Loading...
HomeMy WebLinkAbout05.29.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, May 29, 2026 8:44:53 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, May 29, 2026 6:06 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/29/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Hydrologic Hazard Analysis Study Report and Shear Wave Velocity Memorandum re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260529- 5034__;!!KNMwiTCp4spf!BfEZoxreAEPDOIxn6bKnvcEtdPgYNpvDfb0_JMn_nz093lEbPiaQPI6WJ7ZTrPybxxuau9Zcx9MZsPyDrJboZJvVFFb-22I5Rh9w$ To modify your subscriptions, click here: 24EcaRf8$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BfEZoxreAEPDOIxn6bKnvcEtdPgYNpvDfb0_JMn_nz093lEbPiaQPI6WJ7ZTrPybxxuau9Zcx9MZsPyDrJboZJvVFFb-20- FNVIC$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 28, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Third Part 12D Inspection (Comprehensive Assessment) Hydrologic Study and Shear Velocity Memorandum ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents a hydrologic hazard analysis report and memorandum on shear-wave velocity data for Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulator Commission (FERC) No. 803. These two studies were referenced during the potential failure mode analysis and risk workshops for the Part 12D comprehensive assessment (CA). The workshops were held April 20–24, 2026, and May 18–21, 2026. The two studies are provided for FERC’s records. The hydrologic hazard analysis report is provided in (Enclosure 1). The memorandum summarizing site-specific shear-wave velocity data used to inform ground motions at Philbrook Dam is provided in (Enclosure 2). PG&E has reviewed the consultant’s hydrologic analysis report and concurs with the information presented therein. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Hydrologic Hazard Study to Support SQRA for Philbrook Dam, prepared by MSG Engineering Consultants and Brava Engineering and dated February 7, 2025 2. 2022 Velocity Program Vs30 Based Ground Motion, prepared by PG&E and dated May 17, 2023