3. Natural Hazards of the Land a. Earthquake Lone: 1500 feet south of Big Bend Fault b. Erosion Potential: High C. Landslide Potential: Moderate d. Fire Hazard: High 0. E;•pansive Soil Potential: Moderate -High Appendix F (a) Appendix F (b) c\ �. AP J, 2e-21 L 4. Hydrology a. Surface Water: Dry Creek adjacent to the west, West Branch Feather River 4000 feet east. .� b. Ground Water: Possibly limited resource C. Drainage Characteristics: Drains west to Dry Creek d. Annual Rainfall (normal): 45-50 inches; e. Limiting Factors: High rainfall, steep slopes, slow cyj permeability - 5. Visual/Sce,iic Quality: - 6. Acoustic Quality: Good 7. Air Quality:. Good a Glglogical_Enyironment_ ' S. Vegetation: Grasses, ceanothus, manzanita, poison oak, ponderosa pine, California black oak, scrub oak 9. Wildlife Habi,tat: - 4 Cultural_Env_ironment: 10. Archaeological and Historical Resources in thearea: Hiyh 11. Butte County General Plan designation: Low Density Residential• 12. Existing Zoning: AR -MH -1.. ' 13. Existing Land Use on-site: Open space 14. Surrounding Area: a. Land Uses: North: small store; East: mobile hcme pare; South: arts and craft supply; West: Dry Greek b.' Zoning: FI -C, FUD, AR-MH=1, Town of Paradise ,. C. Gen. Plan designations: Low Density Residential, Commercial d.' Parcel Sues: 1-2 1/2 acres off Wilderness'; Arden and', CouAtry Club, 20-25 acres west of Peng t e. Population: Low density t� 15. Character of Site and Area: Rural"fringe of Paradise 16. Nearest Urban Area: Paradise +/- 2 1/2 miles north 17. .Relevant Spheres .of Influencm:. Lime Saddle Community Services District 18. Improvements Standards Urban Area: Standard road approach 19. Fire Protection Service: a. Ilearest County (State) Fire Station: n.34, 5 miles north b. t4ater Avai`labitity: Fire hydrant across the street ,. 20. Schools in Area: Paradise Unified Appendix F (b) p, P . , Butte Co.Plmmh,q C,,,M JUNi 1985 orftalo, c'u11114 ARCHAEOLOGICAL SURVEY FOR THE PARADISE EVANGELICAL FREE CHURCH, BUTTE COUNTY, CALIFORNIA By. James P.' Manning . PROJECT DESCRIPTION: The proposed project is to construct a church and parking facility .on -approximately .30 acres of land, A•P:N. 55-29-21. Only a small portion ofthe property, near the eastern boundary, will be impacted by the proposed,project. PROJECT APPLICANT: Paradise Evangelical Free Church PROJECT LOCATION: The project site is located adjacent to the west side of Pentz-Magalia.Highway across from the intersection with Wilderness Way, southeast of the City of Paradise. The project site covers a portion of the SWI. of Section 30, T. 22 N., R. 4 E., Cherokee Quadrangle,. '5' series. PRIOR DATAREVIEW: The archaeological, site record files maintained by the California Archaeological Inventory,, Northeast Information Center were consulted to determine if any previously recorded cultural resources were located within, or adjacent to, the project area. No previously recorded cultural resources were located.within, or adjacent to, the project site. DATE OF FIELD INSPECTION: May 21, 1985 ENVIRONMENTAL SETTING: The project site is located along the eastern side of Dry Creek Canyon. The western portion of the property lies along the steep canyon wall, while,the eastern portion has a gentle to moderate slope.: The vegetation consists of a mixture of yellow pine and Black Oak with dense chaparral along the.steep slopes. No drainage channels or structures are located within the, property area. SURVEY METHODOLOGY: The focus of the survey was a visua� inspection of the ground surface for materials or features indicative of prehistoric or early historic activities:: The survey -was accomplished by walking a.series of linear transects with a ten meter interval