Loading...
HomeMy WebLinkAbout09.17.26 Board Correspondence - FW_ Delegated Order issued in FERC P-2107-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-2107-000 Date:Thursday, September 17, 2026 11:05:32 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, September 17, 2026 10:06 AM Subject: Delegated Order issued in FERC P-2107-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/17/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 09/02/2026 request for an extension of time for the Final Construction Report for the Lifting Chain Replacement Project for the flood gates at the Poe Dam, part of the Poe Project under P-2107. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260917- 3056__;!!KNMwiTCp4spf!FWHHBcuJ7QrgwKMz7YEQLjDZHSnQzM6TFP4BnCYAnaLvFs3DKFz8EgIYiNc2bl9q1_yq9TiC0UBXTg9mM0c7ElcdPzqxTI_Y3t8V$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FWHHBcuJ7QrgwKMz7YEQLjDZHSnQzM6TFP4BnCYAnaLvFs3DKFz8EgIYiNc2bl9q1_yq9TiC0UBXTg9mM0c7ElcdPzqxTC-7nPem$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov Document Accession #: 20260917-3056 Filed Date: 09/17/2026 FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office September 17, 2026 In reply refer to: Project No. 2107-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Lifting Chain Replacement Project for Flood Gates Dear Mr. Cruzen: This is in response to a letter dated September 2, 2026 from Mr. Robert Ellis that submitted a request for an extension of time for the final construction report for the lifting chain replacement project for the flood gates at Poe Dam, which is part of the Poe Project, FERC No. 2107. We have reviewed your proposed extension of time and grant your request to submit the final construction report by April 30, 2028. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filings must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260917-3056 Filed Date: 09/17/2026 Document Content(s) P-2107-000_122689_Poe_gates_lifting chains_EOT.docx.pdf ..................1