Loading...
HomeMy WebLinkAbout040-233-027 ehs23-0213 9236 Holland as builtCCOONNTTRRAACCTTOORR’’SS AASS--BBUUIILLTT RREEPPOORRTT Update: September 12, 2014 Staff Use Only Date Received: _______________ Verified in Field: Yes  No  Inspector: ___________________ Property Owner: ________________________________________________________________ Mailing Address: ________________________________________________________________ Property Address: _________________________________________________  SAME AS MAILING ADDRESS APN #: ______________________________TrakIt #:__________________________________ Designer: ______________________________ Installer: ________________________________ All items below must be completed by the installer. N/A Yes No I. SEPTIC TANK A)>5 ft. from foundation?  B)>50 ft from wells and surface water?  C)Bldg stub-out to septic tank: clean-out if not 1-2%?  D)Sanitary Ts in tank intact and clean?  E)Risers installed for access?  F)Leak test performed   G)Tank Size: __________ gal.; Manufacturer_________________________ II.DISPERSAL FIELD A)>5 ft from foundation and >5 ft from property lines?  B)>100 ft from wells and surface water?  C)>10 ft from potable water lines?  D)Distribution box leveled with water?  E)Laterals level to +/- 1 inch & end caps present if not looped?  F) Gravelless chambers utilized?  G) System dimensions the same as shown on the design?  H) Gravel clean, properly sized, and proper depth?  I) Observation ports present?  III.ADDITIONAL ITEMS FOR PRESSURE SYSTEMS A) Sand quality as specified on design?  B) Head height uniform and 24 inches? Actual head height_____  C) Clean-outs and observation ports present?  D) Mound: Side Slope 3:1?  IV. PUMP/PUMP CHAMBER A)Screen basket or effluent filter (circle one) installed?  B)Riser installed for access?  C)Alarm installed?  D)Pump make ____________________; Pump model ____________________________ E)Chamber size ___ gal; ___ gal/inch; Chamber Manufacture ______________________ F)Pump chamber draw-down ________ inches per minute; Height of pump off bottom of pump chamber ______ inches G)Pump controls: Timer (or) Elapsed Time Meter (circle if installed); If timer is used: Pump On ____ Pump Off____ Certification of Installation I certify that I installed the system without any deviation from the design stamped “APPROVED” by Butte County Environmental Health? __________________________________________________ Certified Installer Date Th i s s e c t i o n c o m p l e t e d b y C e r t i f i e d I n s t a l l e r Form AS Julie Alexander 9236 Holland Ave Durham, Ca 95938 Levi Magneson 040-233-027 xx xxxx 1500 Roth - poly xxx xxx x x x xx xx xx x 08/11/2023 EHS23-0213 9236 Holland Ave