Loading...
HomeMy WebLinkAbout08.14.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-001 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-001 by Pacific Gas and Electric Company Date:Monday, August 17, 2026 8:29:37 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, August 14, 2026 11:16 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-001 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/14/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-001 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits resumes for additional onsite inspectors for the Haskins Boat Ramp Replacement Project for Bucks Storage Dam, part of the Bucks Creek Hydroelectric Project under P- 619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260814- 5134__;!!KNMwiTCp4spf!H2HhlE2kdqREf-j2R6V- BPrJn92lGtMPpjUUPslHvQBqVi7XuPlLQTpL3eWNfO3p4B-oMrrLT1aLdVgb67HTbMJPq8WeLa6WVDWg$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!H2HhlE2kdqREf- j2R6V-BPrJn92lGtMPpjUUPslHvQBqVi7XuPlLQTpL3eWNfO3p4B- oMrrLT1aLdVgb67HTbMJPq8WeLXAK7NH0$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!H2HhlE2kdqREf-j2R6V- BPrJn92lGtMPpjUUPslHvQBqVi7XuPlLQTpL3eWNfO3p4B-oMrrLT1aLdVgb67HTbMJPq8WeLUOcWQtJ$ or for phone support, call 866-208-3676. Document Accession #: 20260814-5134 Filed Date: 08/14/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 August 14, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Haskins Boat Ramp Replacement – Additional Inspector Resumes Dear Frank L. Blackett: This letter presents additional onsite inspector resumes for the Haskins Boat Ramp Replacement Project for Bucks Storage Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC provided authorization to proceed in a letter dated August 27, 2021. Due to water management limitations on drawing down the reservoir, PG&E has filed EOTs on May 17, 2022, May 2, 2023, December 18, 2024, and April 23, 2025. FERC granted the extensions and requested a final construction report be submitted by January 31, 2027. Due to changes in staffing availability, PG&E is proposing to supplement the project with two additional onsite inspectors, Chadwick Leal and Ramon Lopez. The inspections supervisor role has been updated to Larry McKee. The resumes of the new inspectors and inspections supervisor are enclosed with this letter (Enclosure 1). PG&E believes that the proposed inspectors meet the minimum qualifications outlined in FERC’s guidelines. PG&E respectfully requests FERC’s authorization of the additional personnel. Should you have technical questions concerning this matter, please contact Gavin Rhoads, project engineer for PG&E, at (530) 370-6685. For general questions, please contact Trevor Moore, license coordinator for PG&E, at (530) 205-7345. Sincerely, Kyle Ingvoldsen, P.E. Supervisor, Power Generation Project Engineering Enclosure: 1. Inspectors and Inspection Supervisor Resumes - Chadwick Leal, Ramon Lopez, and Larry McKee Document Accession #: 20260814-5134 Filed Date: 08/14/2026 ENCLOSURE 1 Document Accession #: 20260814-5134 Filed Date: 08/14/2026 LARRY MCKEE SUPERVISOR, POWER GENERATION INSPECTION Email: Larry.McKee@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-537-7006 1 CERTIFICATIONS •ACI – Fundamentals of Concrete Construction •ACI – Fundamentals of Concrete Materials •AWS Certified Welding Inspector No. 08051021 •American Society of Nondestructive Testing ASNT-TC-1A Level 1 •International Code Council Fireproofing No. 5319021-86 •SPRAT Level 1 No.181268 •OSHA Safety Associate Level 1 •ACI Field Level 1 No.00049036 PROFESSIONAL SINCE: 1998 EDUCATION/SEMINARS: •American Concrete Institute (ACI) Low-Density Cellular Concrete and Advanced Engineered Foam Technology •American Society of Nondestructive Testing •American Welding Society (AWS) Welding Technology •American Public Works Association (APWA), Storm Water Management and Construction Inspection •California Geotechnical Engineering Association (CalGeo), Loss Prevention Seminar and Technician Training •California Asphalt Paving Association (CalAPA), Asphalt Industry Leadership Seminar •Structural Engineers Association of California (SEAOC), Codes and Standards Annual Seminar •American Society of Civil Engineers (ASCE), Northern CA Annual Conference •Society of Professional Rope Access Technicians (SPRAT) TRAINING •Introduction to Dam •PG&E Dam Safety Program •Basic Dam Surveillance & Monitoring •Basic Dam Inspections •Basic Dam Maintenance •Inspection of Embankment Dams •Inspection of Concrete and Masonry