HomeMy WebLinkAbout08.25.26 Board Correspondence - FW_ Delegated Order issued in FERC P-77-000,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-77-000,et al.
Date:Tuesday, August 25, 2026 4:17:11 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, August 25, 2026 12:37 PM
Subject: Delegated Order issued in FERC P-77-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 8/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-77-000
P-96-000
P-137-000
P-175-000
P-233-000
P-606-000
P-619-000
P-803-000
P-1061-000
P-1121-000
P-1354-000
P-1962-000
P-1988-000
P-2105-000
P-2106-000
P-2107-000
P-2130-000
P-2310-000
P-2661-000
P-2687-000
P-2735-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company granting the 06/01/2026 request for an extension of time
to address Recommendations 4 and 5 from the 2021 external audit of the Owner's Dam Safety Program for the
Potter Valley Project et al. under P-77 et al.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260825-
3067__;!!KNMwiTCp4spf!A8-71TNgfbF9APc0XCGSJeUQqmhoMBy5G-
wMAykLzGQuDCIghfhM3_pwXgrX6WCDDKei0l53k_87YGmHO7NTo4g7205EJTvdAu_E$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!A8-
71TNgfbF9APc0XCGSJeUQqmhoMBy5G-
wMAykLzGQuDCIghfhM3_pwXgrX6WCDDKei0l53k_87YGmHO7NTo4g7205EJfmGtjGn$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A8-
71TNgfbF9APc0XCGSJeUQqmhoMBy5G-
wMAykLzGQuDCIghfhM3_pwXgrX6WCDDKei0l53k_87YGmHO7NTo4g7205EJRJX5XxK$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
August 25, 2026
In reply refer to:
Project Nos. 77, 96, 137, 175, 233,
606, 619, 803, 1061, 1121, 1354,
1962, 1988, 2105, 2106, 2107,
2130, 2310, 2661, 2687, 2735-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Extension of Time Request for Addressing Recommendations 4 and 5 for the Audit of
the Owner’s Dam Safety Program (ODSP)
Dear Mr. Cruzen:
This is in response to a letter dated June 1, 2026 from Mr. David Ritzman that submitted
a request for an extension of time to address Recommendations 4 and 5 (R-4 and R-5) from the
2021 external audit of your ODSP for the projects listed in Enclosure 1. Our Project Engineer
contact information is included in Enclosure 2. We have reviewed your proposed extension of
time and grant your request to address R-4 and R-5 by February 20, 2027.
File your submittals using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office
from the eFiling menu. The cover page of the filings must indicate that the material was
eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your continued efforts in this aspect of our dam safety program. If you
have questions, please contact our engineer assigned to the specific project.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosures (2)
Projects Included in Enclosure 1
PG&E’s ODSP External Audit R-4 and R-5
1 of 1
Table 1. Projects Covered by the 2021 ODSP Audit Report
Project No.Project Name Engineer
77 Potter Valley Ryan Tom
96 Kerckhoff Samuel Lee
137 Mokelumne River Vincent Vigil
175 Balch Samuel Lee
233 Pit No. 3, 4, and 5 Fenggang Ma
606 Kilarc-Cow Creek Samuel Lee
619 Bucks Creek Eunhye Kim
803 De Sabla-Centerville Eunhye Kim
1061 Phoenix Vincent Vigil
1121 Battle Creek Samuel Lee
1354 Crane Valley Samuel Lee
1962 Rock Creek-Cresta Eunhye Kim
1988 Haas-Kings River Samuel Lee
2105 Upper North Fork Feather River Eunhye Kim
2106 McCloud-Pit Fenggang Ma
2107 Poe Eunhye Kim
2130 Spring Gap-Stanislaus Vincent Vigil
2310 Drum-Spaulding Mynul Chowdhury, Thao Bui
2661 Hat Creek Nos. 1 and 2 Fenggang Ma
2687 Pit No. 1 Fenggang Ma
2735 Helms Samuel Lee
FERC Project Engineers Enclosure 2
1 of 1
Table 2. FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Ryan Tom (415) 369-3347
Vincent Vigil (415) 369-3315
Fenggang Ma (415) 369-3319
Eunhye Kim (415) 369-3321
Samuel Lee (415) 369-3393
Mynul Chowdhury (415) 369-3313
Thao Bui (415) 369-3312