spacing over the portion of the property area that will be impacted by the proposed project. CLI? RwwpdJ" C ¢Ike o Oonmmmu P.O, a o� 9409 Ql�6¢o,Cw9g9��.94G9 DG��99CiB 949�9gt� _ LAFCO BUTTE COUNTY FEB 15* Zoog DEPARTMENT OF DEVELOPMENT SERVICES 9 PLANNING DIVISION 0roVlllB, CBlifomla TO: LAFCo FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Paradise Evangelical Free Church, UP 01-15 DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received.a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well 'as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities The gymnasium will also serve as Sunday school rooms on property zoned AR -1 (Agricultural R .sidontial - 1 - acre parcfd4 located on the north side of Safari Lane, on the northwest corer of Pent? Road and Safari Lane at 5095 Pentz Road, Paradise , identified as APN 055-190-083. Supervisorial District No. 4. 093 D 3 THIS ITEM HAS BEEN TENTATIVELY` SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - _ DEVELOPMENT REVIEW COMMITTEE ON June 14, 2001. COMMENTS, IF ANY, ARE REQUESTED.BY NO LATER THAN February 28, 2001. If no comments or communications are received by the above date,.the:assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): I. Pataa«e C—enAr st Dist S• 1{(4�t i�11etL GD/IAC[f�son . By: -I.t- �s,c� i Date: z s o 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538-7785 -_ rJili it .il l�� •\ �• F E B 1 5 2001 BUTTE COUNTY ?�,y DEPARTMENT OF DEVELOPMENT SERVICES Chico, Califomla PLANNING DIVISION f TO: Environmental Health �ylM., FROM: Butte County Planning Division RE: Request for Comments on a Development Application: -Paradise Evangelical Free Church, LSP 5 DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the proje,:t and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for on property zoned AR -1 (Agricultural Residential - 1 acre parcels) located on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane at 5095 Pent? Road, Paradise , identified as APN 0554W -O8 Supervisorial District No. 4. ST -C2910 X83 THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - —DEVELOPMENT REVIEW COMMITTEE ON June 14 , 2001. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN February 28, 2001. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): By:L I t G'y7L�t/ l (T fv� Date: 0 REcERVED FEB 2 & 2001 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538-7785 BUTTE COUNTY PLAW.gING DIVISION OROVILLE, CALFORNIA Memo To: Stephen Betts . From: Michael Huerta�-4 CC: Date: 02/26/01 Re: Use Permit for Paradise Evangelical Free Church Please include the following conditions: 1. Under county permit, upgrade existing septic systems to accommodate increased development. 2. Before issuance of Use Permit, obtain approval from Del Oro Water Co. that they will able and willing to provide the necessary flows to service the entire project. The aforementioned conditions will require complete applications submittals from the applicant and more than likely require the services of a licensed professional to do engineering and flow calculations. 0 Page 1 2525 Dominic Drive, Suite J Chico, California 95928 (530)891-2882 (530)891-2878 Fax February 26, 2001 Stephen Betts, Butte County Department Development Services Planning Division 7 County Center Drive Oroville, CA 95965 Re: UP -01-15 Dear Mr. Betts: Lawrence D. Odle Air Polluticu Control Officer W. James Wagoner Asst. Air Pollution Control Officer The District has reviewed the request for comments for a use permit to allow an athletic field, restrooms, and for 6,000 square foot gymnasium with restroom and shower facilities to be located at 5095 Pentz Road in Paradise, CA. Based on the information submitted the District recommends incorporating