Loading...
HomeMy WebLinkAbout06.22.26 Board Correspondence - FW_ Government Agency Submittal submitted in FERC P-619-000 by State Water Resources Control Board (CA)From:Clerk of the Board To:BOS Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Government Agency Submittal submitted in FERC P-619-000 by State Water Resources Control Board (CA) Date:Monday, June 22, 2026 11:45:25 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, June 22, 2026 11:36 AM Subject: Government Agency Submittal submitted in FERC P-619-000 by State Water Resources Control Board (CA) .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/22/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: State Water Resources Control Board (CA) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Government Agency Submittal Description: The California State Water Resources Control Board submits Order in the matter of Petition for Reconsideration of the Water Quality Certification for the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260622- 5189__;!!KNMwiTCp4spf!CVXsL_Lmz4IM3DXpu6nD039BVieClax4xH9HOEwQvsZpAeBzsmT0-OVz_GZikdqkLEiP9JSyAMCVUbp99EOQNhCuDBf2lyE72tzh$ To modify your subscriptions, click here: OVz_GZikdqkLEiP9JSyAMCVUbp99EOQNhCuDBf2l6VCSMBv$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CVXsL_Lmz4IM3DXpu6nD039BVieClax4xH9HOEwQvsZpAeBzsmT0- OVz_GZikdqkLEiP9JSyAMCVUbp99EOQNhCuDBf2l2ohYXAP$ or for phone support, call 866-208-3676. FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office June 17, 2026 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Part 12D Periodic Inspection Pre-Inspection Preparation Report –Round Valley Dear Mr.Cruzen: This is in response to a letter dated June 03, 2026,from Mr.Robert Ellis that submitted the Periodic Inspection Pre-Inspection Preparation Report (PI-PIPR)for the 3rd Part 12D Independent Consultant’s (IC) safety inspection of Round Valley Dam, which is part of the DeSabla-Centerville Project, FERC No. 803. We have reviewed the PI-PIPR,and we find it generally acceptable;and demonstrates that the IC Team is adequately prepared for the inspection. However, we have the following comments which should be addressed in the final Part 12D Periodic Inspection Report (PIR): 1.Include the IC team’s assessment for piezometric trends observed in Figure D- 9. In addition,the IC team noted an 11foot difference in tip elevation for piezometer B1. Evaluate the existing data and determine if any changes to the data or instrumentation are required. 2.E-file the referenced MGS-Brava 2025 report for the hydrologic hazard. No response is required to this letter. The Part 12D field inspection may continue as scheduled.File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20260617-3062 Filed Date: 06/17/2026 2 We appreciate your continued efforts in this aspect of our dam safety program.If you have any questions, contact Ms.Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260617-3062 Filed Date: 06/17/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.06.17 11:38:10 -07'00' Document Content(s) P-803-000_108550_Round Valley_PI_PIPR.docx.pdf ...........................1 Document Accession #: 20260617-3062 Filed Date: 06/17/2026