Dams •Excavation Safety, Competent Person Training •Scaffolding Safety, Competent Person Training •Safety at Heights, Competent Person PROFESSIONAL SUMMARY Mr. McKee has 27 years of construction and inspection experience. •Supervised construction engineering inspection and construction specifications. •Implementation of geotechnical engineering recommendations and requirements. •Prioritized tasks and effectively managed inspection staff on large projects. •Responsible for supervising construction engineering inspection and materials testing for a variety of projects (e.g., hydroelectric electrical transmission, and substation facilities California Department of Water Resource (DWR) and U.S Army Corp or Engineers projects (e.g., flood management, levee buttress, cofferdams, impermeable liners, high-pressure grouting, soil-cement/soil-cement-bentonite projects). •Inspection supervision, including: -Contract document review -Submittal review -Project communication -Quality assurance/quality control/quality control inspection program development and implementation -Inspection/field testing of work for compliance •Monitored construction progress, overall quality control and site safety, schedule and coordination, as-built drawings, and final project closeout. Document Accession #: 20260814-5134 Filed Date: 08/14/2026 LARRY MCKEE SUPERVISOR, POWER GENERATION INSPECTION Email: Larry.McKee@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-537-7006 2 CERTIFICATIONS continued •ACI Aggregate Testing Technician Level 1 No. 00049036 •ACI Adhesive Anchor Installation Inspector No.00049036 •ACI Concrete Strength Testing Technician No.00049036 •Radiation Safety and Nuclear Gauge/Troxler No. 090987 •Radiation Safety Officer (RSO) for Portable Nuclear Gauges •American Heart Association First Aid CPR/AED •VideoRay Remotely Operated Vehicle Certified Operator Training •APWA-Certified Construction Inspector •BIA Certified Storm Water Prevention Pollution Plan •California Safety Training Corporation/Confined Space Training •SCBA 8 Hour Tunnel Rescue Training •40 Hour HAZWOPER 29 CFR 1910.120 and CCR 5192 PROJECTS •Bucks Creek Penstock Alignment Improvements 2025 PG&E SUPERVISOR INSPECTION The project scope consisted of improvements along the alignment of the Bucks Creek Penstocks. The scope of the project includes underground excavation, culvert installation and backfill, catchment wall construction including reinforced concrete construction, improvements to the undermined piers, final grading, and aggregate base placement. Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence. -Setup contracts with local labs to perform material testing. -Verified that the work completed met the project drawings and specifications. •Pit 5 PH Surge Chamber and Valve House Slope Repair 2025 PG&E SUPERVISOR INSPECTION Project scope consisted of removing approximately 300-feet of land slide material by benching into existing slope, rock dowel/soil nail drilling, installation MSE wall, and grouting operations, installing reinforcing steel for shotcrete protective slope, and shotcrete placement per design. Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence. -Setup contracts with local labs to perform material testing. Document Accession #: 20260814-5134 Filed Date: 08/14/2026 LARRY MCKEE SUPERVISOR, POWER GENERATION INSPECTION Email: Larry.McKee@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-537-7006 3 -Verified that the work completed met the project drawings and specifications. •Fordyce Dam Seepage Mitigation 2024–2025 PG&E SUPERVISOR INSPECTION The project scope consisted of improving the existing rockfill embankment, upstream, concrete-faced dam to reduce seepage. The dam is 145 feet high and 1,220 feet long. Appurtenant construction activities included: -Dredging and construction of the 350-foot-long rock-filled cofferdam -Carpi geomembrane liner installation -Hard rock blasting -Rock crushing operations -Water bypass pumping -Water quality evaluation during construction activities -Geotechnical investigation including mud rotary, sonic, rock coring methods, and geophysical surveying Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence. -Setup contracts with local labs to perform material testing. -Verified that the work completed met the project drawings and specifications. •South Yuba Pipe Replacement 2024 PG&E SUPERVISOR INSPECTION The project scope consisted of replacing approximately 240-feet of 56-inch diameter steel pipe damaged during a rockslide event. Work included landslide mitigation, demolition/removal of the existing damaged pipe section, realignment for new pipeline section and construction of reinforced concrete foundations. Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence. -Setup contracts with local labs to perform material testing. -Verified that the work completed met the project drawings and specifications. •Inspection Supervisor Backfill 2017-2024 PG&E PERIODIC AND TEMPORARY SUPERVISOR COVERAGE Temporarily backfilled for inspection supervisor and Quality Control Manager role on numerous occasions between 2017 and 2024. Managed staff assignments and oversight of the inspection support team responsible for quality control on each project and permit adherence. Document Accession #: 20260814-5134 Filed Date: 08/14/2026 LARRY MCKEE SUPERVISOR, POWER GENERATION INSPECTION Email: Larry.McKee@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-537-7006 4 •Fordyce Dam Seepage Mitigation 2021–2022 PG&E LEAD SENIOR INSPECTOR The project scope consisted of improving the existing rockfill embankment, upstream, concrete-faced dam to reduce seepage. The dam is 145 feet high and 1,220 feet long. Appurtenant construction activities included: -Dredging related to the temporary 450-foot-long cofferdam -Roadway improvements (8.5 miles) -Hard rock blasting -Water bypass pumping -Water quality evaluation during construction activities -Geotechnical investigation Responsibilities included: -Oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence -Inspection and testing verification that construction means, methods, and materials conformed to the project drawings specifications and QCIP for the following activities: o Water bypass pumping o Year 1 geotechnical investigation – excavation and backfill of test pits at upstream dam toe o Concrete coring on the dam face and patching o Soils compaction testing using standard test method for in-place density and water content by nuclear method o Sampling and testing of plastic concrete for properties and compressive strength test specimens o Stop work authority •Upper Peak Dam and Spillway Repair 2022 PG&E LEAD SENIOR INSPECTOR The project scope consisted of improving the existing earthfill, drystone masonry dam and mortared rock, masonry spillway channel. Work included armoring the banks of the existing spill channel with rock slope protection (RSP) to protect against designed probable maximum flood (PMF) and removing and backfilling of trees, stumps, and roots from the channel banks and dam toe. Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence Document Accession #: 20260814-5134 Filed Date: 08/14/2026 LARRY MCKEE SUPERVISOR, POWER GENERATION INSPECTION Email: Larry.McKee@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-537-7006 5 -Inspection and testing verification that construction means, methods, and materials conformed to the project drawings specifications and QCIP for the following activities: o Water bypass pumping o Spillway channel excavation o RSP placement o Tree stump/root removal and backfill o Soils compaction testing using both ASTM D6938 for in-place density and water content by nuclear method and ASTM D1556 for density and unit weight of soil in place by sand-cone methods o Stop work authority •Natomas Levee Improvement, Sacramento Area Flood Control Agency 2008–2015 KLEINFELDER SUPERVISORY INSPECTOR The project scope consisted of improving the 42-mile-long Natomas Basin perimeter levee system north of Sacramento to meet the 200-year level of flood protection. The project included: -Construction of 75-foot-deep soil-cement-bentonite (SCB) and soil-bentonite (SB) slurry cutoff walls by deep soil mixing and conventional slurry trench methods -Levee strengthening, including earth embankment construction -Levee slope improvements -Vegetation, tree stump, and root removal -Associated planned levee improvements in accordance with Sacramento Area Flood Control Agency and U.S. Army Corps of Engineer (USACE) regulations. