Loading...
HomeMy WebLinkAbout06.01.26 Board Correspondence - FW_ Annual Water Quality_Minimum Flow submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Annual Water Quality/Minimum Flow submitted in FERC P-2107-000 by Pacific Gas and Electric Company Date:Monday, June 1, 2026 8:06:52 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, June 1, 2026 5:56 AM Subject: Annual Water Quality/Minimum Flow submitted in FERC P-2107-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Annual Water Quality/Minimum Flow Description: Pacific Gas and Electric Company submits notice of the 2026 Final Water Year Determination re the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260601- 5010__;!!KNMwiTCp4spf!Dh7sCMN- 55PWP11ugF_q756rqul2ColLxDhmxjP_P8ysnG0_JdFjmqGS9y3Q7fSMGf_Jl0-uLk63kZcApBwVuKsQns0E- V6bMWdg$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Dh7sCMN- 55PWP11ugF_q756rqul2ColLxDhmxjP_P8ysnG0_JdFjmqGS9y3Q7fSMGf_Jl0-uLk63kZcApBwVuKsQns0E- UnhCjYS$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Dh7sCMN- 55PWP11ugF_q756rqul2ColLxDhmxjP_P8ysnG0_JdFjmqGS9y3Q7fSMGf_Jl0-uLk63kZcApBwVuKsQns0E- ViOgfRH$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 29, 2026 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary Federal Energy Regulatory Commission Division of Hydropower Administration and Compliance 888 First Street, NE Washington, D.C. 20426 RE: Poe Hydroelectric Project, FERC No. 2107-CA Notice of the 2026 Final Water Year Determination Dear Secretary Reese: This letter presents the final water year determination as Normal for Pacific Gas and Electric Company’s (PG&E) Poe Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2107. Pursuant to the State Water Resources Control Board Water Quality Certification Condition 2, and Forest Service 4(e) Condition No. 23, the Forest Service, and other interested governmental agencies, were notified of the final water year type determination on May 28, 2026. (Enclosure 1) contains documentation of this notification. If you have any questions, please call PG&E’s License Coordinator, Anna Urias, at (530) 201-1961. Sincerely, Jimmy Galloway Senior Hydro License Coordinator Enclosure: 1. Agency Consultation ENCLOSURE 1 From:Urias, Anna To:"Alvarez, Dawn - FS, CA"; "Sable, Kurt - FS, CA"; "Berry, Jonathan - FS, CA"; "Brenzovich, Erika - FS, CA"; "Dyke, Jessica@Waterboards"; "Fisch, Nathan@Waterboards"; "Bartoo, Aondrea"; "Lawson, Beth@Wildlife"; "Michael Maher"; "Theresa Lorejo-Simsiman"; "Chris Shutes"; "Loeser, Kamie" Cc:Drummond, Duncan; McKay, Jim; Reyes, Catalina; Stevens, Kevin; Herman, Andie; Salve, Rohit; Lent, Michelle; Johnson, Shannon; Joseph, Matthew Subject:Poe Final Water Year Type Determination for May 2026 Date:Thursday, May 28, 2026 12:26:00 PM Hi all- Rock Creek-Cresta, Poe, and Bucks will remain in a Normal year type for the final classification of WY2026. 4,585 TAF total Water Year (WY) forecast runoff for Feather River at Oroville. 105% of WY average. https://cdec.water.ca.gov/reportapp/javareports?name=B120DIST NFFR classification - based on Feather River at Oroville WY forecast Year Type Min. WY Inflow to Oroville forecast [TAF] Max. WY Inflow to Oroville forecast [TAF] Wet 5,679 - Normal 3,228 5,679 Dry 2,505 3,228 CD -2,505 Thanks, A N N A U R I A S H Y D R O L I C E N S E C O O R D I N A T O R I P O W E R G E N E R A T I O N P A C I F I C G A S & E L E C T R I C C O M P A N Y ( 5 3 0 ) 2 0 1 - 1 9 6 1 I A X U S @ P G E . C O M