measures to control fugitive dust emission from all road and other construction activities during project improvements. Measures may include site and driveway watering and/or use of other acceptable soil palliatives. Thank you for the opportunity to comment on the proposed project. If you have any questions, please contact the District at 891-2882. Sincerely, N Gail Williams Air Quality Planner File No 3451.1 f:\apps\wpdo s\eir\bcup0115.doc MAR :� 2 2001 BUTTE COUNTY PIAiNNING DIVISION OROVILLE, CALIFORNIA • • BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION TO: Town of Paradise, Planning FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Paradise Evangelical Free Church, UP 01-15 DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit to allow an athletic field (baseball, soccer.,etc,) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasium will also serve as Sunday school rooms on property zoned AR -1 (Agricultural Residential - I acrean roW located on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise., identified as APN 055-190-083. Supervisorial District No. 4. THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - _ DEVELOPMENT REVIEW COMMITTEE ON June 14, 2001. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN February 28, 2001. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): �le�.s e re r -fv e— o .rz, k TOWN OF PARADISE COMMUNITY DEVELOPMENT DEPT. By: al )w : Date Tow,,, of 41414;�$e re e- iZ /.Za J-0/ RECEIVED 8 2001 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538-7785 BUTTE COUNTY PLAINNING DIVISION OROVILLE, CALIFORNIA MEMORANDUM TO: Stephen Betts, Senior Planner Butte County Planning Division FROM: Al McGreehan, Community Development Director SUBJECT: Paradise Evangelical Free Church [UP -01-15] Expansion Project at 5095 Pentz Road; AP NO. 055-190-083 DATE: February 22, 2001 Thank you for affording the Town of Paradise the opportunity to review and comment upon the above -noted development project application. Based upon the information that you have provided it is our understanding that the proposed project entails a outdoor and indoor church related facilities expansion that is to be developed in "3 phases" during a five-year period and that consists of: 1) a 2.0 -acre outdoor athletic playfield, 2) a 500 sq. ft. bathroom building, and 3) a 6,000 sq. ft. gymnasium building. After carefully reviewing this proposed project the following observations and comments are hereby offered on behalf of the Town of Paradise: 1. The project site is located along Pentz Road and approximately 600 feet due south of the Town limits. 2. This property is situated within a land area that is identified as the "Secondary Study Area" of the Town adopted 1994 Paradise General Plan. The "Secondary Study Area" encompasses the existing Butte County LAFCo adopted "Sphere of Influence" area boundary for the Town of Paradise. . 3. The Paradise General Plan has assigned a "R -R" [Rural -Residential} land use designation to the project site location. 4. Given the scope and magnitude of this proposed project it is recommended that a detailed "Initial Study" of the project's environmental effects be conducted. Potential impacts, both singular and cumulative, that should be addressed include, but may not be limited to: effects upon existing Town of Paradise facilities or services such as fire and police protection currently provided via mutual aid agreement, increased traffic and maintenance of town roads, and effects'. upon local recreation district facilities and/or services, additional water supply demand upon the Del Oro water company, etc. FEB 2 8 2001 BUTTE COUNTY PLANNING DIVISION OROVILLE, CALIFORNIA p 0 Page 2 5. In order to acquire a