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence -Levee embankment engineered fill placement -Slurry wall construction activities -Tree stump, root, and utility abandonment removal and backfill -Soils compaction testing using both ASTM D6938 for in-place density and water content by nuclear method and ASTM D1556 for density and unit weight of soil in place by sand-cone methods •Kleinfelder Inspection Group Manager/Service Line Director 2008–2016 Construction Materials Testing/Inspection Group Manager and Service Line Director responsible for inspection services, QC/QA, project field reports, construction materials test results, contractor progress schedules, manpower/staffing and equipment verification, DSA, AASHTO/CCRL, and Caltrans laboratory accreditation, Radiation Document Accession #: 20260814-5134 Filed Date: 08/14/2026 LARRY MCKEE SUPERVISOR, POWER GENERATION INSPECTION Email: Larry.McKee@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-537-7006 6 Safety Officer (RSO), daily safety meetings, coordination of project execution, managing inspection of work for compliance to contract documents, project review, planning, As-Built, RFI/Submittal review, cost management, invoicing, and project closeout. Projects included: -2013-2015 Lower Drum Water Conveyance Outage -PG&E/Barnard Alliance Team Pipeline Safety Enhancement Plan (PSEP) -PG&E multiple substation projects -SMUD East Campus Operations Center -Non-Urban Levee Evaluation California Department of Water Resources -Folsom Dam Spillway Concrete Forensic Testing -California Department of Correction and Rehabilitation State Wide On-Call Inspection Program -California Administration Office of the Courts, Northern California New Superior Courts Document Accession #: 20260814-5134 Filed Date: 08/14/2026 RAMON LOPEZ SENIOR INSPECTOR Email: Ramon.Lopez@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-201-8150 1 CERTIFICATIONS •First-Aid/CPR/AED and Wilderness First-Aid/CPR/AED Certified •30 Hour OSHA •40 Hour Hazardous Waste Operations PROFESSIONAL SINCE: 2014 TRAINING •Introduction to Dams •PG&E Dam Safety Program •Basic Dam Surveillance & Monitoring •Basic Dam Inspections •Basic Dam Maintenance •Dam Surveillance and Monitoring •Inspection of Embankment Dams •Inspection of Concrete and Masonry Dams •Basic Rigging and hand signaling •Scaffolding safety, Competent Person Training •Safety at Heights, Competent Person Training. •Excavation Safety, Competent Person Training. •Confined Space, Competent Person Training •LOTO Trained •30 Hour OSHA Training PROFESSIONAL SUMMARY Mr. Lopez has 10 years of construction and inspection experience with a large variety of PG&E Hydro projects. Experience includes: •Construction and maintenance related to powerhouses, switchyards, dams, systems (e.g., penstocks, canals and canal liners, elevated steel structures, tunnels) •Maintenance of underground facilities, slope- stabilization/erosion protection, and roadway projects •Soils related inspection and testing services including vegetation/tree stump root removal, foundation/utility excavations both rock and soils, engineered fill/trench backfill placement, compaction verification with use of both nuclear gauge and sand-cone test methods •Drilling oversight related to piling/pier construction •Directional drilling/trenchless utility construction •Installation of rock anchors, tendons, soldier piles, soil nails, and retaining walls •Performed construction engineering inspection and construction specifications including: -Concrete/shotcrete placement, sampling and testing -High-and-low pressure grouting operations and epoxy injection -Reinforcing steel placement -Structural steel erection including high strength bolting -Post-installed anchors and dowels •Monitor construction progress, overall site safety, schedule and coordination Document Accession #: 20260814-5134 Filed Date: 08/14/2026 RAMON LOPEZ SENIOR INSPECTOR Email: Ramon.Lopez@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-201-8150 2 PROJECTS •Lake Almanor Spillway Joint Replacement – Day Use Improvements 2025 PG&E SENIOR FIELD INSPECTOR The project scope consisted of improvements to the existing day use and spillway access areas. Work included roadway improvements, grading, aggregate base, and hot mix asphalt concrete placement. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Inspection verification of means and methods used, materials placed met the project design drawings, QCIP, and specifications -Soils and aggregate base compaction testing using ASTM D6938 for in-place density and water content by nuclear method -Stop work authority •Wise Forebay Dam – Stump and Root Removal 2024 PG&E SENIOR FIELD INSPECTOR The project scope consisted of improvements to the existing earth fill dam and mortared rock, masonry intake channel. Work included removal, backfill of trees, stumps, and roots from the intake channel banks and toe of dam. