HomeMy WebLinkAbout06.01.26 Board Correspondence - FW_ Annual Water Quality_Minimum Flow submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Annual Water Quality/Minimum Flow submitted in FERC P-2107-000 by Pacific Gas
and Electric Company
Date:Monday, June 1, 2026 8:06:52 AM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, June 1, 2026 5:56 AM
Subject: Annual Water Quality/Minimum Flow submitted in FERC P-2107-000 by Pacific Gas and Electric
Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 6/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Annual Water Quality/Minimum Flow
Description: Pacific Gas and Electric Company submits notice of the 2026 Final Water Year Determination re the
Poe Hydroelectric Project under P-2107.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260601-
5010__;!!KNMwiTCp4spf!Dh7sCMN-
55PWP11ugF_q756rqul2ColLxDhmxjP_P8ysnG0_JdFjmqGS9y3Q7fSMGf_Jl0-uLk63kZcApBwVuKsQns0E-
V6bMWdg$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Dh7sCMN-
55PWP11ugF_q756rqul2ColLxDhmxjP_P8ysnG0_JdFjmqGS9y3Q7fSMGf_Jl0-uLk63kZcApBwVuKsQns0E-
UnhCjYS$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Dh7sCMN-
55PWP11ugF_q756rqul2ColLxDhmxjP_P8ysnG0_JdFjmqGS9y3Q7fSMGf_Jl0-uLk63kZcApBwVuKsQns0E-
ViOgfRH$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
May 29, 2026
Via Electronic Submittal (E-File)
Debbie-Anne Reese, Secretary
Federal Energy Regulatory Commission
Division of Hydropower Administration and Compliance
888 First Street, NE
Washington, D.C. 20426
RE: Poe Hydroelectric Project, FERC No. 2107-CA
Notice of the 2026 Final Water Year Determination
Dear Secretary Reese:
This letter presents the final water year determination as Normal for Pacific Gas and
Electric Company’s (PG&E) Poe Hydroelectric Project, Federal Energy Regulatory
Commission (FERC) No. 2107. Pursuant to the State Water Resources Control Board
Water Quality Certification Condition 2, and Forest Service 4(e) Condition No. 23, the
Forest Service, and other interested governmental agencies, were notified of the final
water year type determination on May 28, 2026.
(Enclosure 1) contains documentation of this notification. If you have any questions, please
call PG&E’s License Coordinator, Anna Urias, at (530) 201-1961.
Sincerely,
Jimmy Galloway
Senior Hydro License Coordinator
Enclosure:
1. Agency Consultation
ENCLOSURE 1
From:Urias, Anna
To:"Alvarez, Dawn - FS, CA"; "Sable, Kurt - FS, CA"; "Berry, Jonathan - FS, CA"; "Brenzovich, Erika - FS, CA"; "Dyke,
Jessica@Waterboards"; "Fisch, Nathan@Waterboards"; "Bartoo, Aondrea"; "Lawson, Beth@Wildlife"; "Michael
Maher"; "Theresa Lorejo-Simsiman"; "Chris Shutes"; "Loeser, Kamie"
Cc:Drummond, Duncan; McKay, Jim; Reyes, Catalina; Stevens, Kevin; Herman, Andie; Salve, Rohit; Lent, Michelle;
Johnson, Shannon; Joseph, Matthew
Subject:Poe Final Water Year Type Determination for May 2026
Date:Thursday, May 28, 2026 12:26:00 PM
Hi all-
Rock Creek-Cresta, Poe, and Bucks will remain in a Normal year type for the final
classification of WY2026.
4,585 TAF total Water Year (WY) forecast runoff for Feather River at Oroville. 105% of WY
average.
https://cdec.water.ca.gov/reportapp/javareports?name=B120DIST
NFFR classification - based on Feather River at Oroville WY forecast
Year
Type
Min. WY Inflow to Oroville forecast
[TAF]
Max. WY Inflow to Oroville forecast
[TAF]
Wet 5,679 -
Normal 3,228 5,679
Dry 2,505 3,228
CD -2,505
Thanks,
A N N A U R I A S
H Y D R O L I C E N S E C O O R D I N A T O R I P O W E R G E N E R A T I O N
P A C I F I C G A S & E L E C T R I C C O M P A N Y
( 5 3 0 ) 2 0 1 - 1 9 6 1 I A X U S @ P G E . C O M