better fire insurance rating and lower fire insurance premium costs, the project proponent should seriously consider annexing the project property and possibly the northerly abutting property to the Town of Paradise. It is recommended that Butte County planning division staff route this proposed project for review and comment to not only the Del Oro water company but also the Paradise Recreation & Park District. Lastly, it is also requested that the Town of Paradise be sent a copy of the environmental document that is prepared for this proposed project and that shall be offered'to your Butte County land use decision-making body for certification. cc: Paradise Planning Commission Jim Broshears, Paradise Fire Chief Paul Walters, Paradise Police Chief Dennis Schmidt, Public Works Director Chuck Rough, Town Manager A- 5 BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION TO: Public Works FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Paradise Evangelical Free Church, UP 01-15 DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2.. Determine the appropriate environmental documents to prepare for this project, as well as to identify particula environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit to allow an athletic field ( ac ball soccer,etc) with lighting and restrooms, and for x6.000 sq ft g}ith restroom and shower facilities. The gymnasium will also serve as Sunday school rooms on property zoned AR -I (Agricultural Residential - 1 acre_amcels) located on the north side of Safari Lane, on the northwest corner of Pentz Road and Safari Lane. at 5095 Pent? Road Paradise , identified as APN 055-190-083. Supervisorial District No. 4. THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) PLANNING COMMISSION - _DEVELOPMENT REVIEW.COMMITTEE ON June 14 , 2001. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN February 28, 2001. If no comments :)r communications are received by the above date, the assumption will be made that your agency has no comment. LE :NTS (Attach additional pages if necessary): Date: 2-1, zAov/ RECEIVED ;;ECr=JVE � 3 200'i 7 County Center Drive - Oroville, California 95965 FRVI( ooa FAX 530-538-7785 FEB Z N o )pEEVELOpMENT DN. BUTTEp OVII.L=, CAL FIORNIA ISIO BUTTE COUNTY STANDARD CONDITIONS FOR USE PERMIT APPLICANT: Paradise Evangelical Free Church DATE: February 14, 2001 AGENT: APN: 055-190-083 FILE #: UP 01-15 PLANNER: Stephen Betts PROJECT DESCRIPTION: Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms, and for a 6,000 sq. ft. gymnasium with restroom and shower facilities. The gymnasiurr_ will also serve as Sunday school rooms Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS A. STREETS Ste! S-i� road 1. Prior to the issuance of building permits obtain encroachment permit for - approachesend construct them to Count standards, as specified in County Improvement Standards. o� )'f' tv r'i- p Uc—f 2. Prior to the issuance of building permits deed to Butte County, in fee simple, 4-0 feet of right-of-way from the centerline of Q"4 . The right of way shall b,- sufficient .sufficient for the installation of standard No. S-5 at all street intersections. 3. Prior to the issuance of building permits submit road and drainage improvement plans for the installation and construction of the street frontage improvements on to standard, including but not limited to P.C.C. curb, gutter and sidewalk and the required street section fa- parcels aparcels with gross acreage of one acre or less. Construct or install the required improvements. 