HomeMy WebLinkAbout06.03.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts,
Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and
Electric Company
Date:Thursday, June 4, 2026 8:03:42 AM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, June 3, 2026 2:16 PM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 6/3/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Part 12D Periodic Inspection Pre-Inspection Preparation Report re
the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20260603-5187__;!!KNMwiTCp4spf!DAU4TYvKcZ5zZRNIOxW-
riKcpUrQ6Y1isKie94jV3vdHD9MRuBcXpQKiV9RSdP46r1ae0vjmAjP_7FAHPI2ige0km11idy7ZEr8K$
To modify your subscriptions, click here:
riKcpUrQ6Y1isKie94jV3vdHD9MRuBcXpQKiV9RSdP46r1ae0vjmAjP_7FAHPI2ige0km11idzRbN1_N$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DAU4TYvKcZ5zZRNIOxW-
riKcpUrQ6Y1isKie94jV3vdHD9MRuBcXpQKiV9RSdP46r1ae0vjmAjP_7FAHPI2ige0km11id1p47PGq$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
June 3, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Part 12D Periodic Inspection Pre-Inspection Preparation Report
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents the periodic inspection pre-inspection preparation report (PI-PIPR) for the
following dam, which is part of Pacific Gas and Electric Company’s (PG&E) DeSabla-Centerville
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The PI-PIPR is
prepared in accordance with Title 18 of the Code of Federal Regulations, Section 12.42. FERC
approved Geosyntec Consultants as co-independent consultants (IC). This includes resumes, and
inspection plans for this dam in a letter to PG&E dated February 24,2026.
Dam Report No. Report Due Date
Round Valley Dam 3rd November 1, 2026
The PI-PIPR is enclosed with this letter for FERC review (Enclosure 1). The PI-PIPR includes no
additions or changes to the IC team.
Should you have technical questions concerning this matter, please contact Isabelle Rawlings,
senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact
Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Third FERC Part 12D Safety Inspection, Periodic Inspection Pre-Inspection Preparation Report
(2026), Round Valley Dam, prepared by Geosyntec dated May 28, 2026