Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, August 27, 2026 1:36 PM
Subject: Compliance Directives issued in FERC P-619-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 8/27/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Compliance Directives
General Correspondence
Description: Letter to Pacific Gas and Electric Company providing comments on the 12/06/2024 et al. response to FERC's Comment No. 1 re the Probabilistic Flood Hazard Analysis etc. for the Bucks Lake Dam, part of the Bucks
Creek Project under P-619.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260827-
3070__;!!KNMwiTCp4spf!AjUZGBVxuKqxZz7_HShz_wW_yRX6cAEotNiNjqIskV3eEsPeyfj5Tv9Bti32BJepQcdK4XTqALTLVRTuz08ZnN0AVRLRcBJCmtvF$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AjUZGBVxuKqxZz7_HShz_wW_yRX6cAEotNiNjqIskV3eEsPeyfj5Tv9Bti32BJepQcdK4XTqALTLVRTuz08ZnN0AVRLRcHd-AH2t$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
Document Accession #: 20260827-3070 Filed Date: 08/27/2026
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
August 27, 2026
In reply refer to:
Project No.619-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re: Probabilistic Flood Hazard Analysis (PFHA)for Recommendation 3 from the 11th
Part 12D Safety Inspection Report
Dear Mr. Cruzen:
This is in response to letters dated December 6, 2024 and March 31, 2025 from
Mr. Robert Ellis that submitted a response to our comment No. 1 regarding the PFHA
using stage-frequency analysis,and a response to our comment Nos 1 through 3 on the
PFHA for Recommendation 3 from the 11th Part 12D Safety Inspection Report for Bucks
Lake Dam, which is part of the Bucks Creek Project, FERC No. 619. We have reviewed
the submittals,and we have the following comments:
1.The March 31, 2025 report from RTI recommends that “…when assessing the
probability of overtopping,consider both the streamflow-based analysis results
alongside the Stochastic Event Flood Model (SEFM)analysis results.”. It is
unclear how you would combine both SEFM and RMC-RFA curves for your risk
analysis since these analyses are two different approaches but being used to
develop a representative Hydrologic Hazard Curve (HHC or Stage-Frequency
Curve) for the project, independently. In addition, there is a significant AEP
discrepancy between these two methods. Clarify RTI’s recommendation and how
it will be applied.
2.Your 2024 submittal used the HEC-SSP tool instead of the RMC-Bestfit to
determine the flow frequency curve applied in the RMC-RFA tool to develop the
HHC. Evaluate whether your 2024 analysis could better address the 11th Part 12D
Recommendation 3 by utilizing the RMC-BestFit instead of the HEC-SSP to
determine a more representative flood frequency curve by incorporating additional
critical information, such as: a) quantile priors to reduce the uncertainties for the
Document Accession #: 20260827-3070 Filed Date: 08/27/2026
2
extreme events, b) investigating and incorporating historical and paleoflood
information, and c) other refinements to better match the empirical data and to
improve uncertainty for the extreme events.
An additional sensitivity test could be performed using the RMC-RFA model to
determine if it produces similarly inconsequential impacts to the SEFM model
with 50% blockage of the spillway.
3.Note that your cover letter does not indicate your concurrence with the report. In
the future, this may be considered grounds for rejection due to lack of documented
review and concurrence with a consultant’s report.
Within 45 days of the date of this letter, please address our comments or provide a
plan and schedule to address our comments. File your submittal using our eFiling system
at https://www.ferc.gov/ferc-online/overview.When eFiling, select Hydro: Dam Safety;
San Francisco Regional Office from the eFiling menu. The cover page of the filing must
indicate that the material was eFiled. For assistance with eFiling, contact FERC Online
Support at FERCOnlineSupport@ferc.gov,(866) 208-3676 (toll free), or (202) 502-8659
(TTY).
We appreciate your cooperation in this aspect of our dam safety program. If you
have any questions,contact Ms. Eunhye Kim at (415)369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
cc:
Erik Malvick -Division Manager
CA Dept. of Water Resources
Division of Safety of Dams
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
c/o Shawn.Jones@water.ca.gov
Document Accession #: 20260827-3070 Filed Date: 08/27/2026
Document Content(s)
P-619-000_66888_81837_c1-3_R3_11P12D_BucksLake.docx.pdf ..................1