Loading...
HomeMy WebLinkAbout05.28.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, May 28, 2026 3:57:46 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, May 28, 2026 11:46 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/28/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits results of an engineering study to analyze and evaluate potential improvement alternatives to address seismic deficiencies of Round Valley Dam, part of the DeSabla- Centerville Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260528- 5163__;!!KNMwiTCp4spf!A5X3Ks-lJ20Z89UYqICAfntzDivIBKGI- TeChZ8SuRKuGrrVIAhztBF5hzMNomYraM6nry2dP6oRj-5W5Q1bQgcLzxMKf_I_WsfD$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!A5X3Ks- lJ20Z89UYqICAfntzDivIBKGI-TeChZ8SuRKuGrrVIAhztBF5hzMNomYraM6nry2dP6oRj- 5W5Q1bQgcLzxMKf96ueEy-$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A5X3Ks- lJ20Z89UYqICAfntzDivIBKGI-TeChZ8SuRKuGrrVIAhztBF5hzMNomYraM6nry2dP6oRj- 5W5Q1bQgcLzxMKf8UUHZuN$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 28, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Discussion of Results of Seismic Analysis of Alternatives and Plan and Schedule for Further Action ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the results of an engineering study to analyze and evaluate potential improvement alternatives to address seismic deficiencies of Round Valley Dam, which is part of PG&E’s DeSabla- Centerville Hydroelectric Project, FERC No. 803. PG&E submitted its original plan and schedule for providing the results of the Analysis of Alternatives (AoA) in a letter to FERC dated September 27, 2024. PG&E filed an extension of time request in a letter dated August 13, 2025. PG&E’s discussion of the results of the AoA and plan and schedule for further action are enclosed with this letter (Enclosure 1). The AoA report is provided in (Enclosure 2). PG&E has reviewed the enclosed report and concurs with the findings and conclusions presented therein. Although the report includes a recommended alternative for potential improvements, PG&E recognizes that the engineering alternatives evaluated as part of the study are conceptual and based on limited information. PG&E considers the alternatives and recommendations presented in the report to be preliminary and subject to potential changes based on additional investigation and analysis. The actual scope and timing of any future projects depend on the results of further study. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Discussion of Analysis of Alternatives Results and Plan and Schedule for Further Action 2. Alternatives Analysis, Round Valley Dam Seismic Retrofit Project, prepared by Slate Geotechnical and dated January 29, 2026