4. Prior to the issuance of building permits dedicate a one foot "no access strip" or relinquish abutters rights to Butte County, along the frontage of parcels , except at approved access points. B. DRAINAGE 1. Prior to the recordation of the issuance of building permits a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or public}y maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. 2.. Prior to the issuance of building permits establish 100 year floodplain elevations and the lowest floor elevations for any structures. Show on the site plan map for building permits the elevations (by contour) and the location of an accepted NVGD benchmark and a temporary benchmark. on-site. C. LEGAL LOT STATUS 1. Prior to the issuance of the Use Permit, prove, to the satisfaction of the Director of Public Works, that t1he parcel of the subject application is a legal parcel. RECEIVED FEB 1 5 2001 . COLINTY OF BUTTE LAND DEVELOPMENT DIV. } RECEIVE® =` BUTTE COUNTY FEB 1 :5'.X01 DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION Bb�E0R0 ju PGDIVISION AUF08NIA TO: Building Manager FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Paradise Evangelical Free Church, UP 01-15 DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particu)hr environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit to allow an athletic field (baseball, a_occer, etc.) wi h 1'ghtine and restrooms, and for a 6.000 sq. ft. gymnasigm with restroom and shower facilities. The gymnasium will also serve as Sunday School rooms on property zoned AR -1 (Agricultural Residential - 1 acrean rceW located on the north Side of Safari Lane, nn t -e northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise., identified as APN 055. Supervisorial District No. 4. 2� THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - —DEVELOPMENT REVIEW COMMITTEE ON June 14 , 2001. COMMENTS, IF ANY, ARE REQUESTED BY .NO LATER THAN February 28, 2001. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessar 5S* *MAOM 4 , pmt 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538-7785 PROPOSED USE PERMIT STANDARD CONDITIONS Building Permits Required. Prepare sets of construction plans and make an application for permit, Construction shall comply with federal, state, and local regulations. Plans shall be prepared, sealed and signed by a California Licensed Architect or Registered Engineer for non-residential buildings and certain residential buildings. Proposed improvements constitute a "change in use" or "change in the character of use" as stated in the building code. Improvement plans shall incorporate all code -required elements for the new use. 3. All structures shall be made accessible to the disabled. Disabled accessible parking and an accessible path of travel shall be provided. 4. Proposed improvements shall comply with Title 24 energy conservation regulations. Appropriate compliance forms (two sets) shall be submitted indicating compliance with those standards. Proposed improvements shall comply with Butte County Code and FEMA Flood Hazard Prevention regulations. A FEMA Elevation Certificate, prepared by a qualified professional, shall be completed and submitted with improvement plans to the Building Division. Proposed improvements shall comply with recorded map conditions applicable to 6. o construction. 0 Proposed improvements shall comply with Public Resource Code 4290 Fire Safe Construction standards. 