Loading...
HomeMy WebLinkAbout06.04.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Thursday, June 4, 2026 1:46:07 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, June 4, 2026 9:36 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/4/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives Delegated Order Description: Letter to Letter to Pacific Gas and Electric Company accepting the 05/15/2026 plan and schedule to address FERC's Comment No. 1 for the Low-level Outlet Modification of Bucks Lake Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260604- 3028__;!!KNMwiTCp4spf!Aj1wqK76dRbqrLd985dSiTuXCQJd5V3KNHePRWnrdNQjubrBrA_ev6S2Ulvfc-U6cB4qcArmJct4sM7b7A29gAj6Tpya8JYtsb7a$ To modify your subscriptions, click here: U6cB4qcArmJct4sM7b7A29gAj6Tpya8Hs7Rma9$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Aj1wqK76dRbqrLd985dSiTuXCQJd5V3KNHePRWnrdNQjubrBrA_ev6S2Ulvfc- U6cB4qcArmJct4sM7b7A29gAj6Tpya8CSrFZVl$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office June 4, 2026 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Updated Plan and Schedule for Low-Level Outlet Modification Dear Mr. Cruzen: This is in response to a letter dated May 15, 2026,from Mr. Kyle Ingvoldsen,that submitted an updated plan and schedule to address our comment 1 for the Low-level Outlet Modification of Bucks Lake Dam, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619.Your plan and schedule to start construction on June 1, 2027,and complete by September 30, 2027,is acceptable. You may proceed with the construction as authorized in our letter dated April 15, 2026. Within 90 days of completion of the construction, or no later than December 29, 2027, you must file a brief report summarizing the work including as-builts and construction certifications and any unusual conditions or items that are important to document for future reference. Fie your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer 2 cc: Erik Malvick -Division Manager CA Dept. of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 c/o Shawn.Jones@water.ca.gov