Loading...
HomeMy WebLinkAbout06.01.26 Board Correspondence - FW_ Environmental and Recreational Compliance Report submitted in FERC P-77-001,et al. by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Environmental and Recreational Compliance Report submitted in FERC P-77-001,et al. by Pacific Gas and Electric Company Date:Monday, June 1, 2026 11:59:45 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, June 1, 2026 11:58 AM Subject: Environmental and Recreational Compliance Report submitted in FERC P-77-001,et al. by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-77-001 P-96-000 P-137-008 P-175-000 P-233-000 P-606-000 P-619-000 P-803-000 P-1061-019 P-1121-000 P-1354-000 P-1962-001 P-1988-000 P-2105-000 P-2106-000 P-2107-000 P-2130-000 P-2310-000 P-2661-000 P-2687-000 P-2735-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Environmental and Recreational Compliance Report Description: Pacific Gas & Electric Company submits results of the review and plan and schedule to update the debris boom inspection, maintenance, and asset management programs re the Potter Valley Hydroelectric Project et al. under P-77 et al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260601- 5161__;!!KNMwiTCp4spf!CFbCmInA7DFpX- IBYwSitiOSawvaL6TS58aeal3qigy54FJIVDBYNwndTx4VjPa9N4DRZXVGt4ZNl5tVejeKXg4lO5g4HUt3nh5x$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!CFbCmInA7DFpX- IBYwSitiOSawvaL6TS58aeal3qigy54FJIVDBYNwndTx4VjPa9N4DRZXVGt4ZNl5tVejeKXg4lO5g4HfX37xZJ$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CFbCmInA7DFpX- IBYwSitiOSawvaL6TS58aeal3qigy54FJIVDBYNwndTx4VjPa9N4DRZXVGt4ZNl5tVejeKXg4lO5g4HYcAGXt7$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 1, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: FERC Project Nos. 77, 96, 137, 175, 233, 606, 619, 803, 1061, 1121, 1354, 1962, 1988, 2105, 2106, 2107, 2130, 2310, 2661, 2687, and 2735-CA Owner’s Dam Safety Program – Debris Boom Program Management Results of Standards and Procedures Review ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas & Electric Company’s (PG&E) report on PG&E’s standards, processes, and procedures for inspecting and maintaining its inventory of debris booms. PG&E committed to reviewing its debris boom management program in a September 12, 2025, letter to the Federal Energy Regulatory Commission (FERC), which provided a 12.10(a) incident report for a broken log boom at Pit 1 Diversion Dam. Although Pit 1 Dam is part of PG&E’s Pit 1 Hydroelectric Project (FERC No. 2687), the debris boom management program review extended to PG&E’s entire hydro portfolio. PG&E requested an extension of time to complete the review in a letter to FERC dated February 26, 2026. The results of PG&E’s debris boom management program review are summarized in (Enclosure 1). Should you have general or technical questions concerning this matter, please contact Chris Duffey, asset program lead for PG&E, at (530) 513-9559. Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Owner’s Dam Safety Program – Debris Boom Management, Standards, and Procedures Review