Loading...
HomeMy WebLinkAbout08.26.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:BOS Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, August 27, 2026 2:29:07 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, August 26, 2026 2:06 PM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/26/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits results and plan and schedule for further action re the Seismic Analysis of Alternatives re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260826- 5189__;!!KNMwiTCp4spf!CWKG_UEyMBRIn4TQzuunws1Yj1V4MAUJKIIJg73KrMMUxPmMAk-vk_R2KGjtnxqpdneAtajigyJidkYR0jec8TZRK9JM3Z1WHM3B$ To modify your subscriptions, click here: vk_R2KGjtnxqpdneAtajigyJidkYR0jec8TZRK9JM3b9Nte64$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CWKG_UEyMBRIn4TQzuunws1Yj1V4MAUJKIIJg73KrMMUxPmMAk- vk_R2KGjtnxqpdneAtajigyJidkYR0jec8TZRK9JM3TabpiTP$ or for phone support, call 866-208-3676. Document Accession #: 20260826-5189 Filed Date: 08/26/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 August 26, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Seismic Analysis of Alternatives – Discussion of Results and Plan and Schedule for Further Action ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the results of an analysis of alternatives (AoA) to address seismic deficiencies at Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. PG&E submitted its original plan and schedule for providing the results of the AoA in a letter to FERC dated February 25, 2025. PG&E’s discussion of the results of the AoA and plan and schedule for further action are enclosed with this letter (Enclosure 1). The AoA report is provided in (Enclosure 2). PG&E has reviewed the enclosed report and concurs with the information presented therein. Although the report includes a recommended alternative for potential improvements, PG&E recognizes that the engineering alternatives evaluated as part of the study are conceptual and based on limited information. PG&E considers the alternatives and recommendations presented in the report to be preliminary and subject to potential changes based on additional investigation and analysis. The actual scope and timing of any future projects depend on the results of further study. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Discussion of Results of Analysis of Alternatives and Plan and Schedule for Further Action 2. Alternatives Analysis, Philbrook Dam Seismic Retrofit Project, prepared by Slate Geotechnical Consultants and dated August 10, 2026 Document Accession #: 20260826-5189 Filed Date: 08/26/2026 Document Content(s) PGE20260826_803_Philbrook_StabilityAoA_Plan&Sch_Ltr.pdf ..................1 PGE20260826_803_Philbrook_StabilityAoA_Plan&Sch_Ltr ......................1