Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, May 29, 2026 6:06 AM
Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 5/29/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits Hydrologic Hazard Analysis Study Report and Shear Wave Velocity Memorandum re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project
under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260529-
5034__;!!KNMwiTCp4spf!BfEZoxreAEPDOIxn6bKnvcEtdPgYNpvDfb0_JMn_nz093lEbPiaQPI6WJ7ZTrPybxxuau9Zcx9MZsPyDrJboZJvVFFb-22I5Rh9w$
To modify your subscriptions, click here:
24EcaRf8$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BfEZoxreAEPDOIxn6bKnvcEtdPgYNpvDfb0_JMn_nz093lEbPiaQPI6WJ7ZTrPybxxuau9Zcx9MZsPyDrJboZJvVFFb-20-
FNVIC$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
May 28, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Philbrook Dam, NATDAM No. CA00345
Third Part 12D Inspection (Comprehensive Assessment)
Hydrologic Study and Shear Velocity Memorandum
ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents a hydrologic hazard analysis report and memorandum on shear-wave velocity
data for Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal
Energy Regulator Commission (FERC) No. 803. These two studies were referenced during the
potential failure mode analysis and risk workshops for the Part 12D comprehensive assessment
(CA). The workshops were held April 20–24, 2026, and May 18–21, 2026. The two studies are
provided for FERC’s records.
The hydrologic hazard analysis report is provided in (Enclosure 1). The memorandum summarizing
site-specific shear-wave velocity data used to inform ground motions at Philbrook Dam is provided
in (Enclosure 2). PG&E has reviewed the consultant’s hydrologic analysis report and concurs with
the information presented therein.
Should you have technical questions concerning this matter, please contact Isabelle Rawlings,
senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact
Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI//CEII – DO NOT RELEASE
1. Hydrologic Hazard Study to Support SQRA for Philbrook Dam, prepared by MSG Engineering
Consultants and Brava Engineering and dated February 7, 2025
2. 2022 Velocity Program Vs30 Based Ground Motion, prepared by PG&E and dated May 17, 2023