Loading...
HomeMy WebLinkAbout07.23.26 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, July 24, 2026 9:34:42 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, July 23, 2026 11:26 AM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/23/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits summary and conclusions of efforts to address FERC's 6/11/2026 Comment Nos. 1-12 on the construction authorization request for the Oro Fino Overhead Project re DeSabla Dam of the DeSabla-Centerville Project, P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260723-5125__;!!KNMwiTCp4spf!G3vr1xafirClPyrbxjzp5cA-6c-l9ZRZ3iW9qPna11R- w_fFA1pLGXzSKoGfHMtudJnaidVfqb0oopbSmy-jRsnGfJ-yNfo4W2gX$ To modify your subscriptions, click here: 6c-l9ZRZ3iW9qPna11R-w_fFA1pLGXzSKoGfHMtudJnaidVfqb0oopbSmy-jRsnGfJ-yNcwdvS4v$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!G3vr1xafirClPyrbxjzp5cA-6c- l9ZRZ3iW9qPna11R-w_fFA1pLGXzSKoGfHMtudJnaidVfqb0oopbSmy-jRsnGfJ-yNWTq3vJa$ or for phone support, call 866-208-3676. Document Accession #: 20260723-5125 Filed Date: 07/23/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 23, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA DeSabla Forebay, NATDAM No. CA00343 Oro Fino 1.3 Overhead Project – Conclusions for FERC Comments 1–12 ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1 through C-12) on the Oro Fino overhead project for DeSabla Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E submitted the original request for construction authorization in a letter dated April 9, 2026. PG&E received FERC’s comments in a letter dated June 11, 2026. Summaries and conclusions of PG&E’s efforts to address C-1 through C-12 are enclosed with this letter (Enclosure 1). Also enclosed are revised construction documents, including the project description (Enclosure 2), quality control inspection program (Enclosure 3), 100% submittal drawings (Enclosure 4), and a temporary construction emergency action plan (Enclosure 5). PG&E believes C-1 through C-12 have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. PG&E plans to release the project to construction in fall of 2026. PG&E plans to provide a final construction report within 90 days of completing construction, otherwise PG&E will provide an update on the project status and a plan and schedule for further action by January 31, 2027. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for FERC Comments on the Oro Fino Phase 1.3 Overhead Project 2. DeSabla Forebay Dam Oro Fino 1102 Electric Undergrounding Project – Phase 1.3 Overhead, Project Description, Revision 2, prepared by PG&E and dated July 2026 3. DeSabla Forebay Dam Oro Fino 1102 Electric Undergrounding Project – Phase 1.3 Overhead, Quality Control Inspection Program, Revision 2, prepared by PG&E and dated July 2026 4. Final 100% Submittal Drawings, prepared by PG&E and dated July 2026 5. DeSabla Forebay Dam Oro Fino 1102 Electric Undergrounding Project – Phase 1.3 Overhead, Temporary Construction Emergency Action Plan, Revision 2, prepared by PG&E and dated July 2026 cc: See Attached List Document Accession #: 20260723-5125 Filed Date: 07/23/2026 Frank L. Blackett, P.E., Regional Engineer July 23, 2026 Page 2 cc: via secure file transfer w/enclosures Matthew Buckman, Area Engineer Department of Water Resources, Division of Safety of Dams Matthew.Buckman@water.ca.gov Document Accession #: 20260723-5125 Filed Date: 07/23/2026 Document Content(s) PGE20260723_803_DeSabla_Orofino1.3_Resp1_12_Ltr.pdf ......................1