Loading...
HomeMy WebLinkAbout07.14.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Thursday, July 16, 2026 11:56:19 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, July 14, 2026 8:56 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/14/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Emergency Action Plan Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address FERC's comment re the 2021 Emergency Action Plans et al. and updated extension of time requests to address Comment Nos. 1 to 8 re the Bucks Creek Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260714- 5012__;!!KNMwiTCp4spf!FEmNTt1MPNUoJ4EeNVQxlgdBOpTRTsqC_Drw17OdsZB0xtbZMA8sppatwuyAj6S6QrefW5heN34BfpRnU0cFZ0RTlE2Ad-u09wF7$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FEmNTt1MPNUoJ4EeNVQxlgdBOpTRTsqC_Drw17OdsZB0xtbZMA8sppatwuyAj6S6QrefW5heN34BfpRnU0cFZ0RTlE2AdzyWdu_j$ or for phone support, call 866-208-3676. Document Accession #: 20260714-5012 Filed Date: 07/14/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 13, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Bucks Storage Dam, NATDAM No. CA00332 Grizzly Forebay Dam, NATDAM No. CA00333 Three Lakes Dam, NATDAM No. CA 00334 Dam Breach Analysis and Inundation Maps Summary and Conclusion for FERC Comment and Updated Extension of Time Requests for FERC Comments 1–8 from May 2, 2025, Letter ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company’s (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) comment on the 2021 emergency action plans and dam breach analysis and inundation maps for Bucks Storage Dam, Bucks Diversion Dam, Grizzly Forebay Dam, and Three Lakes Dam, which are part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received FERC’s comment in a letter dated April 20, 2026. Addressing FERC’s comment involves providing updated extension of time requests for Comments 1–8 that FERC provided in a letter dated May 2, 2025. Included with PG&E’s extension of time requests is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). A summary and conclusion of PG&E’s efforts to address the comment is enclosed with this letter (Enclosure 1), including the updated extension of time requests for Comments 1–8. PG&E believes FERC’s April 20, 2026, comment has been satisfactorily addressed based on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Summary and Conclusion for FERC Comment on the 2021 Emergency Action Plans and Dam Breach Analysis and Inundation Maps with Updated Extension of Time Requests for Comments 1–8 from FERC’s May 2, 2025, Letter Document Accession #: 20260714-5012 Filed Date: 07/14/2026 Document Content(s) PGE20260713_619_BucksCreek_EAP_ResptoC1_Ltr.pdf...........................1