Loading...
HomeMy WebLinkAbout09.17.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Thursday, September 17, 2026 11:05:21 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, September 17, 2026 9:26 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/17/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits summaries and conclusions of efforts to address FERC's 09/09/2026 Comments 1-3 on the Oro Fino 1.3 Overhead Project at the DeSabla Forebay Dam of the DeSabla- Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260917- 5189__;!!KNMwiTCp4spf!BTeu581RnvjXPKUn349oTYfGmcFwLOaduWBLLinb3UmG1qZ8kzb95KGQOuewXOmD5sfbgJNQXsCo22z_BbJNIZqqJkIEmgpxm9sT$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BTeu581RnvjXPKUn349oTYfGmcFwLOaduWBLLinb3UmG1qZ8kzb95KGQOuewXOmD5sfbgJNQXsCo22z_BbJNIZqqJkIEmtsb-c7Q$ or for phone support, call 866-208-3676. Document Accession #: 20260917-5189 Filed Date: 09/17/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 17, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA DeSabla Forebay Dam, NATDAM No. CA00343 Oro Fino 1.3 Overhead Project Summaries and Conclusions for FERC Comments 1–3 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1 through C-3) on the Oro Fino overhead project for DeSabla Forebay Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E submitted the original request for construction authorization in a letter dated April 9, 2026. PG&E received FERC’s original comments in a letter dated June 11, 2026, which PG&E addressed in a letter dated July 23, 2026. PG&E received C-1 through C-3 in a letter dated September 9, 2026. Summaries and conclusions of PG&E’s efforts to address C-1 through C-3 are enclosed with this letter (Enclosure 1). Also enclosed are revised construction documents, including the project description (Enclosure 2), quality control inspection program (Enclosure 3), and a temporary construction emergency action plan (Enclosure 4). PG&E believes C-1 through C-3 have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. PG&E plans to release the project to construction in fall of 2026. PG&E plans to provide a final construction report within 90 days of completing construction, otherwise PG&E will provide an update on the project status and a plan and schedule for further action by January 7, 2027. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for FERC Comments 1–3 on the Oro Fino 1.3 Overhead Project 2. DeSabla Forebay Dam, Oro Fino 1102 Electric Undergrounding Project – Phase 1.3 Overhead, Project Description, prepared by PG&E and dated September 2026 3. DeSabla Forebay Dam, Oro Fino 1102 Electric Undergrounding Project – Phase 1.3 Overhead, Quality Control and Inspection Plan, Revision 3, prepared by PG&E and dated September 2026 4. DeSabla Forebay Dam, Oro Fino 1102 Electric Undergrounding Project – Phase 1.3 Overhead, Temporary Construction Emergency Action Plan, Revision 3, prepared by PG&E and dated September 2026 cc: See Attached List Document Accession #: 20260917-5189 Filed Date: 09/17/2026 Frank L. Blackett, P.E., Regional Engineer September 17, 2026 Page 2 cc via secure file transfer w/enclosures Matthew Buckman, Area Engineer Department of Water Resources, Division of Safety of Dams Matthew.Buckman@water.ca.gov Document Accession #: 20260917-5189 Filed Date: 09/17/2026 Document Content(s) PGE20260917_803_Orofino1.3_ConstAuth_Resp_Ltr.pdf.........................1