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Inspection verification of means and methods used, materials placed met the project design drawings, QCIP, and specifications -Water management -Tree stump/root removal and backfill -Soils compaction testing using ASTM D6938 for in-place density and water content by nuclear method -Stop work authority •South Canal Liner Improvement 2024 PG&E SENIOR FIELD INSPECTOR The project scope consisted of replacing approximately 600’ linear feet of existing deteriorated canal liner on the Newcastle Conveyance System, South Canal. Work included construction of up-stream and down-stream tie-ins, expansion joints, transverse cut-off walls, weep holes, and installation of subdrains. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: Document Accession #: 20260814-5134 Filed Date: 08/14/2026 RAMON LOPEZ SENIOR INSPECTOR Email: Ramon.Lopez@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 530-201-8150 3 -Inspection verification of means and methods used, materials placed met the project design drawings, QC, and specifications -Water bypass pumping -Concrete demolition, upstream and downstream excavation for new liner tie-in -Subsurface preparation, subdrain and drain panel installation -Reinforcing steel replacement -Epoxy dowels/anchors -Shotcrete placement and curing -Field sampling and testing of plastic shotcrete for properties and compressive strength test specimens -Stop work authority •Halsey Tunnels 5 and 6 2024 NV5 INSPECTOR The project scope consisted of liner repairs and miscellaneous maintenance work to the existing horseshoe-shaped concrete lined tunnel section. Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence -Inspection and testing verification that construction means, methods, and materials conformed to the project drawings specifications and QCIP -Water bypass pumping -Rock drilling -Anchor bolt installation with battens -Surface patching -Stop work authority Document Accession #: 20260814-5134 Filed Date: 08/14/2026 CHAD LEAL SENIOR INSPECTOR Email: Chadwick.Leal@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 916-297-2348 1 CERTIFICATIONS •First-Aid/CPR/AED and Wilderness First-Aid/CPR/AED Certified •30 Hour OSHA •40 Hour Hazardous Waste Operations PROFESSIONAL SINCE: 2008 TRAINING •Introduction to Dams •PG&E Dam Safety Program •Basic Dam Surveillance & Monitoring •Basic Dam Inspections •Basic Dam Maintenance •Dam Surveillance and Monitoring •Inspection of Embankment Dams •Inspection of Concrete and Masonry Dams •Basic Rigging and hand signaling •Scaffolding safety, Competent Person Training •Safety at Heights, Competent Person Training. •Excavation Safety, Competent Person Training. •Confined Space, Competent Person Training •LOTO Trained •30 Hour OSHA Training PROFESSIONAL SUMMARY Mr. Leal has 16 years of construction and inspection experience with a large variety of PG&E Hydro projects. Experience includes: •Construction and maintenance related to powerhouses, switchyards, dams, systems (e.g., penstocks, canals and canal liners, elevated steel structures, tunnels) •Maintenance of underground facilities, slope- stabilization/erosion protection, and roadway projects •Soils related inspection and testing services including vegetation/tree stump root removal, foundation/utility excavations both rock and soils, engineered fill/trench backfill placement, compaction verification with use of both nuclear gauge and sand-cone test methods •Drilling oversight related to piling/pier construction •Directional drilling/trenchless utility construction •Installation of rock anchors, tendons, soldier piles, soil nails, and retaining walls •Performed construction engineering inspection and construction specifications including: -Concrete/shotcrete placement, sampling and testing -High-and-low pressure grouting operations and epoxy injection -Reinforcing steel placement -Structural steel erection including high strength bolting -Post-installed anchors and dowels •Monitor construction progress, overall site safety, schedule and coordination Document Accession #: 20260814-5134 Filed Date: 08/14/2026 CHAD LEAL SENIOR INSPECTOR Email: Chadwick.Leal@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 916-297-2348 2 PROJECTS •Lower Bucks Dam Spillway Repair 2024-2025 PG&E SENIOR INSPECTOR The project scope consisted of improving the existing concrete arch dam service spillway. Work included armoring the existing downstream embankment with rock netting and shotcrete, demolition of the existing deteriorated concrete spillway and replacing with structural steel reinforcement and cast-in-place concrete. