Loading...
HomeMy WebLinkAbout09.11.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Friday, September 11, 2026 4:06:53 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, September 11, 2026 9:56 AM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/11/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company accepting the 08/14/2026 resumes of Larry McKee et al. for the Haskins Boat Ramp Replacement Project at the Bucks Lake Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260911- 3042__;!!KNMwiTCp4spf!HDQ35OJPERMHwu2t8MgBbXa0PYRdcFUBibLxCZkAl- WApHyu1tjYOUObLtVoP_UBi7b4XCOTeC40mTzZ5Uh6rXmUcBtDuKMrEj1H$ To modify your subscriptions, click here: WApHyu1tjYOUObLtVoP_UBi7b4XCOTeC40mTzZ5Uh6rXmUcBtDuOkSgMgo$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HDQ35OJPERMHwu2t8MgBbXa0PYRdcFUBibLxCZkAl- WApHyu1tjYOUObLtVoP_UBi7b4XCOTeC40mTzZ5Uh6rXmUcBtDuKSHEHqM$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov Document Accession #: 20260911-3042 Filed Date: 09/11/2026 FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office September 11, 2026 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Haskins Boat Ramp Replacement –Resumes Dear Mr. Cruzen: This is in response to a letter dated August 14, 2026,from Mr. Kyle Ingvoldsen that submitted three resumes for one inspection supervisor and two additional field inspectors for the Haskins Boat Ramp Replacement project at Bucks Lake Dam, which is part of Bucks Creek Hydroelectric Project, FERC No. 619. The resume of Mr. Larry McKee to serve as inspection supervisor role, and the resumes of Mr. Chadwick Leal and Mr. Ramon Lopez to serve as additional field inspectors,are acceptable. We appreciate your continued efforts in this aspect of our dam safety program.If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260911-3042 Filed Date: 09/11/2026 Document Content(s) P-619-000_122167_HaskinsBoatRampRpl_resumes.docx.pdf......................1