8. Development fees for the proposed residential or non-residential improvements shall be paid prior to the issuance of building permits. The fees shall be those in effect at time of application, and shall include, but not be limited to, School Fees, Park and Recreation District Fees, Drainage Fees, Water and Sewer Service Fees, Permit and Plan Check Fees, and Fire Protection Fees. *-—r 0 BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION TO: FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Paradise Evangelical Free Church, UP 01-15 DATE: February 14, 2001 CONTACT PERSON: Stephen Betts The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit to allow an athletic field (baseball, soccer, etc.) with lighting and restrooms and for a 6,000 sq. ft. gymnasium with restroom and shower facilities The gymnasium will also serve as Sunday school rooms on property zoned AR -1 (Agricultural Residential = 1 acre an reels) located on the north side of Safari Lane on the northwest corner of Pentz Road and Safari Lane, at 5095 Pentz Road, Paradise , identified as APN055T. Supervisorial District No. 4. THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - _ DEVELOPMENT REVIEW COMMITTEE ON June 14, 2001. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN February 28, 2001. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): By: Date: 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538-7785 APPLICATION: ' DATE: County Offices and Cities: _Chief Administrative Officer _X Environmental Health . Sheriff LAFCo Biggs Oroville Irrigation District: Butte Water _ OWID Table Mountain Irrigation Domestic Water Butte Water District OWID Sewer • COMMENT DISTRIBUTION LIST X�velop. Services Director X_ 1/sessor �AG Air Quality Mgmt. _ ridley Paradise Animal Control Butte Water District Skansen Subdivision (CSA 21) Fire Protect' _X_ ' Califomia Department of Forestry Recreation Districts _ Chico Area Recreation _ Paradise Recreation & Park Utilities Biggs/W. Gridley Water Paradise Irrigation Thermalito Irrigation � blic Works Director �C Building Manager ALUC Butte Co. Farm Bureau Chico Chico Airport Commission Durham Irrigation Richvale Irrigation Other Califomia Water Service Co. JZDel Oro Water Co. Thermalito Irrigation District . _ Other Themalito Irrigation L.O.A. PUD El Medio Fire Protection District Durham Area Recreation Richvale Recreation & Parks Sterling City Sewer Main Feather River Rec. & Park _ PG&E North - Chico _ Chambers Cable TV Pacific Bell PG&E South - Oroville _ _ Viacom Cable TV State Agencies _ C Trans (Traffic) _ _ orestry (Attn. Craig Carter) _ Central Reg. Water Quality Cont._ Dept. of Water Resources � Dept of Parks and Rec. _ Caltrans, Aeronautics Program Dept. of Fish and Game Highway Patrol _ Department of Conservation_ Off. of Mining Reclamation _ Off. of Governmental & Env: Relations Dept.Social Services, Comin.Care Licensing Federal Agencies US Forest Service _ US Bureau of Land Management _ US Fish & Wildlife Service Army Corps of Engineers Other Districts, Agencies, Committees, etc. Lime Saddle Dist Community Association _ Mosq. Abatement. OrovilleButte Co _ _ Drainage _ Butte Env.l Council _ Paradise Pines Com. Assoc. Reclamation _ Cal Native Plant Society _ _ Butte Co. Mining Committee _ Forest Ranch Community Assoc. _ _ Butte Ck. Watershed Conservancy_ School Districts LEAD IN SHEET FILE NO: 6z -v Ol f� AP# b Sq-- 22 O - 08-3 APPLICANT: OWNER: ' REPRESENTATIVE: art q}tilc�\c . ,REQUEST:ysc- 1Pcrryli�� - o cl�ea Wil\ �'��\d �oasc��l� SaceQc-. -A-c-) `gy%n -zona c^cr V'es��-eoms etr\ck Ca l0.000a►vy.�.nQSi�rn �Stre-s -roan a,�d S1�o�+�r-Fac�I:�i�s. 'Tlnc Qyv�nnQs��r,� w�1\ Q\so sR�v4L ns S,j,nday Sclnoo\ SIZE: 7.0 c�c�cy LOCATION: On v%-rkh Sicre- of 6a-2ewi l.