HomeMy WebLinkAbout06.01.26 Board Correspondence - FW_ Environmental and Recreational Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Cannon, Jamie; Loeser, Kamie
Subject:Board Correspondence - FW: Environmental and Recreational Compliance Report submitted in FERC P-619-000
by Pacific Gas and Electric Company
Date:Monday, June 1, 2026 8:07:15 AM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, June 1, 2026 6:06 AM
Subject: Environmental and Recreational Compliance Report submitted in FERC P-619-000 by Pacific Gas and
Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 6/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Environmental and Recreational Compliance Report
Description: Pacific Gas and Electric Company submits response to FERC's 10/09/2025 letter and documentation
to confirm completion of Action Items 1, 2, and 5 from the 2025 Environmental Inspection of the Bucks Creek
Hydroelectric Project under P-619.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260601-
5016__;!!KNMwiTCp4spf!AMX0t4-
VFP8avvse9vWjh3Hn4G7DUUhQlOTBPPYpFwmcFN2OyhXXYvru6sA4IfPQDEjPclrOFPQsK06Tk2L8h6RCED-
3R2RIDRE4$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!AMX0t4-
VFP8avvse9vWjh3Hn4G7DUUhQlOTBPPYpFwmcFN2OyhXXYvru6sA4IfPQDEjPclrOFPQsK06Tk2L8h6RCED-
3R8-3uXhN$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AMX0t4-
VFP8avvse9vWjh3Hn4G7DUUhQlOTBPPYpFwmcFN2OyhXXYvru6sA4IfPQDEjPclrOFPQsK06Tk2L8h6RCED-
3R1bHNwAi$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
May 30, 2026
Via Electronic Submittal (E-File)
Debbie-Anne Reese, Secretary
Federal Energy Regulatory Commission
Division of Hydropower Administration and Compliance
888 First Street, NE
Washington, DC 20426
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
2025 Environmental Inspection – Follow-up for Action Items 1, 2, and 5
Dear Secretary Reese:
Pacific Gas and Electric Company (PG&E) received the Federal Energy Regulatory
Commission’s (FERC) October 9, 2025 letter outlining eight follow-up action items resulting
from the September 23–26, 2025 environmental inspection of the Bucks Creek Hydroelectric
Project, FERC No. 619.
PG&E is submitting the enclosed documentation to confirm completion of Action Items 1, 2,
and 5. Action Item 1 requested the repair or replacement of the project’s Part 8 signage at the
Haskins Valley Campground. Action Item 2 required repairs to the out-of-service shower unit
at the Sandy Point Boat Launch. Action Item 5 identified the damaged directional trailhead
sign located at the Hutchins Group Campground to Lower Bucks reservoir. These three
action items have been completed, and photo documentation is enclosed for Commission
review (Enclosure 1).
PG&E intends to provide follow-up documentation addressing Action Item 3 by July 31, 2026.
Should you have any general questions concerning this matter, please contact Trevor Moore,
senior license coordinator for PG&E, at (530) 205 -7345.
Sincerely,
Matthew Joseph
Supervisor, Hydro License Compliance
Enclosure:
1. Completion of follow-up Action Items 1, 2 and 5
ENCLOSURE 1
1
Bucks Creek Hydroelectric Project, FERC No. 619-CA
Responses to FERC Follow-Up Action Items 1, 2 and 5
from the 2025 Environmental Inspection
In a letter to Pacific Gas and Electric Company (PG&E) dated October 9, 2025, the
Federal Energy Regulatory Commission (FERC) provided follow-up action items
identified during the 2025 environmental inspection of PG&E’s Bucks Creek
Hydroelectric Project, FERC No. 619. For reference, Items 1, 2, and 5 are copied below
(in italics), followed by PG&E's responses/photo documentation.
Item 1: The section of the Part 8 sign for the project, available at the Haskins Valley
Campground, that displays the contact information for the project has faded and
become illegible. Please replace or repair the Part 8 sign so that this information is
legible and available to the public. You can refer to the regulations for additional
guidance and install signage displaying the required information (Section 8.2(a) of the
Federal Power Act).
At a minimum, a Part 8 sign should include: the project name and number; a statement
that the project is licensed by the Federal Energy Regulatory Commission; the licensee
name; an active phone number that can be called to obtain additional project -related
recreational information; permissible use times and activities for the available
recreational facilities; identification of the other recreational sites and opportunities
available at the project; and a statement that the recreational facilities are open to all
members of the public without discrimination.
We recommend that Part 8 signage be placed at all public recreational facilities
throughout the project; however, it is preferrable that one be placed at each larger
recreational facility of the project. The signs should be conspicuous, on durable
signposts, and on sunfast material, so that the public can easily access information
about recreational opportunities offered by the project. Accordingly, please replace or
repair the Part 8 sign before the start of the 2026 recreational season and file photo
documentation of the correction by May 31, 2026.
PG&E Response: PG&E replaced the faded Part 8 sign at Haskins Valley Campground
so the required project and contact information is now legible , available to the public,
and meets the criteria identified in the Action Item. The following photo documents the
replacement sign.
2
Photo 1. Depicts the replaced Part 8 signage.
Item 2: Please bring the out-of-service shower unit at Sandy Point Boat Launch back
into use, before the start of the 2026 recreational season, and file photo documentation
that this maintenance activity has been completed by May 31, 2026.
PG&E Response: PG&E completed repairs at the Sandy Point location, and all four
bathrooms are now in good working order and fully operational, including the shower
unit identified during the inspection. In addition to repairing the out-of-service shower,
PG&E repaired three leaking showers, replaced one toilet, and returned one sink to
service. The following photo documents the completed repairs.
3
Photo 2. Depicts the repaired Sandy Point Boat Launch shower.
Item 5: Hutchins Group Campground was severely affected by the Dixie Fire. Though it
currently does not supply potable water (referenced above) due to the destruction of its
water tank, the campsites have been cleared of hazard trees and remain available for
occupation by the public. From Hutchins, the trailhead sign to Lower Bucks was also
burned. Please replace this directional signage by the start of the 2026 recreational
season and file photo documentation by May 31, 2026.
PG&E Response: PG&E replaced the trailhead sign identified during the inspection.
Photo documentation of the replacement sign is included below.
4
Photo 3. Depicts the replacement trailhead sign from Hutchins to Lower Bucks Lake.