Loading...
HomeMy WebLinkAbout06.08.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Cannon, Jamie; Loeser, Kamie Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Monday, June 8, 2026 1:55:54 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, June 8, 2026 11:36 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/8/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address Comments C-1 and C-2 re Recommendation 2 from FERC's 5/11/2026 letter re the 2nd Part 12D Inspection Report re the Round Valley Dam, DeSabla-Centerville Project, P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260608- 5122__;!!KNMwiTCp4spf!GhOjMKXIGijzGUFjgoETCwFjmkGbVFWWyGRVfst19j5pxZnmdUG_cZ02ipAqOWismpMY_qAatW83GdfRdlti5V2Wj0-8TSF2ZLtm$ To modify your subscriptions, click here: 8TQlCLeli$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GhOjMKXIGijzGUFjgoETCwFjmkGbVFWWyGRVfst19j5pxZnmdUG_cZ02ipAqOWismpMY_qAatW83GdfRdlti5V2Wj0- 8TXdVrwPZ$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 8, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Second Part 12D Inspection – Recommendation 2 Summaries and Conclusions for FERC Comments ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1 and C-2) regarding Recommendation 2 (R-2) from the second Part 12D safety inspection report (dated October 2020) for Round Valley Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comments in a letter dated May 11, 2026. PG&E's responses to C-1 and C-2 are enclosed with this letter (Enclosure 1). PG&E believes Comments 1 and 2 have been satisfactorily addressed based on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for FERC Comments Regarding the Supporting Technical Information Document from the Second Part 12D Inspection Report