Loading...
HomeMy WebLinkAbout07.08.26 FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Loeser, Kamie; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Cannon, Jamie Subject:FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Wednesday, July 8, 2026 9:03:08 AM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, July 8, 2026 6:06 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/8/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for extension of time until 12/31/2028 to address Recommendation 3b from the 11th Part 12D Safety Inspection Report re the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260708- 5016__;!!KNMwiTCp4spf!AbhBZe9Nqfw69LTn4NEDbKNRHC7p82758bhbgTXC_c7LrTDBcQuhtVcuta8u_4b1MmbQcta3J9ljpWLyjObJCcvX1q9ALbSG5ZHd$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AbhBZe9Nqfw69LTn4NEDbKNRHC7p82758bhbgTXC_c7LrTDBcQuhtVcuta8u_4b1MmbQcta3J9ljpWLyjObJCcvX1q9ALcyu7IGV$ or for phone support, call 866-208-3676. Document Accession #: 20260708-5016 Filed Date: 07/08/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 7, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 11th Part 12D Inspection – Extension of Time Request for Recommendation 3b ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for extension of time to address Recommendation 3b (R-3b) from the 11th Part 12D safety inspection report (dated January 2021) for Grizzly Forebay Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E provided its most-recent extension of time request regarding R-3b in a November 10, 2023, letter to FERC. The extension of time request for R-3b and reason for the request is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request Document Accession #: 20260708-5016 Filed Date: 07/08/2026 Document Content(s) PGE20260707_619_GrizzlyForebay_R3_EOT_Ltr.pdf.............................1