Loading...
HomeMy WebLinkAbout06.26.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Friday, June 26, 2026 9:03:06 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, June 26, 2026 6:36 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/25/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits summaries and conclusions of efforts to address FERC's 06/12/2023 et al. Comment Nos. 3 through 6 et al. on the Nonlinear Stability Analysis re the Bucks Diversion Dam of the Bucks Creek Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260625- 5232__;!!KNMwiTCp4spf!GEXeW6a8SmqmGTjSedG5fRhvWy1wf5Ml82AjFe1bONofQgyLQpDWvi2A-Dr-E8mqCRKYq2iBRUmwoKq1lqiH03bIb-kJJm_XxjJJ$ To modify your subscriptions, click here: Dr-E8mqCRKYq2iBRUmwoKq1lqiH03bIb-kJJtA13TAz$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GEXeW6a8SmqmGTjSedG5fRhvWy1wf5Ml82AjFe1bONofQgyLQpDWvi2A-Dr- E8mqCRKYq2iBRUmwoKq1lqiH03bIb-kJJnpL2Glu$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 25, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Nonlinear Stability Analysis and Summaries and Conclusions for FERC Comments 3–6 and Follow-up FERC Comment ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) Comments 3–6 (23C-3 through 23C-6) and a follow-up comment on 23C-6 on the stability analysis for Bucks Diversion Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received the comment in a letter dated June 12, 2023, and the follow-up comment in a letter dated October 11, 2024. Summaries and conclusions of PG&E’s efforts to address 23C-3 through 23C-6 and the follow-up comments are enclosed with this letter (Enclosure 1). PG&E’s summary of the results of a structural stability analysis for Bucks Diversion Dam is provided in Enclosure 2. The structural stability analysis, prepared by PG&E’s consultant, is provided in Enclosure 3. PG&E has reviewed the consultant report and concurs with the information presented therein. PG&E believes 23C-3 through 23C-6 and the follow-up comment have been satisfactorily addressed by the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for FERC Comments Regarding a Dam Nonlinear Stability Analysis 2. 2026 Stability Analysis Report, prepared by PG&E and dated June 17, 2026 3. Bucks Diversion Dam Seismic Analysis – Phase 2, 3D Analysis Report, prepared by Hatch Engineering and dated June 1, 2026 Document Accession #: 20260625-5232 Filed Date: 06/25/2026 Document Content(s) PGE20260625_0619_BucksDiv-NLAnalysis-CmntsSummaryConclusion_Ltr.pdf.......1 Document Accession #: 20260625-5232 Filed Date: 06/25/2026