HomeMy WebLinkAbout09.11.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen;
Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000
Date:Friday, September 11, 2026 4:06:53 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, September 11, 2026 9:56 AM
Subject: Delegated Order issued in FERC P-619-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 9/11/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company accepting the 08/14/2026 resumes of Larry McKee et al. for the Haskins Boat Ramp
Replacement Project at the Bucks Lake Dam, part of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260911-
3042__;!!KNMwiTCp4spf!HDQ35OJPERMHwu2t8MgBbXa0PYRdcFUBibLxCZkAl-
WApHyu1tjYOUObLtVoP_UBi7b4XCOTeC40mTzZ5Uh6rXmUcBtDuKMrEj1H$
To modify your subscriptions, click here:
WApHyu1tjYOUObLtVoP_UBi7b4XCOTeC40mTzZ5Uh6rXmUcBtDuOkSgMgo$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HDQ35OJPERMHwu2t8MgBbXa0PYRdcFUBibLxCZkAl-
WApHyu1tjYOUObLtVoP_UBi7b4XCOTeC40mTzZ5Uh6rXmUcBtDuKSHEHqM$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
Document Accession #: 20260911-3042 Filed Date: 09/11/2026
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
September 11, 2026
In reply refer to:
Project No. 619-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Haskins Boat Ramp Replacement –Resumes
Dear Mr. Cruzen:
This is in response to a letter dated August 14, 2026,from Mr. Kyle Ingvoldsen
that submitted three resumes for one inspection supervisor and two additional field
inspectors for the Haskins Boat Ramp Replacement project at Bucks Lake Dam, which is
part of Bucks Creek Hydroelectric Project, FERC No. 619. The resume of Mr. Larry
McKee to serve as inspection supervisor role, and the resumes of Mr. Chadwick Leal and
Mr. Ramon Lopez to serve as additional field inspectors,are acceptable.
We appreciate your continued efforts in this aspect of our dam safety program.If
you have any questions, contact Ms. Eunhye Kim at (415) 369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260911-3042 Filed Date: 09/11/2026
Document Content(s)
P-619-000_122167_HaskinsBoatRampRpl_resumes.docx.pdf......................1