-4ne-- , ov. }ht- tisy\or-+4 #4 Co r n cr o4 den 42 RaaA anti f:�QActr i Lane. cast SO4S- Pen" Road., RQ rack i Sc SUPERVISORAL DISTRICT # EXISTING ZONING:a-- ZONING HISTORY: SURROUNDING ZONING: SURROUNDING LAND USE: SITE HISTORY: GENERAL PLAN DESIGNATION: APPLICABLE REGULATIONS: PARADISE EVANGELICAL : FREE CHURCH . TEACHING THE WORD OF TRUTH 2 Tim. 3:16,17 INGMAR JACOBSEN, Pastor (530) 87'-4241 APPLICATION FOR USE PERMIT February 12, 2001 To Whom 'It May Concern: It is our desire to develop our Church property in three phases. Phase I. Immediate. Level an area of.about 300 feet square north of our present sanctuary to use as an athletic field, i.e. ball diamond, soccer field, etc. This would involve moving 7,000 to 8,000 yards of dirt. There would be a cut of about 8 feet at the upper end and about an 8 foot compacted fill at the lower end of the square. The area would be seeded to a suitable type of perennial grass. Straw bales may be used to prevent wash. We would build a backstop and wooden -bleachers on each side. The primary use would be for our congregation and possibly Church league games. Traffic would not likely be more than we have on Sunday morning. We have adequate parking for such events. Phase U. One,to two years. Add lighting and bathroom facilities, approx. 500 sq. ft. Phase III. Two to five, years. Build a gymnasium of approximately 6,000 sq. ft. It would include bathrooms and shower facilities.It would be equipped with portable room dividers to serve as Sunday School rooms for children of Junior to High School age. Rev. Ingmar Jacobsen, Senior Pastor. FE 6�NN NG O v S pN p�P 5095 PENTZ ROAD • PARADISE, CALIFORNIA 95969 WE CARE,. BECAUSE HE CARES ... I ,1,73,7 APN pr,Prs�� Evgtil�e free C�ture� ES77 - Y 2.'l ( csS , 14 os de's',t i✓gid 4 SRFARI LA�1� a............ cf� LIL .p r e e 4-1 {s---- C, r ao � s CIC t.J a p C� Z O 2j o p cn m O U W 2 ~2 p V m W ~z m J a i...J 4-1 {s---- C, r ao � s CIC Dr y CY-ae )1 .......... _.. cn o . r� Dr y CY-ae )1 N „l LM.f { ;.v 0 33 o .rt Fjet;� -t+ N7 Q \ •'/• �� J .7 �� `moi � ,40r "Ile — tj S-te r e - .� Q rout urq�f prePas•d i ' '' J � � _ W4s1� roe�g oo �T It . asaA JL va -..g-tCi,, I free C►ture �it�yr�4rV Qca6ss,l $TT-Y2.i( Gym S( _ s d41 e`S 3; SAF• ARI LA)4P-! Q / 4 cl. As oYy c--ael1 Ul cc N V � Z Q � N O C) W W U � Z m Z CX)Icca As oYy c--ael1 Ul cc N S. 112 OF SE C. 2 6 r. 22 N. R 3 E. Al. D. B. a M. . � -- �- � v t3 � P _ -L•r�p r3 5s- /9 '1�� 23 ! / CENTER Of, SECT/ON 26 lk '/i ',To "s ' ��:�3.'�' , CtrtciE �anrE — -- — — /Jl31la /`39 — 2 •2.97AC4.75AG t ! V 3 , / 1 ., s:AAc / tAC mS ®� • V �O ® / O :os.a �bsss Q . i 254.966 2O otter Mots3 28f. 45 20 AC Y f� . �•:: a m� :::: 4 ss �• 53 Wil' • Z 60� n •3• - Z09AC 2.J6Ae — 46-CS6 - sV 2002.02 28r.6� i j I 1 I 1 2 10'5.09 r. I� 53 9.98 At _ - -----1 1 1 y ! , " Q II RI/2 ! 12onc O h 3 - (P7N ',521./ i / Pon29.04 AC' / ' 3Jis i '! ? �"' P/M 55-14/14D 02-%_49_!1 -�I1i 1DI9 Q/i C i ! 2.4 Woe (PTN 3h -4616 I ° -X95.36 / g 12@313) -- ---- N ' O 9.28 AC ; 1 77 46 /20 AC I 23.06 AC I 17.43 AC � f ° 'Cob, 6 AB4 AC. �. 1 1135.74 -.... 1 !330.6 2 2 '> ti AC • N Q 7012. /B �1'' % y 2zo Ac. O: 2 5. AC I b •223A - ii �j� 57 2.57AC 1 Q .2..5 Ac : • 215 AC 2.53AC • — - 3I—.—/p, �438.BS 23d Ql4.1/ , COUNTY OF BUTTE o OFFICE OF PLANNING DEPARTMENT 7 COUNTY CENTER DRIVE o APR O.a'0-1 ..a OROVILLE, CALIFORNIA 95965-3397 a co a �" Lc 0. B METER o 7034680 U.S. POSTAGE RETURN SERVICE REQUESTED PUBLIC - -- LUNDGREN JOHN A & KATHLEEN C HEARING 'CLINTON6369 ' ', 6368 AMI�RST WAY MAGALIA LUND368 959541158 1101 17 04/06/01 RETURN TO SENDER NOTICE LUNDGREN 225 NE ERNST ST SPC 63 $ y..OAK MARBOR WA 98277_ 2540 RUt7P L t PRESORTEL FIRST CLASS w. t PRESORTEL FIRST CLASS "COUNTY OF BUTTE W y l� A v o OFFICE OF PLANNING DEPARTMENTir ,� 7 COUNTY CENTER DRIVEN 4 APR 0 TO 1 �r — 4 .3 Z w " OROVILLE, CALIFORNIA 95965-3397 "1 � p � � ac d T8 METER a 7034680 U.S. POSTAGE RETURN SERVICE REQUESTED • F 55530020000 PUBLIC UREN DAVID & JEAN 5084 PENTZ RD #11 ` t PARADISE CA 95969 HEARING-- _ UREN084 959691090-1300 29 04/05/01 NOTICE FORWARD TIME EXP Rl N TO SEND UREN 5246 LAGUNA CT ' PARADISE CA 95969-6650 I1.(1*1Ito I111111I-IMii.1..111 fill III IIof11,11111 '