HomeMy WebLinkAbout08.25.26 Board Correspondence - FW_ Comment on Filing submitted in FERC P-619-001,et al. by Individual No Affiliation,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney,
Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Comment on Filing submitted in FERC P-619-001,et al. by Individual No Affiliation,et al.
Date:Tuesday, August 25, 2026 4:17:22 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, August 25, 2026 3:16 PM
Subject: Comment on Filing submitted in FERC P-619-001,et al. by Individual No Affiliation,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 8/26/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Individual No Affiliation
Individual No Affiliation (as Agent)
Docket(s): P-619-001
P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Comment on Filing
Description: Comment of John S Muller in Docket(s)/Project(s) P-619-001, P-619-000Submission Date: 8/25/2026
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260826-
5001__;!!KNMwiTCp4spf!D5sFCu4uwArceeHpDEQ8lKnaXbv0R2hkqAZA1MfoBT7cjuLCz2i_ZLL5Cc0bAiRYdDCwDrU67s4PN-9roC9-gpLDUycanKJAl56D$
To modify your subscriptions, click here:
9roC9-gpLDUycanKsHHX7h$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!D5sFCu4uwArceeHpDEQ8lKnaXbv0R2hkqAZA1MfoBT7cjuLCz2i_ZLL5Cc0bAiRYdDCwDrU67s4PN-9roC9-
gpLDUycanFJW7OdS$
or for phone support, call 866-208-3676.
John S Muller, Murphys, CA.
1)To: RecInfor@PGE.com:
I have just returned from my annual camping trip to Haskins Valley Campground, where I
have been camping all my life (70 years this year!). “Rumor Control” has it that a new
road is going to be cut into the hillside below camps 55-63, with the addition of new
campsites.
Can you please verify if this rumor is correct? If so, can you please share what stage
this plan is in and possibly send some renderings of what may be planned? If it is only
in the planning stages, can you provide the contact information of the person/department
who is making the decisions?
Thank you,
John Muller
1091 Sandalwood Dr.
Murphys, CA 95247
(209) 728-8674
Jsmuller12@comcast.net
2)Initial Response:
Good Afternoon,
Yes, the “rumor” described below sounds generally accurate.
The planning and conceptual designs for the recreation improvements were completed during
the Bucks Creek relicensing processes and are included in the 2019 Bucks Creek Recreation
Management Plan (RMP).
The RMP is available in the FERC e-Library at the following page: Accession Number
20190920-5141. Once on the eLibrary page, click on the “Public_Bucks_Enclosures_8-13.PDF”
(the RMP is Enclosure 8). General design considerations for all facilities begins on page
3-7. The scope of the Haskins improvements begins on page 3-11, and conceptual drawings
of the Haskins improvements are on pages 3-12 and 3-13.
Thank You,
Jim McKay, Senior Land Planner
Pacific Gas and Electric Company
2642 Hegan Lane, Chico, CA 95928
james.mckay@pge.com
3)My reply to Mr. McKay:
Mr. McKay,
Thank you for sending the information on Haskins Campground. It is very thorough in
describing plans for the campground and surrounding areas.
I am very dismayed and disappointed to learn of this development which appears to have
been in the late planning stages for several years now. It may be too late for any
public input but I will provide some none the less. I have been camping at Haskins all
my life. At age 70, I figure I have maybe 10 years more to enjoy camping. Both of my
grandfathers hunted and fished this area in the 40’s and 50’s. This year we have our 5th
generation of family coming to Haskins Campground. Bucks Lake has reached mythical
proportions to our extended family.
I always camp in the upper loop, along with many families of cousins and friends. We
often occupy 6-8 camps in this upper loop. Sites 55-63 are the most beautiful sites in
Haskins, providing space, shade and filtered views of the Haskins inlet. These campsites
are large and spacious, unlike many of the more crowded sites in the lower campground,
some of which are right on top of each other like in Yosemite Valley. Due to the narrow
road in the upper loop, most trailers (and their generators) thankfully stay down below,
keeping things relatively quiet up here. We also have access to walk down across the
(proposed development area) to the inlet without bothering anyone or traipsing through
their camp.
It looks like the plan is to add maybe 5 or so campsites. During my recent trip to
Haskins over the last two weeks, I noticed survey stakes with orange ribbons so maybe the
project is imminent now. This would be an absolute travesty for the following reasons:
-It would not be safe or advisable to access them from the Haskins boat ramp road so
that means cutting in some kind of access road (and probably adding another restroom)
below camps 55-63.
-This would also require removal of many old growth trees, which currently provide
shade and beauty to these sites.
-much wildlife currently traverses these sites at night, on their way to the inlet for
food and water
-The sites are already quite hot as the sun tracks through the day but currently
provide filtered shade.
-Accessing Haskins inlet would now require a much longer walk down/up the current hilly
roads at either end of the loop.
Document Accession #: 20260826-5001 Filed Date: 08/26/2026
-the current views will now be impeded by the access road and looking out over
campsites and potentially campers and trailers
-the noise level will rise with the addition of 5 sites and potentially more generators
4)Mr. McKay forwards my message to Mr. Sam Hillaire:
5)Mr. Hillaire reaches out to me:
6)Additional comments to FERC:
Document Accession #: 20260826-5001 Filed Date: 08/26/2026
Just because the Bucks Creek RMP “can” fit in 5 new sites in the proposed location,
doesn’t mean that it “should”. There will be no “going back” once this is ruined. At
minimum, and as a compromise, and due to the already- limited access, perhaps these new
sites could be made into “small sites” for camping-only (no RV’s, motorhomes and their
generators)? Better yet, eliminate this addition entirely.
Document Accession #: 20260826-5001 Filed Date: 08/26/2026
Document Accession #: 20260826-5001 Filed Date: 08/26/2026
Document Content(s)
149714.txt................................................................1