Loading...
HomeMy WebLinkAbout07.24.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2088-000 byFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-2088-000 by Date:Friday, July 24, 2026 9:44:30 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, July 24, 2026 6:16 AM Subject: Dam Safety Compliance Report submitted in FERC P-2088-000 by .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/24/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: <Not available> Docket(s): P-2088-000 Lead Applicant: South Feather Water and Power Agency Filing Type: Dam Safety Compliance Report Description: South Feather Water and Power Agency submits response to FERC's 06/30/2026 letter requesting a plan and schedule to address comments made during the 2026 Dam Safety Inspection of the South Feather Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260724-5119__;!!KNMwiTCp4spf!A4O3E7JApxUF8eBwIFcg2T7M7- B4BCM9pFGmNpgrS4LubGGZZtY8ZfPKDw5Yx3TLF1x_YCwZkACkSWEv0RCOguvRP-owDbx9--yt$ To modify your subscriptions, click here: B4BCM9pFGmNpgrS4LubGGZZtY8ZfPKDw5Yx3TLF1x_YCwZkACkSWEv0RCOguvRP-owDQdVuJoK$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A4O3E7JApxUF8eBwIFcg2T7M7- B4BCM9pFGmNpgrS4LubGGZZtY8ZfPKDw5Yx3TLF1x_YCwZkACkSWEv0RCOguvRP-owDdtmNhLA$ or for phone support, call 866-208-3676. Document Accession #: 20260724-5119 Filed Date: 07/24/2026 1 | P a g e July 23, 2026 Filed Electronically Frank L. Blackett, P.E., Regional Engineer 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (FERC No. 2088) 2026 Dam Safety Inspection Follow-up Dear Mr. Blackett, This letter provides a response to the Commission letter dated June 30, 2026 requesting a response, and if applicable, a plan and schedule to address comments related to observations made during the June 8-9, 2026 Dam Safety Inspections. FERC Action Item: Assess the need to evaluate the condition and integrity of the rock bolt anchors within the valve chambers at both Little Grass Valley dam and Sly Creek dam, given the observed apparent advanced corrosion of some of the rock bolt nuts and a number of locations where the face plate is no longer bearing on rock. Response: SFWPA will evaluate the condition and integrity of the rock bolt anchor systems within the valve chambers at Little Grass Valley Dam and Sly Creek Dam. The evaluation will include a review of available design and construction documentation, inspection records, photographs, and observed conditions, including apparent corrosion of exposed anchors and locations where bearing plates are no longer in full contact with the rock surface. The evaluation will assess the function and significance of the anchors, their importance to maintaining rock stability within the valve chambers, and whether the observed deterioration could affect their intended performance. Based on the results of the evaluation, SFWPA will determine whether additional assessment is warranted. Potential follow-up activities, if supported by the findings, may include visual inspections, sounding of steel bars, nuts and bearing plates, measurement of corrosion-related section loss, assessment of plate bearing conditions, and evaluation of whether rehabilitation or replacement of affected components should be considered. Because access to the valve chambers is seasonally constrained by weather conditions and is typically limited from approximately November through May, any field investigations that may be identified as part of the evaluation will be planned during periods when safe access is available. The evaluation will be completed by October 31, 2027, and any recommended follow-up investigations or corrective actions will be identified based on the findings. KRISTEN MCKILLOP REGULATORY COMPLIANCE MANAGER Document Accession #: 20260724-5119 Filed Date: 07/24/2026 2 | P a g e If you have any questions related to this transmittal, please feel free to contact me at (530) 532-1348, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency cc: Rath Moseley, General Manager Hunter Doyle, Power Division Manager Document Accession #: 20260724-5119 Filed Date: 07/24/2026 Document Content(s) to FERC_07232026_2026 DS2I inspection follow up.pdf ......................1