Loading...
HomeMy WebLinkAbout06.03.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, June 4, 2026 8:03:42 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, June 3, 2026 2:16 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/3/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Part 12D Periodic Inspection Pre-Inspection Preparation Report re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260603-5187__;!!KNMwiTCp4spf!DAU4TYvKcZ5zZRNIOxW- riKcpUrQ6Y1isKie94jV3vdHD9MRuBcXpQKiV9RSdP46r1ae0vjmAjP_7FAHPI2ige0km11idy7ZEr8K$ To modify your subscriptions, click here: riKcpUrQ6Y1isKie94jV3vdHD9MRuBcXpQKiV9RSdP46r1ae0vjmAjP_7FAHPI2ige0km11idzRbN1_N$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DAU4TYvKcZ5zZRNIOxW- riKcpUrQ6Y1isKie94jV3vdHD9MRuBcXpQKiV9RSdP46r1ae0vjmAjP_7FAHPI2ige0km11id1p47PGq$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 3, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Part 12D Periodic Inspection Pre-Inspection Preparation Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the periodic inspection pre-inspection preparation report (PI-PIPR) for the following dam, which is part of Pacific Gas and Electric Company’s (PG&E) DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The PI-PIPR is prepared in accordance with Title 18 of the Code of Federal Regulations, Section 12.42. FERC approved Geosyntec Consultants as co-independent consultants (IC). This includes resumes, and inspection plans for this dam in a letter to PG&E dated February 24,2026. Dam Report No. Report Due Date Round Valley Dam 3rd November 1, 2026 The PI-PIPR is enclosed with this letter for FERC review (Enclosure 1). The PI-PIPR includes no additions or changes to the IC team. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Third FERC Part 12D Safety Inspection, Periodic Inspection Pre-Inspection Preparation Report (2026), Round Valley Dam, prepared by Geosyntec dated May 28, 2026