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Inspection verification of means and methods used, materials placed met the project design drawings, QCIP, and specifications -Water bypass pumping -Spillway channel excavation -Rock netting placement -Rock dowel drilling, installation, grouting, and proof load testing -Reinforcing steel placement -Concrete placement observations -Concrete and grout testing per ACI requirements -Stop work authority •Halsey Tunnels 5 and 6 2024 PG&E LEAD SENIOR INSPECTOR The project scope consisted of liner repairs and miscellaneous maintenance work to the existing horseshoe-shaped concrete lined tunnel section. Responsibilities included: -Staffing and oversight of the inspection support team responsible for managing project quality control, worker safety, and permit adherence -Inspection and testing verification that construction means, methods, and materials conformed to the project drawings specifications and QCIP -Water bypass pumping -Rock drilling -Anchor bolt installation with battens -Surface patching -Stop work authority Document Accession #: 20260814-5134 Filed Date: 08/14/2026 CHAD LEAL SENIOR INSPECTOR Email: Chadwick.Leal@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 916-297-2348 3 •South Canal Liner Improvement 2024 PG&E SENIOR FIELD INSPECTOR The project scope consisted of replacing approximately 600’ linear feet of existing deteriorated canal liner on the Newcastle Conveyance System, South Canal. Work included construction of up-stream and down-stream tie-ins, expansion joints, transverse cut-off walls, weep holes, and installation of subdrains. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Inspection verification of means and methods used, materials placed met the project design drawings, QC, and specifications -Water bypass pumping -Concrete demolition, upstream and downstream excavation for new liner tie-in -Subsurface preparation, subdrain and drain panel installation -Reinforcing steel replacement -Epoxy dowels/anchors -Shotcrete placement and curing -Field sampling and testing of plastic shotcrete for properties and compressive strength test specimens -Stop work authority •Pit 3 Dam Bridge Repair 2022/2023 AST CREW FOREMAN The project scope consisted of concrete rehabilitation to the existing Pit 3 Dam bridge originally constructed in 1922. The Pit 3 Dam bridge consists of a multiple structural steel-encased concrete arches that support the 492-foot-long reinforced concrete bridge over the dam crest. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Concrete demolition -Concrete core drilling -Reinforcing steel replacement -Epoxy dowels/anchors -Concrete subsurface preparation and patching methods -Adhesion/tensile bond strength of concrete overlay -Epoxy injection of cracked concrete -Asphalt concrete pavement placement -Compaction of asphalt concrete pavement using standard test method for density of bituminous concrete in place by nuclear method -Field sampling and testing of plastic concrete for properties Document Accession #: 20260814-5134 Filed Date: 08/14/2026 CHAD LEAL SENIOR INSPECTOR Email: Chadwick.Leal@pge.com Power Generation │ 12840 Bill Clark Way│ Auburn, CA 95602 Phone: 916-297-2348 4 -Compressive strength test specimens •2022 Annual Canal Liner Improvement 2022 AST CREW FOREMAN The project scope consisted of replacing approximately 400’ linear feet of existing deteriorated canal liner on the Lower Drum Conveyance System, Bear River Canal. Work included construction of up-stream and down-stream tie-ins, expansion joints, transverse cut-off walls, weep holes, and installation of subdrains. Responsibilities included inspection for compliance with project drawings, quality control inspection program, and contract specification for: -Inspection verification of means and methods used, materials placed met the project design drawings, QC, and specifications -Water bypass pumping -Concrete demolition, upstream and downstream excavation for new liner tie-in -Subsurface preparation, subdrain and drain panel installation -Reinforcing steel replacement -Epoxy dowels/anchors -Shotcrete placement and curing -Field sampling and testing of plastic shotcrete for properties and compressive strength test specimens Document Accession #: 20260814-5134 Filed Date: 08/14/2026 Document Content(s) PGE20260814_619_Haskins_BoatRmp_Resume_Upd.pdf ...........................1