HomeMy WebLinkAbout08.20.26 Board Correspondence - FW_ USACE Publishes Draft Yolo Bypass Feasibility Report, Environmental Assessment.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: USACE Publishes Draft Yolo Bypass Feasibility Report, Environmental Assessment
Date:Thursday, August 20, 2026 8:18:49 AM
Attachments:image001.png
Please see Board Correspondence -
Lewis LeeAdministrative Technician - ConfidentialButte County Administration25 County Center Drive, Suite 200 • Oroville, CA 95965T: 530.552.3326www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
From: California Natural Resources Agency <CNRA@public.govdelivery.com>
Sent: Thursday, August 20, 2026 7:13 AM
To: Clerk of the Board <clerkoftheboard@buttecounty.ca.gov>
Subject: USACE Publishes Draft Yolo Bypass Feasibility Report, Environmental Assessment
Yolo Bypass Cache Slough Partnership
Yolo Bypass Cache Slough Partnership
USACE PUBLISHES DRAFT YOLO BYPASS FEASIBILITY
REPORT, ENVIRONMENTAL ASSESSMENT
(August 20, 2026) The United States Army Corps of Engineers Sacramento District published its
Draft Yolo Bypass Interim Integrated Comprehensive Feasibility Report and Environmental
Assessment.
SACRAMENTO, Calif. – The U.S. Army Corps of Engineers Sacramento District published its
Yolo Bypass Draft Interim Integrated Comprehensive Feasibility Report and
Environmental Assessment, outlining proposed actions for the Yolo Bypass Comprehensive
Study.
The Comprehensive Study Authority allows for:
Additional monitoring and adaptive management of the existing Yolo Bypass
System.
Follow-on activities to design and construct flood risk management and aquatic
ecosystem restoration features.
Recommendations for future feasibility studies that could lead to the construction
of new water resources development projects that complement the existing Yolo
Bypass System.
This milestone marks a critical transition in the planning process, leveraging the new RAPID
(Risk-informed, Aligned, Proportional, Iterative, and Decisive) feasibility framework that
allows for expedited decision-making.
"The RAPID planning framework is about getting tangible results for our communities," said
Col. Robert McTighe, commander of the U.S. Army Corps of Engineers Sacramento District.
"This modernized process allows us to deliver thorough, compliant environmental reviews
while accelerating our ability to move projects toward construction. We are committed to
building infrastructure, not paperwork, ensuring we protect communities while enhancing
the Sacramento region."
In collaboration with Central Valley Flood Protection Board, California Department of Water
Resources, and the Sacramento Area Flood Control Agency, the report outlines the
Tentatively Selected Plan, which would expand the bypass and improve flood risk
management for up to 51 miles of the Sacramento River and 13 miles of the Feather River.
About the Yolo Bypass
The Yolo Bypass is crucial in protecting the region from flooding, contributes significantly to the
agricultural economy, enables critical water supply delivery, and is an ecosystem of
national significance. The Yolo Bypass Comprehensive Study will evaluate additional
opportunities for flood risk management, ecosystem restoration, water supply, and recreation
within the Yolo Bypass, a 40-mile-long federal flood management facility
situated between the Fremont Weir and the Sacramento-San Joaquin Delta.
About the Comprehensive Study
This flood risk management plan would provide positive net economic benefits through reduced
risk to communities, including rural areas, and increased long-term agriculture productivity
throughout the study area.
Interested Parties and Public Engagement
Today’s publication initiates a 30-day public review and comment period for the draft feasibility
report and environmental assessment. A public meeting on the documents will be hosted on
Sept. 2 at 10:30 to 11:30 a.m. and 6:30 to 7:30 p.m. via Microsoft Teams.
The public comment period is scheduled to close on Sept. 18, 2026.
A presentation to the Central Valley Flood Protection Board is scheduled for August 28, 2026. To
attend in person or online and for a copy of the agenda, please visit the website at
https://cvfpb.ca.gov/public-meetings/2026-meetings/.
For More Information
A Yolo Bypass Comp Study Factsheet is available here: Yolo
Bypass Comp Study Factsheet
Please visit the Yolo Bypass Comprehensive Study website at
https://www.spk.usace.army.mil/Missions/Civil-Works/Yolo-
Bypass/
Having trouble viewing this email? View it as a Web page.
You are a member of the Yolo Bypass Cache Slough Partnership Listserv administered by
GovDelivery via California Natural Resources Agency <CNRA@public.govdelivery.com>.
Please look for our bulletins to stay informed about YBCS Partnership activities and regional items
of importance for the Central Valley. To opt-out or manage your preferences click here.
Please visit our website: www.ybcspartnership.org
To manage your subscription, click here. Contact us: info@ybcspartnership.org
Please share this notice with your listserv and any other interested
This email was sent to clerkoftheboard@buttecounty.net from the California Natural Resources Agency
utilizing govDelivery. California Natural Resources Agency, 715 P Street, Sacramento, CA 95814
parties.