HomeMy WebLinkAbout07.07.26 Board Correspondence - FW_ Delegated Order issued in FERC P-77-000,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts,
Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-77-000,et al.
Date:Tuesday, July 7, 2026 4:59:54 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, July 7, 2026 12:47 PM
Subject: Delegated Order issued in FERC P-77-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 7/7/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-77-000
P-96-000
P-137-000
P-175-000
P-178-000
P-233-000
P-606-000
P-619-000
P-803-000
P-1061-000
P-1121-000
P-1333-000
P-1354-000
P-1962-000
P-1988-000
P-2105-000
P-2106-000
P-2107-000
P-2130-000
P-2155-000
P-2310-000
P-2661-000
P-2687-000
P-2735-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company approving Messrs, Boulanger, et al. to perform an external
audit of the Owner's Dam Safety Program for the Potter Valley Project et al. under P-77 et al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20260707-3049__;!!KNMwiTCp4spf!DFuhN_6ytbMq5-
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!DFuhN_6ytbMq5-
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DFuhN_6ytbMq5-
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
July 7, 2026
In reply refer to:
Project Nos. 77, 96, 137, 175,
178, 233, 606, 619, 803, 1061,
1121, 1333, 1354, 1962, 1988,
2105,2106, 2107, 2130, 2155,
2310, 2661, 2687, and
2735-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Nominees Resumes for External Audit for Owner’s Dam Safety Program (ODSP)
Dear Mr. Cruzen:
This is in response to a letter dated June 1, 2026,from Mr. David Ritzman that
submitted the resumes for the nominees to perform a 2026 external audit of your ODSP
for the projects listed in Enclosure 1. Our Project Engineer contact information is
included in Enclosure 2. We have reviewed the submittal and found the proposal for the
nominees, Messrs.Boulanger,Gutierrez,Johnson,and Rigbey to perform an external
audit of the ODSP to serve as the external auditors acceptable.
We appreciate your continued efforts in this aspect of our dam safety program. If
you have questions, contact our engineer assigned to the specific project.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosures (2)
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
2
cc:
Erik Malvick -Division Manager
Division of Safety of Dams
California Department of Water Resources
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
c/o Shawn.Jones@water.ca.gov
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
Projects Included in Enclosure 1
PG&E’s Resumes ODSP External Audit
1 of 1
Table 1. Projects, Project Engineers and Phone Numbers
Covered by the 2026 ODSP Audit Report
Project No.Project Name Engineer
77 Potter Valley Ryan Tom
96 Kerckhoff Samuel Lee
137 Mokelumne River Vincent Vigil
175 Balch Samuel Lee
178 Kern Canyon Cody Stephenson
233 Pit No. 3, 4, and 5 Fenggang Ma
606 Kilarc-Cow Creek Samuel Lee
619 Bucks Creek Eunhye Kim
803 De Sabla-Centerville Eunhye Kim
1061 Phoenix Vincent Vigil
1121 Battle Creek Samuel Lee
1333 Tule River Cody Stephenson
1354 Crane Valley Samuel Lee
1962 Rock Creek-Cresta Eunhye Kim
1988 Haas-Kings River Samuel Lee
2105
Upper North Fork Feather
River
Eunhye Kim
2106 McCloud-Pit Fenggang Ma
2107 Poe Eunhye Kim
2130 Spring Gap-Stanislaus Vincent Vigil
2155 Chili Bar Fenggang Ma
2310
Drum-Spaulding Mynul Chowdhury,
Thao Bui
2661 Hat Creek Nos. 1 and 2 Fenggang Ma
2687 Pit No. 1 Fenggang Ma
2735 Helms Samuel Lee
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
FERC Project Engineers Enclosure 2
1 of 1
Table 2. FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Ryan Tom (415) 369-3347
Samuel Lee (415) 369-3393
Vincent Vigil (415) 369-3315
Cody Stephenson (415) 369-3308
Fenggang Ma (415) 369-3319
Eunhye Kim (415) 369-3321
Mynul Chowdhury (415) 369-3313
Thao Bui (415) 369-3312
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
Document Content(s)
P-1988-000 119643-57 ODSP Audit Resumes.docx.pdf .........................1
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
July 7, 2026
In reply refer to:
Project Nos. 77, 96, 137, 175,
178, 233, 606, 619, 803, 1061,
1121, 1333, 1354, 1962, 1988,
2105,2106, 2107, 2130, 2155,
2310, 2661, 2687, and
2735-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Nominees Resumes for External Audit for Owner’s Dam Safety Program (ODSP)
Dear Mr. Cruzen:
This is in response to a letter dated June 1, 2026,from Mr. David Ritzman that
submitted the resumes for the nominees to perform a 2026 external audit of your ODSP
for the projects listed in Enclosure 1. Our Project Engineer contact information is
included in Enclosure 2. We have reviewed the submittal and found the proposal for the
nominees, Messrs.Boulanger,Gutierrez,Johnson,and Rigbey to perform an external
audit of the ODSP to serve as the external auditors acceptable.
We appreciate your continued efforts in this aspect of our dam safety program. If
you have questions, contact our engineer assigned to the specific project.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosures (2)
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
2
cc:
Erik Malvick -Division Manager
Division of Safety of Dams
California Department of Water Resources
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
c/o Shawn.Jones@water.ca.gov
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
Projects Included in Enclosure 1
PG&E’s Resumes ODSP External Audit
1 of 1
Table 1. Projects, Project Engineers and Phone Numbers
Covered by the 2026 ODSP Audit Report
Project No.Project Name Engineer
77 Potter Valley Ryan Tom
96 Kerckhoff Samuel Lee
137 Mokelumne River Vincent Vigil
175 Balch Samuel Lee
178 Kern Canyon Cody Stephenson
233 Pit No. 3, 4, and 5 Fenggang Ma
606 Kilarc-Cow Creek Samuel Lee
619 Bucks Creek Eunhye Kim
803 De Sabla-Centerville Eunhye Kim
1061 Phoenix Vincent Vigil
1121 Battle Creek Samuel Lee
1333 Tule River Cody Stephenson
1354 Crane Valley Samuel Lee
1962 Rock Creek-Cresta Eunhye Kim
1988 Haas-Kings River Samuel Lee
2105
Upper North Fork Feather
River
Eunhye Kim
2106 McCloud-Pit Fenggang Ma
2107 Poe Eunhye Kim
2130 Spring Gap-Stanislaus Vincent Vigil
2155 Chili Bar Fenggang Ma
2310
Drum-Spaulding Mynul Chowdhury,
Thao Bui
2661 Hat Creek Nos. 1 and 2 Fenggang Ma
2687 Pit No. 1 Fenggang Ma
2735 Helms Samuel Lee
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
FERC Project Engineers Enclosure 2
1 of 1
Table 2. FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Ryan Tom (415) 369-3347
Samuel Lee (415) 369-3393
Vincent Vigil (415) 369-3315
Cody Stephenson (415) 369-3308
Fenggang Ma (415) 369-3319
Eunhye Kim (415) 369-3321
Mynul Chowdhury (415) 369-3313
Thao Bui (415) 369-3312
Document Accession #: 20260707-3049 Filed Date: 07/07/2026
Document Content(s)
P-1988-000 119643-57 ODSP Audit Resumes.docx.pdf .........................1