Loading...
HomeMy WebLinkAbout07.01.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-2088-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-2088-000 Date:Wednesday, July 1, 2026 8:46:53 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, July 1, 2026 8:46 AM Subject: Compliance Directives issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/1/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Compliance Directives General Correspondence Delegated Order Description: Letter to South Feather Water and Power Agency providing comments on the 12/30/2025 Annual Part 12D Status Report for the outstanding recommendations etc. for multiple developments, part of the South Feather Power Project under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260701- 3043__;!!KNMwiTCp4spf!Hu5iFcimMFu0tVcLDe5s6IspQO9Yh4U_FzRG2G81VEnOXyaft66ll4R91QNoMrE9VyYRbxu0nAgFP4lM838Cfy5PElfeLlyWQNZt$ To modify your subscriptions, click here: rM88$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling- help.asp__;!!KNMwiTCp4spf!Hu5iFcimMFu0tVcLDe5s6IspQO9Yh4U_FzRG2G81VEnOXyaft66ll4R91QNoMrE9VyYRbxu0nAgFP4lM838Cfy5PElfeLpCq_Rm4$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office July 1, 2026 In reply refer to: Project No. 2088-CA VIA FERC Service Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro Quincy Highway Oroville, CA 95966-5226 Re:Annual Part 12D Status Report for Outstanding Recommendations, Extension of Time Request,and Plan and Schedule for Multiple Items Dear Mr.Moseley: This is in response to a letter dated December 30, 2025, from Ms. Kristen McKillop that submitted a status report for the outstanding recommendations associated with the Twelfth Part 12D report for multiple developments, all of them part of the South Feather Power Project, FERC No. 2088. We have reviewed your submittal and have the following comments: 1.This letter is responsive to the proposed revised plans and schedules and extension of time requests contained in the status report. The nine attached studies will be responded to under separate cover. As a clarifier, the annual status report is intended only to provide the status of the recommendations. Specific deliverables for recommendations (e.g new studies)should be submitted under separate cover. 2.The plan and schedule to submit additional items for recommendations Little Grass Valley R-2, Sly Creek R-27 and Lost Creek R-20 by December 31, 2026,is acceptable. 3.We have reviewed your proposed extension of time and grant your request to submit the analyses from recommendation R-31 for Sly Creek Dam (spillway weir stability analysis) by May 31, 2026. 4.Some of the recommendations involve revisions to the Dam Safety Surveillance and Monitoring Plans (DSSMPs)for the various developments by a proposed 2 date, but it is not clear if those documents will be submitted to us. All revisions to DSSMPs should be submitted for our review and comment. Within 30 days of the date of this letter provide responses to our comments. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program.If you have any questions, please contact Mr.Cody Stephenson at (415)369-3308. Sincerely, Frank L. Blackett, P.E. Regional Engineer