Loading...
HomeMy WebLinkAbout10.14.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Wednesday, October 14, 2026 4:26:54 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, October 14, 2026 12:46 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/14/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Comprehensive Assessment Report for the 12th Part 12D Safety Inspection re the Philbrook Dam of the DeSabla-Centerville Hydro Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20261014- 5146__;!!KNMwiTCp4spf!GiTQ47EIx341PDnCrrzJMTk_YEPTQwJ65FLh657g5vM-DT4lPFUiF2KXB_D6Z38eGvL5K- EVP9irmUrsknGgzgAzFlTuI0xj8FoL$ To modify your subscriptions, click here: DT4lPFUiF2KXB_D6Z38eGvL5K-EVP9irmUrsknGgzgAzFlTuI-U8Hrcm$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GiTQ47EIx341PDnCrrzJMTk_YEPTQwJ65FLh657g5vM- DT4lPFUiF2KXB_D6Z38eGvL5K-EVP9irmUrsknGgzgAzFlTuI80i_jcu$ or for phone support, call 866-208-3676. FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office October 14, 2026 In reply refer to: Project Nos. 77, 96, 137, 175, 233, 606, 619, 803, 1061, 1121, 1354, 1962, 1988, 2105, 2106, 2107, 2130, 2310, 2661, 2687, and 2735-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Results of Standards and Procedures Review for Debris Boom Program Management for the Owner’s Dam Safety Program (ODSP) Dear Mr. Cruzen: This is in response to a letter dated June 1, 2026,from Mr. David Ritzman that submitted the review of ODSP standards, processes, and procedures for inspecting and maintaining your inventory of debris booms for the projects listed in Enclosure 1. Our Project Engineer contact information is included in Enclosure 2. We have reviewed the submittal and find your plan and schedule to submit a report on the development of your debris boom asset management program by June 30, 2028,acceptable. However, with the Super El Nino winter being forecast for this winter, we strongly encourage you to pay very close attention to the debris in your reservoirs that could potentially accumulate on your debris booms and cause them to fail while continuing to develop your asset management program. No response is required to this letter. For all future filings, file your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety;San Francisco Regional Office from the eFiling menu. The cover page of the filings must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). 2 We appreciate your continued efforts in this aspect of our dam safety program. If you have questions, please contact our engineer assigned to the specific project. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosures (2) cc: Erik Malvick -Division Manager Division of Safety of Dams California Department of Water Resources 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Shawn.Jones@water.ca.gov Projects Included in Enclosure 1 PG&E’s ODSP Debris Boom Review 1 of 1 Table 1. Projects, Project Engineers and Phone Numbers Covered by the 2021 ODSP Audit Report Project No.Project Name Engineer 77 Potter Valley Ryan Tom 96 Kerckhoff Samuel Lee 137 Mokelumne River Vincent Vigil 175 Balch Samuel Lee 233 Pit No. 3, 4, and 5 Fenggang Ma 606 Kilarc-Cow Creek Samuel Lee 619 Bucks Creek Eunhye Kim 803 De Sabla-Centerville Eunhye Kim 1061 Phoenix Vincent Vigil 1121 Battle Creek Samuel Lee 1354 Crane Valley Samuel Lee 1962 Rock Creek-Cresta Eunhye Kim 1988 Haas-Kings River Samuel Lee 2105 Upper North Fork Feather River Eunhye Kim 2106 McCloud-Pit Fenggang Ma 2107 Poe Eunhye Kim 2130 Spring Gap-Stanislaus Vincent Vigil 2310 Drum-Spaulding Mynul Chowdhury, Thao Bui 2661 Hat Creek Nos. 1 and 2 Fenggang Ma 2687 Pit No. 1 Fenggang Ma 2735 Helms Samuel Lee FERC Project Engineers Enclosure 2 1 of 1 Table 2. FERC Project Engineer Phone Numbers FERC Engineer Phone Number Ryan Tom (415) 369-3347 Vincent Vigil (415) 369-3315 Fenggang Ma (415) 369-3319 Eunhye Kim (415) 369-3321 Samuel Lee (415) 369-3393 Mynul Chowdhury (415) 369-3313 Thao Bui (415) 369-3312