Loading...
HomeMy WebLinkAbout08.25.26 Board Correspondence - FW_ Delegated Order issued in FERC P-77-000,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-77-000,et al. Date:Tuesday, August 25, 2026 4:17:11 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, August 25, 2026 12:37 PM Subject: Delegated Order issued in FERC P-77-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-77-000 P-96-000 P-137-000 P-175-000 P-233-000 P-606-000 P-619-000 P-803-000 P-1061-000 P-1121-000 P-1354-000 P-1962-000 P-1988-000 P-2105-000 P-2106-000 P-2107-000 P-2130-000 P-2310-000 P-2661-000 P-2687-000 P-2735-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 06/01/2026 request for an extension of time to address Recommendations 4 and 5 from the 2021 external audit of the Owner's Dam Safety Program for the Potter Valley Project et al. under P-77 et al. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260825- 3067__;!!KNMwiTCp4spf!A8-71TNgfbF9APc0XCGSJeUQqmhoMBy5G- wMAykLzGQuDCIghfhM3_pwXgrX6WCDDKei0l53k_87YGmHO7NTo4g7205EJTvdAu_E$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!A8- 71TNgfbF9APc0XCGSJeUQqmhoMBy5G- wMAykLzGQuDCIghfhM3_pwXgrX6WCDDKei0l53k_87YGmHO7NTo4g7205EJfmGtjGn$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A8- 71TNgfbF9APc0XCGSJeUQqmhoMBy5G- wMAykLzGQuDCIghfhM3_pwXgrX6WCDDKei0l53k_87YGmHO7NTo4g7205EJRJX5XxK$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office August 25, 2026 In reply refer to: Project Nos. 77, 96, 137, 175, 233, 606, 619, 803, 1061, 1121, 1354, 1962, 1988, 2105, 2106, 2107, 2130, 2310, 2661, 2687, 2735-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Extension of Time Request for Addressing Recommendations 4 and 5 for the Audit of the Owner’s Dam Safety Program (ODSP) Dear Mr. Cruzen: This is in response to a letter dated June 1, 2026 from Mr. David Ritzman that submitted a request for an extension of time to address Recommendations 4 and 5 (R-4 and R-5) from the 2021 external audit of your ODSP for the projects listed in Enclosure 1. Our Project Engineer contact information is included in Enclosure 2. We have reviewed your proposed extension of time and grant your request to address R-4 and R-5 by February 20, 2027. File your submittals using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filings must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have questions, please contact our engineer assigned to the specific project. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosures (2) Projects Included in Enclosure 1 PG&E’s ODSP External Audit R-4 and R-5 1 of 1 Table 1. Projects Covered by the 2021 ODSP Audit Report Project No.Project Name Engineer 77 Potter Valley Ryan Tom 96 Kerckhoff Samuel Lee 137 Mokelumne River Vincent Vigil 175 Balch Samuel Lee 233 Pit No. 3, 4, and 5 Fenggang Ma 606 Kilarc-Cow Creek Samuel Lee 619 Bucks Creek Eunhye Kim 803 De Sabla-Centerville Eunhye Kim 1061 Phoenix Vincent Vigil 1121 Battle Creek Samuel Lee 1354 Crane Valley Samuel Lee 1962 Rock Creek-Cresta Eunhye Kim 1988 Haas-Kings River Samuel Lee 2105 Upper North Fork Feather River Eunhye Kim 2106 McCloud-Pit Fenggang Ma 2107 Poe Eunhye Kim 2130 Spring Gap-Stanislaus Vincent Vigil 2310 Drum-Spaulding Mynul Chowdhury, Thao Bui 2661 Hat Creek Nos. 1 and 2 Fenggang Ma 2687 Pit No. 1 Fenggang Ma 2735 Helms Samuel Lee FERC Project Engineers Enclosure 2 1 of 1 Table 2. FERC Project Engineer Phone Numbers FERC Engineer Phone Number Ryan Tom (415) 369-3347 Vincent Vigil (415) 369-3315 Fenggang Ma (415) 369-3319 Eunhye Kim (415) 369-3321 Samuel Lee (415) 369-3393 Mynul Chowdhury (415) 369-3313 Thao Bui (415) 369-3312