Loading...
HomeMy WebLinkAbout09.02.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric Company Date:Wednesday, September 2, 2026 1:54:33 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, September 2, 2026 11:56 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/2/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 04/30/2028 to provide the Final Construction Report on the replacement of flood gate chains at Poe Dam, part of the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260902- 5091__;!!KNMwiTCp4spf!Ay2q06MtpJiTcUI2_QH33NausANEXkKfkvg7RFN5JyrkFw1VQa4uYMm6l_1ByIgZjbT3ixTkjCbgAGj_F4ffXhxfDcm7UzGvafbg$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Ay2q06MtpJiTcUI2_QH33NausANEXkKfkvg7RFN5JyrkFw1VQa4uYMm6l_1ByIgZjbT3ixTkjCbgAGj_F4ffXhxfDcm7U39WIwmX$ or for phone support, call 866-208-3676. Document Accession #: 20260902-5091 Filed Date: 09/02/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 2, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107-CA Poe Dam, NATDAM No. CA00328 Replacement of Flood Gate Chains – Final Construction Report Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to provide the final construction report on a project to replace lifting chains for flood gates at Poe Dam, which is part of PG&E’s Poe Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2107. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted its original project package to FERC in a letter dated June 15, 2023, and provided its most recent update for the project package in a letter dated February 28, 2025. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Chris Tomes, dam safety engineer for PG&E, at (818) 584-9944. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request Document Accession #: 20260902-5091 Filed Date: 09/02/2026 Document Content(s) PGE20260902_2107_Poe_FloodGateChain_EOT_Ltr.pdf...........................1